• Title/Summary/Keyword: Track dynamic analysis

Search Result 347, Processing Time 0.025 seconds

Dynamic analysis of eddy current brake system for design evaluation (와전류 제동장치 설계검증을 위한 동역학적 해석)

  • Chung, Kyung-Ryul;T. Benker
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2002.11a
    • /
    • pp.318.1-318
    • /
    • 2002
  • In this paper, the results of an analysis of the dynamic behavior of the eddy current brake(ECB) system are presented. The measured irregularity of the track in Korean high speed line and the track irregularity given by ERRI(high level) were used for simulation. The wheel-rail profile combination were analyzed with different rail gauges. A model of the bogie with an substitute body fur the carbody was implemented in the Multi-Body-Simulation Program Simpack. (omitted)

  • PDF

Analysis of Dynamic Behavior for Design Review of the Korean High Speed Prototype Test Train (한국형 고속전철 시제차량 설계검증을 위한 동특성 해석)

  • ;;Johannes Picht
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2001.05a
    • /
    • pp.1232-1240
    • /
    • 2001
  • In this study. a computer simulation of the Korean High Speed Prototype Test Train was performed to investigate the dynamic behavior(running stability. safety and comfort) in detail design process. The simulation model which was prepared by ADAMS/Rail V10.l consists of power car and middle car assembly (2 motorized cars + 3 trailer cars). The nonlinear analysis takes into account the full vehicle model including wheel/rail contact and the influence of disturbed track. Throughout the dynamic calculation of KHST on the straight and the curved track. accelerations in car body. ride comforts and wheel rail forces were investigated.

  • PDF

Evaluation of Dynamic Stability of Precast Floating Slab Track with Vehicle-Track Interaction Analysis (차량-궤도 상호작용 해석을 통한 사전 제작형 플로팅 슬래브 궤도의 동적 안정성 검토)

  • Jang, Dongdoo;Kim, Jin-Ho;Kwon, Se-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.3
    • /
    • pp.562-568
    • /
    • 2017
  • A precast floating slab track with a 5m slab panel and installed with isolators is proposed to solve the noise and vibration problem at existing elevated railway stations. Thus, the construction can be carried out rapidly without interrupting the train operation. However, dynamic instability problems may be caused by repeated discontinuities in track due to the short slab panel length and excessive rail displacement due to the inherent operation mechanism of a floating system in reducing the vibration. Furthermore, the difference of the supporting stiffness at the transition between the floating track and ballast track may raise problems. In this study, the assessment factors to evaluate the dynamic stability of the precast floating slab track are presented and assessed with the vehicle-track interaction analysis. Through the analysis, all values relevant to the stability at the floating track section are found to be acceptable, and the slab panels at the transition section are designed to satisfy the stability.

An Experimental Study on Causes Evaluation of Rail Corrugation for Concrete track(STEDEF) in Urban Transit (도시철도 콘크리트궤도(STEDEF)의 레일파상마모 발생원인 분석을 위한 실험적 연구)

  • Choi, Jung-Youl;Gong, Hyung-Sik;Kim, Jun-Hyung;Kim, Hak-Seon;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.4 no.4
    • /
    • pp.413-418
    • /
    • 2018
  • The purpose of this study is to investigate the cause of rail corrugation and the track force for concrete track (STEDEF) in the urban transit. From the field measurements, the dynamic wheel load, vertical displacement of sleeper and rail bending stress were measured and it was evaluated by regarding to the rail corrugation. As a result of the study, the causes of rail corrugation was experimentally proved by frequency analysis using measured dynamic wheel load data. The influence of corrugation on dynamic wheel load, rail bending stress and sleeper displacement was evaluated that the periodic irregularities of rail corrugation on the rail surface amplified the dynamic track force such as the dynamic wheel load, and thus the rail bending stress and the vertical displacement of sleeper could be increased by a maximum of 1.7 times.

Dynamic Anlaysis of High Mobility Tracked Vehicles (고속주행용 궤도차량의 동적해석)

  • 김상두;이승종
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.9 no.1
    • /
    • pp.205-215
    • /
    • 2001
  • In this study, modeling and analysis procedure for the dynamic analysis of a high mobility tracked vehicle system were studied. The vehicle model used in this investigation is assumed to be consist of two kinematically decoupled subsystems. The chassis subsystem consists of chassis frame, sprocket, support rollers, road wheels, idler wheel, road wheel arms and idle wheel arm, while the track subsystem is represented as a closed kinematic chain consisting of track links and end connectors interconnected by revolute joints with bushing. Nonlinear contact force module describing the interaction between track link, and sprocket, idler wheel, road wheel, support roller, ground was used. The effects of road wheel arms and idler wheel arm due to tension adjuster are also considered.

  • PDF

Vehicle/track dynamic interaction considering developed railway substructure models

  • Mosayebi, Seyed-Ali;Zakeri, Jabbar-Ali;Esmaeili, Morteza
    • Structural Engineering and Mechanics
    • /
    • v.61 no.6
    • /
    • pp.775-784
    • /
    • 2017
  • This study is devoted to developing many new substructure models for ballasted railway track by using the pyramid model philosophy. As the effect of railway embankment has been less considered in the previous studies in the field of vehicle/track interaction, so the present study develops the pyramid models in the presence of railway embankment and implements them in vehicle/track interaction dynamic analyses. Considering a moving car body as multi bodies with 10 degrees of freedom and the ballasted track including rail, sleeper, ballast, subgrade and embankment, two categories of numerical analyses are performed by considering the new substructure systems including type A (initiation of stress overlap areas in adjacent sleepers from the ballast layer) or type B (initiation of stress overlap areas in adjacent sleepers from the subgrade layer). A comprehensive sensitivity analyses are performed on effective parameters such as ballast height, sleepers spacing and sleeper width. The results indicate that the stiffness of subgrade, embankment and foundation increased by increasing the ballast height. Also, by increasing the ballast height, rail and ballast vertical displacement decreased.

A Study of Wheel Tread Spalling Problem of $DF_{21}$ Locomotive

  • Weihua, Ma;Shihui, Luo
    • International Journal of Railway
    • /
    • v.1 no.2
    • /
    • pp.31-36
    • /
    • 2008
  • $DF_{21}$ diesel locomotive was designed to satisfy the requirement of Kunming Meter track and the 2Co self-guided radial bogie was used to suit the complex curve track. There are totally 12 locomotives was served on the track. The first two locomotives were devotion running on the track since April 2003, the wheel tread splling was occurred on the middle wheel set of the two locomotives after running nearly 150 thousands km on the track of the two locomotives at August 2004. The dynamic analysis was carried out to find the reason. The wheel set longitudinal vibration resonance phenomenon was existed on the locomotive dynamic performance, and this was caused by the too big longitudinal stiffness of the journal box bar on the middle wheel set. Wheel set longitudinal vibration resonance maybe an important reason of lead to wheel tread spalling. The corresponding mend methods were put forward from the point of view of wheel set longitudinal vibration resonance. All the wheel tread of the 12 locomotives on the middle wheel set were in good condition and not occurred the wheel tread spalling after the mend till December 2007 after 350 thousands km were finished. The mechanism of the wheel tread splling and corresponding mend method was discussed in detail in this paper.

  • PDF

Verified 20-car Model of High-speed Train for Dynamic Response Analysis of Railway Bridges (검증된 고속철도 차량의 20량편성 정밀모형에 의한 철도교량의 동적응답 분석)

  • 김상효;김병석;허진영;최성락
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2001.10a
    • /
    • pp.485-492
    • /
    • 2001
  • The dynamic analysis model is developed with the high-speed train (KTX) and a 2-span continuous prestressed concrete box girder bridge with a double track. The analytical results are compared with the dynamic field test results and found to be valid to yield quite accurate dynamic responses. The various trainset models with different number of cars are developed and compared with the results of the regular 20-car trainset model. It is concluded that the reduced trainset models, such as 7-car and 10-car models, cannot exactly produce the dynamic responses of bridges, especially when the train speed is high. Under the coincidence condition of two trains traveling with resonance velocity in the opposite directions, it is found that the impact factor under two-way coincidence is three times larger than that under one-way traffic. Consequently, for the bridge with a double-track it is necessary to check not only the dynamic responses of the bridge with one-way traffic but those with two-way coincidence.

  • PDF

A Study of Dynamic Behavior of Track and Train Interaction on Rail Open Gap (레일 개구부에서의 궤도-차량 상호작용에 대한 연구)

  • Kang, Yun Suk;Kang, Young Jong;Yang, Shin Chu;Cho, Sun Kyu;Han, Sang Yun
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.4
    • /
    • pp.345-355
    • /
    • 2007
  • During winter, the CWR (continuous welded rail) may be broken when a temperature drop below the neutral level changes the axial force, causing tensile fracture and creating a rail gap. The passage of a train on a rail with an open gap may lead to very costly derailments. In this paper, the use of a track-and-train-coupled model whose rail has an open gap is proposed for dynamic interaction analysis. Linear track and train systems were coupled in this study by a nonlinear Herzian contact spring, and the complete system matrices of the total track-train system were constructed. Moreover, the interaction phenomenon considering the presence of an open gap in the rail was toughly defined by assigning the irregularity functions between the two sides of the gap. Time history analysis, which has an iteration scheme such as the Newmark-$\beta$ method (based on the Modified Newton-Raphson methods), was conducted to solve the nonlinear equation. .Finally, numerical studies were conducted to assess the effect of the various parameters of the system when applied to various speeds, open-gap sizes, and support stiffnesses of the rail.

A Study on an improvement of Ballast Track turnout in Subway bridge(I) (지하철 고가부 자갈도상 분기기 궤도구조의 생력화 방안(I))

  • Sung, Deok-Yong;Choi, Jung-Youl;Kim, Jun-Hyung;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.325-339
    • /
    • 2007
  • This paper presents the analysis results to evaluate the application of separation sleeper boot of turnout in concrete track in subway. An analysis includes the dynamic load on turnout-bridge and the ballast improvement method of upbound and down line independent girder in servicing line. From the results, the aspect and the property of separation sleeper boot of turnout are evaluated. FE analysis explain the relationship between independent bridge and track behaviour of dynamic loads. The assessment of application based on FE analysis results in a good improvement method of servicing subway line is proposed.

  • PDF