• Title/Summary/Keyword: Track roadbed

Search Result 117, Processing Time 0.032 seconds

Dynamic behavior of Track/Roadbed with Loading Frequency in Concrete Track through Full Scale Model Test (실대형 실험을 이용한 가진주파수 변화에 따른 콘크리트궤도의 동적평가)

  • Choi, Chanyong;Kim, Hunki;Eum, Kiyoung;Kang, Yunsuk
    • Journal of the Korean Geosynthetics Society
    • /
    • v.13 no.3
    • /
    • pp.39-47
    • /
    • 2014
  • In this study, the full scale model tests were performed with track-roadbed system such as Ho-nam high speed railway. The measured data gives good similar a roadbed pressure with equivalent depth to the Odemark's theory. In the case of earth pressures have a under 50 kPa at upper-subgrade applying 330 kN static loading. Results of cyclic loading tests did not differ significantly from those of static loading test. The elastic displacement at HSB layer has a level of 1/100 compared to the 1 mm that it was evaluation criteria for speed up of High Speed Railway. Elastic displacement at subgrade layer was measured a level of 1/175. The dynamic characteristics of track-roadbed with loading frequency level were linearly increased under 35 Hz, while the wheel loading, displacement and acceleration of roadbed were decreased loading frequency above 35 Hz.

Settlement and Bearing Capacity of Roadbed Subjected to Tilting-train Loading in Various Ground Conditions

  • Jeon, Sang-Soo
    • International Journal of Railway
    • /
    • v.8 no.2
    • /
    • pp.35-41
    • /
    • 2015
  • Tilting-train is very attractive to the railroad users in the world due to the advantage of high speed in curved track using pre-existing infrastructure of railway. Tilting-train has a unique allowable speed and mechanism especially in curved track. In this work, when tilting-train is operated with the allowable speed, the behavior of roadbed is evaluated by examining its settlement and bearing capacity. Additionally, the stability of roadbed is estimated as the roadbed is in the condition of soft soil influenced by the weather effects and cyclic train loading. Numerical results show that the roadbed settlement satisfies the allowable settlement when the elastic modulus of upper roadbed should be greater than $5000t/m^2$.

A Study on the Method of preventing from Reduction of AF Track Circuit Signal Current on a Ferroconcrete Roadbed (철근콘크리트 도상에서 AF 궤도회로 신호전류 저감방지대책에 관한 연구)

  • Hong, Hyo-Sik;Yoo, Kwang-Kiun;Rho, Sung-Chan
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.5
    • /
    • pp.500-503
    • /
    • 2010
  • Until now, the track circuit with railroad which is a part of an electrical circuit wad used only for the detection of the train location, but as train speed is up to be higher, in order to overcome the limits of ground signal system the railway signal system has changed from the ground signal system to a cab signal system. The power source of the track circuit has also changed from a direct current or a high voltage impulse to an alternating current with high frequency which is a part of the audio frequency. To improve the maintenanability and according to the environment condition, the railway roadbed is rapidly changed to the ferroconcrete roadbed. In case of a track circuit to use an alternating current with high frequency as power source at a ferroconcrete roadbed, the characteristic of the track circuit is brought on a change from a loss of the magnetic combination instead of a leakage current from electric insulation which was caused by the reinforcing iron pod with lattice shape for durability. This paper is shown the influence and the loss of the signal current at AF track circuit on a ferroconcrete in the simulation sheets and presented a proposal for the preventive method from reduction of signal current.

PRCG Method to restore settled concrete track and structure (침하된 콘크리트궤도 및 구조물의 복원을 위한 PRCG공법)

  • Lee, Il-Wha;Lee, Sung-Jin;Lee, Su-Hyung;Kang, Tae-Ho;Shin, Hak-Yong
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.866-871
    • /
    • 2010
  • Various design factors should be considered in order to apply the concrete slab track system on the soil/rock roadbed. One of the important factors is the settlement of roadbed. This settlement of concrete track should be supervised under the allowable settlement limit. If the settlement of roadbed under the concrete track exceed the allowable limit, the train serviceability will considerably come down and furthermore the fatal disaster may happen. Therefore, in this paper we introduced a PRCG(pressurized rapid-hardening cement grouting) method as a settlement restoration method that can be suitably adopted to the concrete slab track.

  • PDF

Dynamic Analysis of Structure's Approaches through Field Tests in the Conventional Railway (현장계측을 통한 기존선 철도 구조물 접속부의 거동분석)

  • Park, Joon-Oh;Lee, Sang-Bae;Hong, Won-Pyo
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1864-1874
    • /
    • 2007
  • Korean trains pass many mountain areas, so the volume of structures like bridge and tunnel has large part of railway lines. Train speed-up naturally needs a straight line in railway, then structures are increasing, and the length of structure has more than 70% in Kyongbu high-speed railway. The stiffness of bridge and tunnel is higher than the soil in the roadbed in spite of dynamic difference in vibration and displacement. Differences in stiffness have more dynamic effects and increase the deformation and destruction in the track and roadbed. This influences passenger's comfort and the safety of operation, and it needs more track maintenance. This study selected tunnel with ballast track, tunnel with concrete track, and structure's approaches with short maintenance cycle in the roadbed and had track acceleration tests and track liner inspections using track master in the field. This study will measure periodically to structure's approaches which have very fast track irregularity and analyze dynamic differences and track irregularity near structure's approaches, so realize the cause of track irregularity of structure's approaches and use basic data for reasonably strengthening method of structure's approaches.

  • PDF

A Study on Wearing of Rail and Adjustment of Cant in Accordance with Increase in Running Speed of Train (열차운행속도 상승에 따른 레일마모 및 캔트조정 연구)

  • Shin, Gil-Cheol;Joo, Bong-Gyu;Chung, Sung-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1121-1128
    • /
    • 2007
  • Subway routes $1{\sim}4$ were constructed in gravel roadbed track structure in consideration of the technological capabilities, construction cost and duration at the time of the initial construction. As such, 224.8km, approximately 81.2% of entire length, of total length of railway track at 276.9km was constructed on gravel roadbed. However, improvement of gravel roadbed to concreted roadbed began in 1998 due to problems including frequent repair works and limited time application for such works caused by occurrence of tract distortion during operation as well as lowering of roadbed functions and generation of dust caused by frictional power, impact absorption capabilities, abrasion and crushing of gravel on roadbed. Currently, this improvement is continuing with target of converting entire route into concreted roadbed structure. Therefore, this Study modifies formula for setting cant, analyze the correlation between wearing of rail side of the curvature and cant insufficiency following increasing of the running speed of the train, and to present the directions for fundamental review for adjustment of cant insufficiencies at the time of improvement of gravel roadbed to concreted roadbed that is being implemented on the operational tracks of the railway trains.

  • PDF

A Study on Wearing of Rail and Adjustment of Cant in Accordance with Increase in Running Speed of Train (속도 상승에 따른 캔트조정 사례 분석)

  • Shin, Gil-Cheol;Yang, Hoe-Seong;Joo, Bong-Gyu;Chung, Sung-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.151-157
    • /
    • 2008
  • Subway routes $1\sim4$ were constructed in gravel roadbed track structure in consideration of the technological capabilities, construction cost and duration at the time of the initial construction. As such, 224.8km, approximately 81.2% of entire length, of total length of railway track at 276.9km was constructed on gravel roadbed. However, improvement of gravel roadbed to concreted roadbed began in 1998 due to problems including frequent repair works and limited time application for such works caused by occurrence of tract distortion during operation as well as lowering of roadbed functions and generation of dust caused by frictional power, impact absorption capabilities, abrasion and crushing of gravel on roadbed. Currently, this improvement is continuing with target of converting entire route into concreted roadbed structure. Therefore, this Study modifies formula for setting cant, analyze the correlation between wearing of rail side of the curvature and cant insufficiency following increasing of the running speed of the train, and to present the directions for fundamental review for adjustment of cant insufficiencies at the time of improvement of gravel roadbed to concreted roadbed that is being implemented on the operational tracks of the railway trains.

  • PDF

Evaluation of the Roadbed Behavior During Tilting-train Operation in Curved Track Using Numerical Analysis (틸팅차량의 곡선부 운행시 수치해석을 이용한 노반거동 평가)

  • Jeon, Sang-Soo;Eum, Gi-Young;Kim, Jae-Min
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.6
    • /
    • pp.115-126
    • /
    • 2007
  • The tilting-train is very attractive to the railroad users in the world because it runs with high speed in curved track using pre-existing infrastructure. The tilting-train has a unique allowable speed and mechanism expecially in curved track. Therefore, it should be evaluated in terms of the stability of the train operation and roadbed. In this study, when the tilting-train is being operated with the allowable speed, the behavior of the roadbed is evaluated by examining the settlement and bearing capacity of the roadbed. Additionally, the stability of the roadbed is estimated in the condition of soft roadbed influenced by the weather effects and cyclic train loading. The numerical results show that the roadbed settlements satisfy the allowable settlement when Young's moduli of the upper roadbed and in-situ soil are more than $2,300t/m^2\;and\;3,300t/m^2$, respectively, in the continuous welded rail (CWR) and $3,800t/m^2\;and\;4,600t/m^2$, respectively, in the rail joint.

Tilting Train-induced Roadbed Response on the Conventional Line (틸팅열차 주행시 기존선 흙 노반의 응답특성)

  • Koh, Tae-Hoon;Kwak, Yeon-Suk;Hwang, Seon-Keun;SaGong, Myung
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.5
    • /
    • pp.433-441
    • /
    • 2011
  • It is a fact that the straightening of track alignment is one of the undoubted ways to improve the train speed on conventional lines, while that requires huge investment resources. Therefore, the operation of a tilting train as well as the minimum improvement of track is suggested as an effective and economical alternative way for the speed-up of conventional lines. Since a driving mechanism of tilting train is different from those of existing trains, in order to make sure its operation safety and stability on conventional line, the performance of track and roadbed must be preferentially evaluated on the conventional line. Furthermore, it is necessary to estimate the tilting-train-induced roadbed response in detail since the roadbed settlement can lead to the track deformation and even derailment. In this research, the patterns of wheel load and lateral force were monitored and analyzed through the field tests, and the derailment coefficient and degree of wheel off-loading were calculated in order to evaluate the tilting train running safety depending on the running speeds (120km~180km) on the conventional line. Moreover, roadbed pressure, settlement and acceleration were also observed as tilting-train-induced roadbed responses in order to estimate the roadbed stability depending on the running speeds. Consequently, the measured derailment coefficient and degree of wheel off-loading were satisfied with their own required limits, and all of the roadbed responses were less than those of existing high-speed train (KTX) over an entire running speed range considered in this study. As a result of this study, the tilting train which will be operated in combination with existing trains is expected to give no adverse impact on the conventional line even with its improved running speed.

Dynamic Properties of Hydraulic Mechanically Stabilized Slag as Railroad Material (철도노반재로서 수경성입도조정고로슬래그의 동적 물성특성)

  • 황선근;이일화;이성혁;최찬용
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.391-398
    • /
    • 1999
  • Dynamic properties of hydraulic mechanically stabilized slag(HMS25) was studied for utilizing it as a roadbed material. HMS25 is a by product material during pig iron production process. It has a very good potential application as a roadbed material. Therefore, the resonant column and torsional shear tests were carried out to evaluate the dynamic properties of HMS25 which are necessary for designing roadbed of railroad track. As a result, it was found that HMS25 has excellent dynamic properties required for roadbed material used in railroad track.

  • PDF