• 제목/요약/키워드: Track circuit

검색결과 195건 처리시간 0.037초

AF궤도회로에서 전기적 절연구간의 길이에 대한 연구 (A Study on the Length of Electrical Separation Joint in AF Track Circuit)

  • 이명철;박재영
    • 전기학회논문지
    • /
    • 제62권1호
    • /
    • pp.70-75
    • /
    • 2013
  • The electrical separation joint as a filter circuit distributes the track circuit frequency. The electrical separation joint is classified into the interval where reinforcing bars are insulated and not insulated through the length of track circuit. In case of incorrectly setting up the length of electrical separation joint, the amplitude of current on the track circuit is not over standard current which is the standard of current on the track circuit and it effects on the close frequency on track circuit. Then, it makes an accident or makes a train not receive information for train control. In this paper, the electrical separation joint model is suggested and parameters are numerically calculated in the model. Moreover, the length of electrical separation joint is analyzed and is demonstrated by uisng Matlab and PSpice program.

철도궤도회로시스템에서 동일한 주파수를 사용하는 궤도회로 사이의 이격거리에 대한 연구 (A Study on the Distance Between the Track Circuits Using Identical Frequency in Railway Track Circuit System)

  • 김민석;이종우
    • 전기학회논문지
    • /
    • 제58권11호
    • /
    • pp.2168-2174
    • /
    • 2009
  • Electrical railway system consists of rolling stock, track, signal and streetcar line system. Track circuit system is a vital system due to checking the location of trains. Track circuits are divided by using frequency and isolated electrically. Currently, there is not a regulation for the distance between track circuits using identical frequency. In case of installing additional track circuits in large stations or marshalling yard, the problem which is that the signal is not exactly transmitted to the track circuit occurs due to the mutual interference. In other words, the track circuit properly is not operated on account of wrong induction current by the mutual inductance between track circuits. In this paper, we suggest the electrical model between track circuits and numerically calculate demanded parameters in electrical model. The distance between track circuits satisfying the mutual inductance which does not happen to the mutual interference phenomenon is presented about the distance of track circuit. It is proved by using Matlab and PSpice program as the amplitude of mutual induced current.

고전압 임펄스궤도회로의 동작특성 연구 (Study on the Operating Characteristics of High Voltage Impulse Track Circuit)

  • 이태훈;박기범;전용주;류영태
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.1279-1284
    • /
    • 2008
  • This paper presents the operating characteristic of high voltage impulse(HVI) track circuit owing to the ill-contact of impedance bond lead wire. The characteristic operations of the track include rail voltage and current. Measurements are carried out using oscilloscope with current probe and it analyzed the abnormal operation due to connector of protective wire. Finally, suitable track circuit is proposed for conventional line, and operating characteristic of HVI track circuit is affected by bypass circuit.

  • PDF

무절연 궤도회로의 ESJ설계에 대한 연구 (A Study on the Design of ESJ of Jointless Track Circuit)

  • 김정열;신석균;정용운;이기서;이길영
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2000년도 춘계학술대회 논문집
    • /
    • pp.195-201
    • /
    • 2000
  • In this paper propose the new method on desig ESJ(Electrical Separation Joint) of Jointless Track Circuit. ESJ has a capability to saparate track signal electrically but enable connected a track section physically. So It is more proper to high-speed line. Because that demand a critical traveling safety and convient taking a train. In spite of existing ESJ of Jointless Track Circuit, UM7l, S-bond, According to new pole-zero placement and desgining tuining-unit It is possible to prove a independence of track-section and track-signal in new ESJ design of this paper

  • PDF

콘크리트 슬래브궤도에서 보상 커패시터의 위치 및 전기용량에 대한 연구 (A Study on the location of Compensation Capacitor and Capacitance in the Concrete Slab Track)

  • 김민석;이상혁;고준석;이종우;조수익;유진영
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.879-891
    • /
    • 2009
  • Impedance of rails is increased by the magnetic coupling between rails and reinforcing bars in the concrete slab track. Currently, the current of track circuit has been compensated by installing the compensation capacitors on track circuit because of increasing the impedance of rails. In case of a rapid transit railway, the compensation capacitors are installed every 20[m] to compensate the current of track circuit in the concrete slab track. Because the interval of one block for a rapid transit railway is as long as 1500[m], the compensation capacitors are installed about the number of 70$\sim$75 on track circuit. However, in case the compensation capacitors are broken over the number of three, it is a problem that the amplitude of current is under standard amplitude of current which is 0.8[A]. In this paper, it was suggested installing a compensation capacitor by using resonance phenomenon on the concrete slab track. We represent the electrical model of track circuit and the four terminal network, calculate the parameters demanded for the electrical model in the concrete slab track. Also, we computed the position and capacitance of the compensation capacitor about 2040[Hz], 2400[Hz], 2760[Hz], 3120[Hz] which currently is the track circuit frequency in the Gyeongbu rapid transit railway and demonstrated the validity of it, using the Matlab and PSpice program.

  • PDF

무절연 가청주파수(AF) 궤도회로장치에 관한 고찰 (Technical Consideration of Non-Insulated Audio Frequency Track-Circuit Device)

  • 조봉관;김종기;황현철;류상환;강신주
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.1709-1715
    • /
    • 2011
  • A track-circuit device exploits two rails as a conductor of an electrical circuit. It detects the presence or absence of the trains with variation of received level when wheel sets of the train shunt rails together. So, it plays an important role in train operation. Non-insulated audio frequency(AF) track-circuit device can separate the rails into tracks by insulated joints without physically cutting the rails. And it transmits AF signals at track boundary, of which frequency is different between adjacent tracks. It has been employed at station-to-station section of domestic high speed rail, general rail, and subway. But It was not used at station yard of complicated general railway where lots of branches exist. In this paper, we consider current development status of non-insulated AF track-circuit device for the use of station yard.

  • PDF

하이브리드 궤도회로 시험방법 및 절차에 관한 연구 (Study on Test methods and Procedures of Hybrid Track Circuit)

  • 권부석;정호형;이기서;이창룡
    • 한국전자통신학회논문지
    • /
    • 제9권3호
    • /
    • pp.335-342
    • /
    • 2014
  • 본 논문에서는 하이브리드 궤도회로(Hybrid Track Circuit : HTC)의 실용화를 위한 시험방법과 그 절차에 대하여 연구하였다. 침목이나 도상 등 다양하고 특수한 선로 환경과 RFID 태그와 리더기, 안테나 구조를 고려한 시험방법을 제시함으로서 하이브리드 궤도회로의 서울메트로 구간 시범설치와 고속열차 구간 적용 연구에 활용이 가능하다. 또한 하이브리드 궤도회로 개발 프로젝트의 산출물 간 인터페이스와 설치방법 및 시험절차 등 안전하고 신뢰성 높은 결과를 도출하기 위한 방법을 제시하였다.

궤도회로기반 시스템에서 통신기반 시스템으로의 개량사업에 대한 장점 (The Advantage of renovation from Track Circuit Based Train Control to Communication Based Train Control)

  • 민준성;이진행;강리택;유영준
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.1327-1332
    • /
    • 2008
  • Nowadays, the technology development of communication and system engineering should impact on the Train Control System(TCS). The one of main developments in TCS is the Communication Based Train Control(CBTC), which does not depend on the track circuit. Currently, there are the project to modernize TCS as CBTC system from the track circuit system around the world. In Korea, there are the new CBTC system revenue projects such as Busan-Gimhae LRT, Sin-Bundang Line, and so on. There is also Government project called Maglev Line in Daejeon, which is applied CBTC system. Through the examples of world TCS renovation, it is expected to modernize the track circuit TCS system as CBTC system in Korea. Therefore, we would express the advantage of developing from the traditional TCS system to CBTC TCS system.

  • PDF

궤도구조 및 재료가 궤도회로에 미치는 영향 분석 (Effect Analysis for Track Circuit affected by Track Structure and Material)

  • 박대근;김정훈;김재학;강영종
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1724-1728
    • /
    • 2008
  • Track circuit is transmitted throughout the rails. In order to insure safe and reliable operation of track circuits, the track and the environment should respect mandatory electrical characteristics. In addition, for cab signalling through track Circuit as per TVM 430, these electrical characteristics should insure the transmission to the train. Track circuits have several operation and safety functions. They can detect the train position and broken rails. When track circuits are used as track to train transmission, they also have to be powered enough to be captured by the train sensors.

  • PDF

AF궤도회로에서 에너지 밀도가 정보신호 검출시간에 미치는 영향 (The Influence of Energy Density upon Detection Time of Information Signal in AF Track Circuit)

  • 김민석;황인광;이종우
    • 전기학회논문지
    • /
    • 제60권6호
    • /
    • pp.1146-1151
    • /
    • 2011
  • There are two methods for train control in information transmission by using track circuit system and installing wayside transmitter. Information signal is transmitted to the on-board antenna by using rails. Continuous information about train intervals, speed and route is received by on-board antenna in AF track circuit system. The information signal is included with carrier wave and received by magnetic coupling in the on-board antenna. Therefore, it is important to define standard current level in the AF track circuit system. When current flowed to rails is low, magnetic sensors are not operated by decreasing magnetic field intensity. Hence, SNR is decreased because electric field intensity is decreased. When the SNR is decreased, there is the serious influence of noise upon demodulation. So, the frequency of information signal is not extracted in frequency response. Thus, it is possible to happen to train accident and delay as the information signal is not analyzed in the on-board antenna. In this paper, standard energy density is calculated by using Parseval's theory in UM71c track circuit. Hence, detection time of information signal is presented.