• 제목/요약/키워드: Track verification

검색결과 105건 처리시간 0.028초

궤도구조 성능검증체계 및 선정프로세스 구축 (Development of Verification System and Selection Process for Track Structure)

  • 이호룡;장승엽;김연국;윤성순
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.292-298
    • /
    • 2010
  • Recently, with the beginning of the commercial operation of high-speed railway, there have been a number of changes in track structure fields. Also, it is expected that the development and introduction of new technology will be increased afterwards. However, it accompanies a lot of risk to install new track structures of which performance and safety are not verified on permanent ways with high traffic density. Therefore, to minimize the risk and enhance the adoption of new technology, it is required to develop a systemic verification system for track structure. To do this, in this paper, main contents of a draft of guidelines for track structure verification, and main issues in debate such as criteria and method for verification, test conditions and test periods are discussed. Also, a process to choose a most appropriate one for a specific project out of proven track structures by the above verification system, the selection process by the technical investigation committee and the VE process to analyze the economical and maintenance aspects based on LCC concept in Korea Rail Network Authority is introduced.

  • PDF

고속철도 궤도의 곡선부 주행안전성 평가 (Study for Safety on the Curve in the High-speed Railway Track)

  • 서사범;이동호;구봉근
    • 한국철도학회논문집
    • /
    • 제8권4호
    • /
    • pp.354-360
    • /
    • 2005
  • The railway track and the substructures constructed in the field test section of Kyongbu High Speed Line are the structures for HSL, for the first time designed and constructed by domestic technical group. It is very important to verify the local design criteria and specifications for these structures and also to assure the recordings for vibration or deflection produced on the essential parts of the structures. The study to verify the high-speed railway track performance and to ensure the run in safety on the track in curved section during the KTX run. Finally, the conclusion are drawn as follows. The measuring values of the deflection effort of the rail and displacement for verifying the track performance in the field test section of Kyoungbu HSL satisfy the criteria of the foreign countries (Japan and Germany). The measured value for the wheel load and the presumed value show the consistent tendency. The wheel loads of the exterior and interior of the rails at the speed superior to 300km/h are measured same. Finally, the comparison between the theoretical value presented during the verification of the derailment to evaluate the safety of the train run at the time of the detailed design of the track and the measured value in the field shows that the correct design of track structure was applied.

고속철도 레일 체결장치 성능 평가방법 및 기준검토 (Efficiency Review for the Evaluation Method and standard for High speed Railway Rail Fastening System)

  • 김인재;강기동;한상철;양신추
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.818-823
    • /
    • 2004
  • In case of the Korea Railroad, when we would decide the track structure, it has been introduced the whole track structure system based on only the foreign application cases and data offered by manufacturers without the process of the objective performance verification. The value of property for track materials, derived from the calculation of track structure, was hard to perform the objective performance evaluation among track structure systems because each manufacturer adopted the different test method and standard. To solve the above-mentioned problem, it should suggest the technical and objective evaluation method about the performance of track materials and meet with the standard of High Speed railroad and international railroad through the establishment and revision of performance standard. In the objective and technical respects, it will be a major role to decide the track structure. In this paper, I would like to summarize the case which was improved the problem of test method and standard exposed from the performance verification of Rail Fastening System among the track structure systems of High speed railroad.

  • PDF

실측을 통한 궤도설계 파라메타의 검증 (Experimental Verification of Design Parameters of Track)

  • 이지하;황성호;나성훈;김정환;서사범
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 춘계학술대회 논문집
    • /
    • pp.1065-1070
    • /
    • 2004
  • When the track designer analyze the track structure uses many known & unknown parameters. Unknown parameters, equivalent rail support spring factor, unit rail support spring factor, track damping coefficient, should be assumed. Known parameters are section properties (area, section factor, etc), material properties(modulus of elasticity, mass, etc) and track conditions(wheel load, loading conditions, gauge, etc.). In the assumption of track design parameters, some parameters can be overestimated or under estimated. The purpose of this study is to verify design parameters used in track design, in the way of experimental measurements. Data of displacements, banding stresses, loads, accelerations are measurable at track site. From these data, unknown parameters are derived. Compare these assumed and derived parameters, estimate the entire track stability.

  • PDF

성남~여주 복선전철 부발차량기지 배선 효율성 검증 (Verification Efficiency the Trian Depot)

  • 김병국;우성원;정재형;신현곤
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.2077-2081
    • /
    • 2011
  • Recently the train indusrty come to the fore because of Punctual, eco-friendly transportation system and becoming the main transportation. The construction plans for the trian depot for train's maintenance and storage increase constantly. For past few years, there were many construction plans, Bubal train depot, Gwangju train depot, Duckha train depot. Proper track distribution plan is important to carry out the design of railway depot for efficient maintenance operation and train storage. Through the proper design of track distribution plan, we can shorten the moving time, train movement distance, waiting time in train depot. In this paper, the verification of the track distribution plan's efficiency and appropriateness for railway depot as Bubal train depot's plan is studied and analyzed with the train depot management simulation program-Posrail(v1.0).

  • PDF

철도종합시험선로 구축 필요성 및 추진 기본전략 (Needs & Strategy for the Construction of Railroad Test Track)

  • 김태욱;이희업;최원일
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.2107-2114
    • /
    • 2011
  • To carry out the evaluation of performance of railway product/system, 3 step verification process(design review-lab test-field test) should be done. In advanced countries, for the effective field test, test-only-oriented track have been constructed and used. In Korea, government announced "The construction plan of railroad test track" at 2009.06. This paper will summarize 'need of test track', 'technical meaning of test track', 'current status of foreign test track', 'fundamental plan and process strategy of Korea Railroad Test Track'. It is no need to say that the wisdom of all railroad related people is required for the successful construction and usage of Korea Railroad Test Track.

  • PDF

연동도표검증을 위한 알고리즘 개발 (A Study on An Algorithme Verification of Interlocking Signalling Chart)

  • 이종우;이재호;정의진
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 B
    • /
    • pp.1264-1266
    • /
    • 2002
  • We have developed interlocking signalling chart using computer. The basic tool for the automatic signalling chart is table which represent relation between routes and track circuit and track circuit and switch, from track layout being traced using CAD system. In this paper, three elements to be considered are proposed when the signalling chart is build.

  • PDF

고속철도 적용을 위한 콘크리트 도상 분기기 개발 및 부설 (Construction and Development of Turnout on concrete roadbed applicable to high speed railway)

  • 박춘복;권호진;전세곤;윤병현;오수진;최용석
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1223-1228
    • /
    • 2007
  • Since KHSL 2nd phase was adapted as a main track design, the interests of concrete slab track system have been gradually increased in the division of rail track engineering and many engineering companies have been trying to adapt a concrete slab track system at this moment. Advantages of this system proved in advanced country, japan and Germany etc. are excellent maintenance, track stability and increasing of buckling resistance This developed turnout is same with the KHSR 1st phase's design and applications rules, components and signaling system since it observes KTX specification. Comparing it with the former turnout, High-elasticity pad, lubrication-free roller slide plate and Rheda2000 PC sleeper are only different. The purpose of this study is the development of high speed turnout on concrete slab track and its application on site. Now these studies are going to show the verification and confidence about the interface between ballast-track and concrete slab track by finding and solving the possible problems when it is installed on site and to make these turnouts applied perfectly and completely on concrete slab track. Its first trial construction in korea had been successfully completed at Sangju-station on July 20th ,2007 thanks to KORAIL and KR. Hereunder Sampyo E&C trys to introduce all of turnout technologies on concrete slab track system with Rheda 2000 sleeper

  • PDF

무인잠수정의 경로점 유도 법칙 설계 및 HILS 검증 (Development of AUV's Waypoint Guidance Law and Verification by HILS)

  • 황종현;유태석;한용수;김현욱
    • 한국정보통신학회논문지
    • /
    • 제24권11호
    • /
    • pp.1417-1423
    • /
    • 2020
  • 본 논문에서는 수중에서 운동하는 무인잠수정의 경로점 유도법칙을 제안한다. 시선각 유도법칙과 수선경로 오차를 줄여가는 경로추종 유도법칙을 조합하여 효과적인 경로점 유도법칙을 설계하였고, 수선경로 오차의 거리에 따라 제어이득을 변화시켜 시스템의 안정성을 증가시켰다. 또한, 관성항법장치와 도플러속도계를 이용한 복합항법 시스템의 성능을 확인할 수 있는 HILS를 구성하였다. 같은 경로점 및 목표점을 입력 후 HILS 수행결과와 실해역 주행시험 결과를 비교하여, 제안한 유도법칙 및 HILS가 올바르게 구성되어 있음을 확인하였다.

뜬침목구간에서 차량/궤도 상호작용 수치해석기법 개발 (Development of a Numerical Method of Vertical Train/Track Interaction in the Track Section with Hanging Sleepers)

  • 양신추;이지하
    • 한국철도학회논문집
    • /
    • 제15권3호
    • /
    • pp.251-256
    • /
    • 2012
  • 고속철도 자갈궤도에서 궤도틀림을 체계적이고 효율적으로 관리하기 위해서는 뜬 침목구간에서 차량이 궤도에 미치는 동하중의 특성을 파악할 필요가 있으며 이를 위해서는 뜬 침목을 고려한 차량과 궤도의 동적 상호작용해석기법의 개발이 필요하다. 본 연구에서는 초기 레일의 처짐이 없는 경우 궤광자중에 의하여 발생한 레일처짐(궤도틀림)과 처진 침목과 자갈도상간의 침목 들뜸량을 계산할 수 있는 해석기법을 개발하였고, 궤도틀림과 침목 들뜸량을 동시에 고려할 수 있는 차량과 궤도의 해석기법을 개발하였다. 본 해석기법의 타당성은 타문헌에서 제시한 해석결과와 비교를 통하여 검증하였다.