• Title/Summary/Keyword: Track circuit

Search Result 195, Processing Time 0.021 seconds

A Field test of an Integrated Electronic Block System for verification of the suitability (통합형 전자폐색제어장치의 적합성 확인을 위한 현장시험)

  • Kim, Young-June;Baek, Jong-Hyen
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.12
    • /
    • pp.6427-6433
    • /
    • 2013
  • For trains to run safely and quickly, the train should always follow the preceding train at a proper spacing. For this purpose, a certain distance between the stations is set for each block section. For the safe operation of trains in one block section, only one train service for an automatic block system is needed. The existing block system is composed an ABS, which is a linked track circuit and line sideway system through the interlocking system. The interlocking system is being replaced with a domestic electronic interlocking system. On the other hand, the block system still uses the relay format of an analog system, and is independently installed of the line sideway systems. Therefore, the existing block system has many problems in terms of construction and maintenance. In addition, the existing domestic line is used for ABS and LEU , which is installed separately, despite the train being controlled by the information of the same signal at the same location. This is not efficient in terms of each product price and the maintenance costs. This paper introduces an integrated electronic block system and the field test results. The field test was carried out through a periodic inspection performed eight times from January to late August.

Development of CCTV Cooperation Tracking System for Real-Time Crime Monitoring (실시간 범죄 모니터링을 위한 CCTV 협업 추적시스템 개발 연구)

  • Choi, Woo-Chul;Na, Joon-Yeop
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.12
    • /
    • pp.546-554
    • /
    • 2019
  • Typically, closed-circuit television (CCTV) monitoring is mainly used for post-processes (i.e. to provide evidence after an incident has occurred), but by using a streaming video feed, machine-based learning, and advanced image recognition techniques, current technology can be extended to respond to crimes or reports of missing persons in real time. The multi-CCTV cooperation technique developed in this study is a program model that delivers similarity information about a suspect (or moving object) extracted via CCTV at one location and sent to a monitoring agent to track the selected suspect or object when he, she, or it moves out of range to another CCTV camera. To improve the operating efficiency of local government CCTV control centers, we describe here the partial automation of a CCTV control system that currently relies upon monitoring by human agents. We envisage an integrated crime prevention service, which incorporates the cooperative CCTV network suggested in this study and that can easily be experienced by citizens in ways such as determining a precise individual location in real time and providing a crime prevention service linked to smartphones and/or crime prevention/safety information.

A Study of the Apply Proximity Sensor for Improved Reliability Axle Detection (열차 차축검지 신뢰성 향상을 위한 근접센서 방식 Axle Counter 적용 연구)

  • Park, Jae-Young;Choi, Jin-Woo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.8
    • /
    • pp.5534-5540
    • /
    • 2015
  • This In the railway signaling system, applications of axle counter in addition to track circuit goes on increasing for detecting train position. Consequently, this paper compares sensor methods of axle counter with between geo-magnetism method and proximity sensor method. And it presents differences and results, to improve reliabilities of train detection and axle counting. Also, this article presents an applied result which is based on field experience, with regard to installation, considering attachment condition of sensor part for accurate axle counting. This study acquires expandability that is able to perform not only axle counting function but also various other functions (direction detection of train, speed detection of train, and so on). It was a result of a change of design in order to judge phase difference of sensors, to improve reliability of axle counting. Furthermore, it does not subordinate to characteristics (type, weight of train). And it is confirmed that the omission of axle counting was not occurred in 350km/h. This was the result of Lab test after the construction of transfer equipment of trial axle and Test Bed for axle counting. Both of them are self-productions. Through this, it prepares foundation which is able to apply not only to train detection but also to speed of passing trains, formation number of trains, detector locking condition - when the train passes the section of switch point, and level crossing devices. Furthermore, it would be judged to contribute safety train operation if proximity sensor method applies to the whole railway signaling system from now on.

Problem Solving Ability and Mental Capacity of High School Students under Complex Concept Situations (복합개념상황에서 고등학생들의 문제해결력과 정신용량)

  • Choi, Hyuk-Joon;Park, Ho-Jeen;Kwon, Jae-Sool
    • Journal of The Korean Association For Science Education
    • /
    • v.24 no.5
    • /
    • pp.937-945
    • /
    • 2004
  • In this study, we examined high school students' abilities for solving problems under single concept situations and complex concept situations and their mental capacities. Single concept situations are defined as the problems which can be solved with a scientific concept or principle and complex concept situations are the problems combined with more than 2 single concept situations. 152 11th-graders were participated in this study, who had taken natural science track. FIT 752 was used to measure their mental capacities. And an instrument, made up of six questions under three single concept situations and three complex concept situations, was used to assess students' problem solving abilities. As results, students' problem solving abilities were lower in complex concept situations than in single concept situations. There wasn't significant difference in mental capacities between of students who succeeded in solving problems and ones who did not under both single and complex concept situations. Although students solved the problems of single concept situations, some of them failed in solving the problems of complex concept situations composed of single concept situations which they succeeded in solving. They belonged to relatively low mental capacity group, of which students who failed in solving problems of complex situations had lower metal capacities than ones who succeeded in solving them. According to these results, it could be concluded that mental capacity is one of main variables which have influence on problem solving of complex concept situations composed of solvable single concept situations.

Feasibility Study of Improved Train Control System Using On-board Controller for Intelligent Control of Trackside Facilities (선로변 시설물의 지능적 제어를 위한 차상중심 열차제어시스템 시뮬레이션 기반 성능 평가)

  • Baek, Jong-Hyen;Jo, Hyun-Jeong;Chae, Eun-Kyung;Choi, Hyun-Young;Kim, Yong-Gyu
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.6
    • /
    • pp.528-533
    • /
    • 2013
  • To improve the efficiency and safety of railway systems, the train control system has considerably evolved from the ground-equipment-based control system (e.g. track circuit, interlocking system, etc.) into the on-board-equipment-based control system. In addition, this train control system enables the rolling stock to intelligently control the trackside facilities by introducing information and communication technologies (ICT). Accordingly, since the ICT-based train control system simplifies the railway system (i.e. the heavy ground-equipment can be removed), an efficient and cost-effective railway system can be realized. In this paper, we perform a feasibility test of the ICT-based train control system using a simulation. To this end, we implement a test-bed consisting of prototype machines of on-board/ground equipment and introduce an integrated operation scenario for the train control. The simulation results satisfy all the requirements of train operation according to the scenario and show the effectiveness of the proposed train control system.