• Title/Summary/Keyword: Track verification

Search Result 105, Processing Time 0.036 seconds

Development of Verification System and Selection Process for Track Structure (궤도구조 성능검증체계 및 선정프로세스 구축)

  • Lee, Ho-Ryong;Jang, Seung-Yup;Kim, Yeon-Guk;Yun, Sung-Soon
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.292-298
    • /
    • 2010
  • Recently, with the beginning of the commercial operation of high-speed railway, there have been a number of changes in track structure fields. Also, it is expected that the development and introduction of new technology will be increased afterwards. However, it accompanies a lot of risk to install new track structures of which performance and safety are not verified on permanent ways with high traffic density. Therefore, to minimize the risk and enhance the adoption of new technology, it is required to develop a systemic verification system for track structure. To do this, in this paper, main contents of a draft of guidelines for track structure verification, and main issues in debate such as criteria and method for verification, test conditions and test periods are discussed. Also, a process to choose a most appropriate one for a specific project out of proven track structures by the above verification system, the selection process by the technical investigation committee and the VE process to analyze the economical and maintenance aspects based on LCC concept in Korea Rail Network Authority is introduced.

  • PDF

Study for Safety on the Curve in the High-speed Railway Track (고속철도 궤도의 곡선부 주행안전성 평가)

  • Seo Sa-Bum;Lee Dong-Ho;Koo Bong-Kue
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.4
    • /
    • pp.354-360
    • /
    • 2005
  • The railway track and the substructures constructed in the field test section of Kyongbu High Speed Line are the structures for HSL, for the first time designed and constructed by domestic technical group. It is very important to verify the local design criteria and specifications for these structures and also to assure the recordings for vibration or deflection produced on the essential parts of the structures. The study to verify the high-speed railway track performance and to ensure the run in safety on the track in curved section during the KTX run. Finally, the conclusion are drawn as follows. The measuring values of the deflection effort of the rail and displacement for verifying the track performance in the field test section of Kyoungbu HSL satisfy the criteria of the foreign countries (Japan and Germany). The measured value for the wheel load and the presumed value show the consistent tendency. The wheel loads of the exterior and interior of the rails at the speed superior to 300km/h are measured same. Finally, the comparison between the theoretical value presented during the verification of the derailment to evaluate the safety of the train run at the time of the detailed design of the track and the measured value in the field shows that the correct design of track structure was applied.

Efficiency Review for the Evaluation Method and standard for High speed Railway Rail Fastening System (고속철도 레일 체결장치 성능 평가방법 및 기준검토)

  • Kim In-Jae;Kang Kee-Dong;Han Sang-Chul;Yang Shin-Choo
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.818-823
    • /
    • 2004
  • In case of the Korea Railroad, when we would decide the track structure, it has been introduced the whole track structure system based on only the foreign application cases and data offered by manufacturers without the process of the objective performance verification. The value of property for track materials, derived from the calculation of track structure, was hard to perform the objective performance evaluation among track structure systems because each manufacturer adopted the different test method and standard. To solve the above-mentioned problem, it should suggest the technical and objective evaluation method about the performance of track materials and meet with the standard of High Speed railroad and international railroad through the establishment and revision of performance standard. In the objective and technical respects, it will be a major role to decide the track structure. In this paper, I would like to summarize the case which was improved the problem of test method and standard exposed from the performance verification of Rail Fastening System among the track structure systems of High speed railroad.

  • PDF

Experimental Verification of Design Parameters of Track (실측을 통한 궤도설계 파라메타의 검증)

  • Lee Jee-Ha;Hwang Sung-Ho;Na Sung-Hoon;Kim Jung-Hwan;Suh Sa-Bum
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1065-1070
    • /
    • 2004
  • When the track designer analyze the track structure uses many known & unknown parameters. Unknown parameters, equivalent rail support spring factor, unit rail support spring factor, track damping coefficient, should be assumed. Known parameters are section properties (area, section factor, etc), material properties(modulus of elasticity, mass, etc) and track conditions(wheel load, loading conditions, gauge, etc.). In the assumption of track design parameters, some parameters can be overestimated or under estimated. The purpose of this study is to verify design parameters used in track design, in the way of experimental measurements. Data of displacements, banding stresses, loads, accelerations are measurable at track site. From these data, unknown parameters are derived. Compare these assumed and derived parameters, estimate the entire track stability.

  • PDF

Verification Efficiency the Trian Depot (성남~여주 복선전철 부발차량기지 배선 효율성 검증)

  • Kim, Byung-Kook;Woo, Sung-Won;Jung, Jae-Hyung;Shin, Hyun-Gon
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2077-2081
    • /
    • 2011
  • Recently the train indusrty come to the fore because of Punctual, eco-friendly transportation system and becoming the main transportation. The construction plans for the trian depot for train's maintenance and storage increase constantly. For past few years, there were many construction plans, Bubal train depot, Gwangju train depot, Duckha train depot. Proper track distribution plan is important to carry out the design of railway depot for efficient maintenance operation and train storage. Through the proper design of track distribution plan, we can shorten the moving time, train movement distance, waiting time in train depot. In this paper, the verification of the track distribution plan's efficiency and appropriateness for railway depot as Bubal train depot's plan is studied and analyzed with the train depot management simulation program-Posrail(v1.0).

  • PDF

Needs & Strategy for the Construction of Railroad Test Track (철도종합시험선로 구축 필요성 및 추진 기본전략)

  • Kim, Tae-Wook;Lee, Hee-Up;Choi, Won-Ill
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2107-2114
    • /
    • 2011
  • To carry out the evaluation of performance of railway product/system, 3 step verification process(design review-lab test-field test) should be done. In advanced countries, for the effective field test, test-only-oriented track have been constructed and used. In Korea, government announced "The construction plan of railroad test track" at 2009.06. This paper will summarize 'need of test track', 'technical meaning of test track', 'current status of foreign test track', 'fundamental plan and process strategy of Korea Railroad Test Track'. It is no need to say that the wisdom of all railroad related people is required for the successful construction and usage of Korea Railroad Test Track.

  • PDF

A Study on An Algorithme Verification of Interlocking Signalling Chart (연동도표검증을 위한 알고리즘 개발)

  • Lee, Jong-Woo;Lee, Jae-Ho;Joung, Eui-Jin
    • Proceedings of the KIEE Conference
    • /
    • 2002.07b
    • /
    • pp.1264-1266
    • /
    • 2002
  • We have developed interlocking signalling chart using computer. The basic tool for the automatic signalling chart is table which represent relation between routes and track circuit and track circuit and switch, from track layout being traced using CAD system. In this paper, three elements to be considered are proposed when the signalling chart is build.

  • PDF

Construction and Development of Turnout on concrete roadbed applicable to high speed railway (고속철도 적용을 위한 콘크리트 도상 분기기 개발 및 부설)

  • Park, Choon-Bok;Kwon, Ho-Jin;Jeon, Se-Gon;Yoon, Byung-Hyun;Oh, Soo-Jin;Choi, Yong-Seok
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1223-1228
    • /
    • 2007
  • Since KHSL 2nd phase was adapted as a main track design, the interests of concrete slab track system have been gradually increased in the division of rail track engineering and many engineering companies have been trying to adapt a concrete slab track system at this moment. Advantages of this system proved in advanced country, japan and Germany etc. are excellent maintenance, track stability and increasing of buckling resistance This developed turnout is same with the KHSR 1st phase's design and applications rules, components and signaling system since it observes KTX specification. Comparing it with the former turnout, High-elasticity pad, lubrication-free roller slide plate and Rheda2000 PC sleeper are only different. The purpose of this study is the development of high speed turnout on concrete slab track and its application on site. Now these studies are going to show the verification and confidence about the interface between ballast-track and concrete slab track by finding and solving the possible problems when it is installed on site and to make these turnouts applied perfectly and completely on concrete slab track. Its first trial construction in korea had been successfully completed at Sangju-station on July 20th ,2007 thanks to KORAIL and KR. Hereunder Sampyo E&C trys to introduce all of turnout technologies on concrete slab track system with Rheda 2000 sleeper

  • PDF

Development of AUV's Waypoint Guidance Law and Verification by HILS (무인잠수정의 경로점 유도 법칙 설계 및 HILS 검증)

  • Hwang, Jong-Hyon;Yoo, Tae-Suk;Han, Yongsu;Kim, Hyun Wook
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.24 no.11
    • /
    • pp.1417-1423
    • /
    • 2020
  • This paper proposes a waypoint guidance algorithm for the Autonomous Underwater Vehicle(AUV). The proposed simplified guidance algorithm is presented, which is combined LOS guidance and cross-track guidance for path following. Cross-track error is calculated using the position of the AUV and reference path. LOS guidance and cross-track guidance are appropriately changed according to cross-track error. And the stability of the system has been improved using variable cross-track control gain by cross-track error. Also, in this paper, navigation hardware in-the loop simulation(HILS) is implemented to verify navigation algorithm of AUV that performs combined navigation using inertial navigation device and doppler velocity log(DVL). Finally, we design integrated system HILS (including navigation HILS) for performance verification of guidance algorithm of the autonomous underwater vehicle. By comparing the sea test result with HILS result, the proposed guidance algorithm and HILS configuration were confirmed be correct.

Development of a Numerical Method of Vertical Train/Track Interaction in the Track Section with Hanging Sleepers (뜬침목구간에서 차량/궤도 상호작용 수치해석기법 개발)

  • Yang, Sin-Chu;Lee, Jee-Ha
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.3
    • /
    • pp.251-256
    • /
    • 2012
  • Hanging sleepers are frequently observed in the ballasted track with the rail of high rigidity. These hanging sleepers at the high speed line could cause such large dynamic force compared to those at the conventional line. This dynamic force would, in turn, deteriorate train running stability as well as riding comfort, and accelerate irregularity of track and failure of track materials, leading to a sharp increase in track maintenance cost. When the wheel-rail contact spring exhibits nonlinear behavior and some components of the system like hanging sleeper exhibit bi-linear behaviors, an effective analytical method is proposed for train-track interactions. The verification of the present method is carried out comparing numerical results by the present method and those by Ono's method of RTRI.