• 제목/요약/키워드: Total Load Management System

검색결과 175건 처리시간 0.034초

금강수계 1단계 수질오염총량관리제의 목표수질 및 할당부하량 달성도 평가 (Evaluation of Water Quality Goal and Load Allocation Achievement Ratio in Guem River Total Maximum Daily Loads for the 1st Phase)

  • 박재홍;오승영;이재관
    • 한국물환경학회지
    • /
    • 제28권6호
    • /
    • pp.859-865
    • /
    • 2012
  • It is necessary to evaluate performances hitherto carried out in the management of Total Maximum Daily Loads (TMDLs) and to set up direction so that this system can be improved continuously in the future. This study was investigated load allocation achievement ratio, water quality goal achievement ratio and interrelation between water quality goal and load allocation for the first period (2004~2010). Load allocation achievement and BOD water quality goal achievement ratio were 50% and 73% in Guem River Basin, respectively. The main reason for excess of load allocation and shortfall of water quality goal were unfulfilled reduction plan and pollution sources increment. Therefore, it is necessary to develop enhanced pollution sources prediction method and make a list realizable reduction plan. 63% of the unit watershed was not interrelation between water quality goal and load allocation. The reason why water quality goal and load allocation had not correlation were water quality of upper unit watershed, increment of inflow quantity, effluent water quality of wastewater treatment plant affected the unit watershed, increment of inner productivity by algae, water quality deterioration during the specific period, river management flow, etc.

부하지속곡선(Load Duration Curve; LDC)을 이용한 한강수계 오염총량관리 목표수질 평가방법 적용 방안 (Application of the Load Duration Curve (LDC) to Evaluate the Achievement Rate of Target Water Quality in the Han-River Watersheds)

  • 김은경;류지철;김홍태;김용석;신동석
    • 한국물환경학회지
    • /
    • 제31권6호
    • /
    • pp.732-738
    • /
    • 2015
  • Water quality in four major river basin in Korea was managed with Total Maximum Daily Load (TMDL) System. The unit watershed in TMDL system has been evaluated with Target Water Quality (TWQ) assessment using average water quality, without considering its volume of water quantity. As results, although unit watershed are obtained its TWQ, its allocated loads were not satisfied and vice versa. To solve these problems, a number of TWQ assessments with using Load Duration Curve (LDC) have been studied at other watersheds. The purpose of this study was to evaluate achievement of TWQ with Flow Duration Curve (FDC) and Load Duration Curve(LDC) at 26 unit watersheds in Han river basin. The results showed that achievement rates in TWQ assessment with current method and with LDC were 50~56 % and 69~73%, respectively. Because of increasing about 20% of achievement rates with using LDC, the number of exceeded unit watershed at Han river Basin was decreased about 4~6 unit watersheds.

광양만 특별관리해역의 연안오염총량관리 도입에 관한 연구 (A Study on the Introduction of a Total Pollutant Load Management System in Gwangyang Bay, Korea)

  • 김도희;박종식;한기원;조현서
    • 해양환경안전학회지
    • /
    • 제28권6호
    • /
    • pp.899-905
    • /
    • 2022
  • 연안오염총량관리제는 지자체에 오염물질부하량을 할당하고, 오염부하 삭감뿐만 아니라 바람직한 지역발전에 있어서 아주 중요하다. 본 연구에서는 광양만특별관리해역의 총량관리 도입에 앞서 해역으로 유입하는 오염물질의 유입부하와 광양만 해역의 수질상태를 조사하였고, 현재 연안오염총량관리를 실시하고 있는 다른 해역의 장기적인 현황을 살펴보았으며, 수회에 걸쳐 광양만 특별관리해역 환경자문위원회의 의견을 수렴하였다. 그 결과, 광양만에도 총량관리의 필요성이 인정되었으나, 시행에 앞서 우선 COD, TN, TP, 중금속, PAHs의 지속적인 모니터링과 함께 총량관리 도입의 경제성과 효율성과 같은 타당성 검토가 이루어져야 할 것으로 판단되었다.

병렬 시스템에서의 최적 중복부품수와 최적 부하수준 (Optimal Redundant Units and Load in Parallel Systems)

  • 윤원영;김귀래
    • 한국경영과학회지
    • /
    • 제23권1호
    • /
    • pp.97-107
    • /
    • 1998
  • This paper is concerned with a parallel system that sustains a time-independent load and consists of n components with exponential lifetimes. It is assumed that the total load is shared by the working components and the failures of components increase higher failure rates in the surviving components according to the relationship between the load and the fialure rates. The power rule model among several load-failure rate relationships is considered. We consider the system efficiency meausre as the expected profit earned by the system per unit time. The high load causes high gain but it also occurs frequent system failures. The expected profit per unit time is used as criterion to evaluate the system efficiency. The goal of system engineer is to determine the optimal load and redundant units maximizing the expected profit per unit time. First, the system reliability function is obtained and the optimization problem of the load-sharing parallel system is considered. Given the redundant units, the existence of the optimal load can be proved analytically and given the load, the optimal redundant units can be solved also analytically. The optimal load and redundant units are obtained simultaneously by numerical computation. Some numerical examples are studied.

  • PDF

Cage Test를 통한 양돈폐수 발생원단위 설정 (Estimation of Unit Loads Generation for Swine Wastewater by Cage Test)

  • 김용석;박재홍;박지형;박배경;어성욱
    • 한국물환경학회지
    • /
    • 제31권3호
    • /
    • pp.235-240
    • /
    • 2015
  • To evaluate the unit load generation and discharge, pig cage test was conducted. Feed intake, drink amount, and urine generation increased growth stage (heavy weight) of the pig more great. However, the sum of the urine and manure did not show a significant difference in the growth stages of pigs. Because of the limit of the experiment, e.g., research period, high pigpen temperature, breed-related stress and etc., it could not be derived the results of the four seasons. Therefore, in order to generalize the results, the feed intakes were calibrated using a NRC (National Research and nutritional requirements of pigs from the Commission) standards. The finalized unit load generation and generation amounts of manure and urine were estimated at BOD 104.1 g/head/d, T-N 21.2 g/head/d, T-P 4.9 g/head/d, manure 0.96 L/d, urine 1.66 L/d with consideration of revised feed intake. Compare to the former research results of MOE (Ministry of Environment, 1999) and NIAS (National Institute of Animal Science, 2008), the generation amounts of manure and urine were similar to the NIAS's values. In case of unit load generation, BOD and T-N were almost similar in all of them. However, the T-P unit load generation of MOE was more difference, e.g., 2.5 times high, compare to this study.

Harmonics Reduction in Load control and Management system

  • Thueksathit, W.;Tipsuwanporn, V.;Hemawanit, P.;Gulpanich, S.;Srisuwan, K.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2003년도 ICCAS
    • /
    • pp.2283-2286
    • /
    • 2003
  • This paper presents conservation of electrical energy in building with harmonics analysis and compensation which occur in electrical system. We use load controlling and management system in order to adjust load factor of system.The maximum demand limiting and controlling are used ,then the system can acquire the prediction and compare it to the maximum demand set point.The electrical signal analysis based on FFT technique. The harmonics are compensated by using harmonic filters.This system consists computer which works as controller, processor , analysis and database unit together with digital power meter in form of multidrop network through serial communication via RS-485.The load control system uses PLC to control load via serial communication RS-485. The A/D converter is used for sampling the electrical signals via parallel port of computer.The harmonic filters are controlled by a computer.The data of measurement such as voltage, current, power, power factor, total harmonic distortion, energy, etc., can be saved as database and analysis. The load factor is adjusted by limiting and controlling maximum demand. The load factor adjustment can reduce the cost of electric consumption and energy generation together with harmonics compensation in order to increase high efficiency of electrical system.

  • PDF

가축분뇨실태조사를 위한 양분수지 산정 모델 개발 (Development of a Nutrient Budget Model for Livestock Excreta Survey)

  • 김덕우;유홍덕;임도영;정유진;김용석
    • 한국물환경학회지
    • /
    • 제33권6호
    • /
    • pp.769-779
    • /
    • 2017
  • Nutrient (i.e., nitrogen and phosphorus) budgets are required under a 'Livestock Excreta Survey'. A nutrient budget is one of the agri-environmental indicators that calculates the difference between the inputs and outputs of the amount of nutrients within a certain boundary and for a certain time period (e.g., 1 year). In this study, a nutrients budget model was developed to effectively determine the surplus of nutrients within a region in Korea. The C# program language was used in order to facilitate the deployment of a graphical user interface (GUI) and to enhance compatibility. Also, the model was developed on Windows OS, which is the commonly used operating system in Korea. The model was based on the OECD/Eurostat nutrient budget method, and it was modified to consider manure composting procedures as well. There are key features of the nutrient budget model, including directly use of the original data sets from various input and output sources, and a collectively exchange of the address in different formats. The model can quickly show the results of various spatial and temporal resolutions with the same data, as well as perform a sensitivity analysis with coefficients and easily compareresults using tables and graphs. Further, it would be necessary to study the extension of the scope of utilization, such as the application of various nutrient budget methods. It would also be helpful to investigate both pre and postprocessing information such as linking input data through online systems.

수질오염총량관리 관거월류부하 변화에 따른 배출부하량 산정방법 (Estimation of Discharge Load due to Combined Sewer Overflows in the Management of Total Maximum Daily Loads)

  • 박준대;오승영;최옥연
    • 한국물환경학회지
    • /
    • 제27권3호
    • /
    • pp.293-299
    • /
    • 2011
  • The quantity of a discharge load can change with changes in rainfall in the area with a combined sewer system (CSS). To evaluate the implementation appropriately in the management of total maximum daily loads (TMDLs), the effects of rainfall changes should be considered in the estimation of the discharge load. The rainfall condition for the estimation of the discharge load in a certain year should be standardized to the same rainfall condition as that of the reference year. However, the calculation process is very complicated with its potential limitations. This study investigated and developed relatively simple methods for estimating the discharge load. Load conversion method (LCM) is designed to convert the discharge load under the current rainfall condition into that of the reference rainfall conditions. Simple rainfall data method (SRDM) is to simplify the estimation process of the discharge load by the simple conversion of rainfall data. These methods were applied to calculate the discharge load and examine the estimation results. From the results of this study the application of these methods may be useful for estimating the discharge load in the TMDL process.

우리나라 오염총량관리제도의 적용 및 개선: 2. 안전율 산정 및 삭감부하량 할당 (Improvement and Application of Total Maximum Daily Load Management System of Korea: 2. Determination of Margin of Safety and Allocation of Pollutant Loads)

  • 김경태;정은성;김상욱;이길성
    • 한국물환경학회지
    • /
    • 제26권1호
    • /
    • pp.168-176
    • /
    • 2010
  • This study proposes the improvement of the present Total Maximum Daily Load (TMDL) management system of MOE (Ministry of Environment). The margin of safety (MOS) is calculated by a method using standard error and a method using variability and uncertainty. The allocation of pollutant loads are calculated using three methods, equal load reduction method, equal percent removal method and method using equity standards. This study applied the improved TMDL management system to the Anyangcheon watershed. Since MOS varies from 12% to 44% due to the high variability of measured and simulated data, it must not be ignored in the TMDL. The method using equity standards is the most proper in this application since the others produced unrealistic allocations. Area, runoff, water use quantity, population and budget are considered for equity standards. This study shows that this allocation method can be also applicable for the administrative units as well as the sub-watersheds. Finally, Hydrologic Simulation Program-FORTRAN (HSPF) with the allocated pollutant load was used to confirm whether it satisfy the water quality standard or not. This study will be helpful to improve the MOS and allocation system TMDL in the future.

비상시 선로혼잡 해결을 위한 직접부하제어 (Direct Load Control Scheme for Congestion Problems in Power System Emergency)

  • 신호성;김병수;송경빈;김재철;이학주;권성철
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2005년도 춘계학술대회논문집
    • /
    • pp.307-310
    • /
    • 2005
  • Most of the electric power in the power system of South Korea is flowing from the south area to the north area, Seoul, in the capital of South Korea. Almost of the needs of the electric power in the capital area are about 43% of the total loads and generation plants are mainly located in the south area of South Korea. As mentioned the earlier characteristic, transmission congestion is one of the important research issues. Because of the limits of the power flows from the south to the north which are anticipated to be increased more and more in the future, these congestion situations may cause a serious voltage stability problem in emergency of the power system. Accordingly, we are interested in an interruptible load control program so as to solve this problem in emergency. This problem can be solved by an interruptible load management in emergency, however, the systematic and effective mechanism has not been presented yet. In this paper, the algorithm of interruptible load management plan using the line sensitivity to the loads for the transmission congestion management in emergency is presented. The proposed method is applied to 6-Bus sample system and their results are presented.

  • PDF