• Title/Summary/Keyword: Total Load Management System

Search Result 175, Processing Time 0.026 seconds

Analysis of Monitoring Characteristics of Small Stream for TMDL (오염총량관리를 위한 소하천 모니터링 자료의 특성 분석)

  • Ha, Don-Woo;Park, Seung-Ho;Joo, Sungmin;Lee, Gi-Soon;Baek, Jong-Hun;Jung, Kang-Young;Lee, Youngjea;Kim, Kyunghyun;Kim, Young-Suk
    • Journal of the Korean Society for Environmental Technology
    • /
    • v.19 no.6
    • /
    • pp.503-513
    • /
    • 2018
  • In order to continuous watershed management and improve water quality at Yeong-san river system, we analyzed and evaluated data on the monitoring of small stream in city and county boundaries within the watershed. In-period monitoring is estimated to be more frequent in the second quarter than the first quarter, so it should be considered when evaluating the target water quality by setting the target water quality. A small stream in the Yeong-san river system has higher concentration in the downstream area than the upstream area. As a result of calculating the load of the measuring point, Y.b B3(Pungyeongjeongcheon) and Y.b E1(Sampocheon) were high. The result of correlation analysis by monitoring point in order to evaluate the correlation between BOD and T-P items, BOD was highly correlated with COD and TOC, and was affected by emission of pollutants related to organic matter. T-P was highly correlated with SS and COD, and was affected by rainfall. This study will provide basic data and direction for designing efficient and scientific method for water quality management by analyzing accumulated water quality data by conducting long-term monitoring.

Study on improvement of USLE P factor considering topography and cultivation method (지형 및 경작 방법을 반영한 범용토양유실량 산정공식 보전관리 인자 개선 연구)

  • Sung, Yunsoo;Lee, Gwanjae;Lee, Gwanjae;Han, Jeongho;Kim, Jonggun;Lim, Kyoung Jae;Kim, Ki Sung
    • Journal of Wetlands Research
    • /
    • v.21 no.2
    • /
    • pp.163-172
    • /
    • 2019
  • The USLE P factor is a factor that varies depending on how croplands are managed and cultivated. Previous studies tend to overestimate the amount of soil loss because the factor was estimated from the slope of the watershed rather than the estimate of each cultivated land. In addition, the accuracy of estimating the soil loss is decreasing due to the fact that the factor is calculated without considering various conditions of cultivated land defined by Wishmeier and Smith. In order to overcome these problems, the Ministry of Environment (MOE) has proposed to establish the topsoil notification and calculate the P factor according to the cultivation methods (e.g., tillage system, support practice). However, it is required to apply the conditions proposed in the United States to domestic circumstances as it is causing uncertainties. Thus, this study selected the watersheds where soil loss was serious (Haean, Jaun, Banbyeoncheon), measured the actual slopes and slope lengths, and examined the crop, tillage systems, and support practice for each cultivated land. The P factors were recalculated considering the actual conditions of cultivated land and compared to the factors proposed by the previous studies (MOE). As the result of the study, the P factors calculated based on the previous studies were 0.8 ~ 1.0 in three watersheds. On the other hand, it is confirmed that there is a significant difference between the factors notified by MOE and estimated by reflecting the topography and cultivation methods in this study. Therefore, it is considered that the research for developing the cultivation conditions to calculate the P factor suitable for the domestic environment should be continuously carried out.

Long-Term Variations of Water Quality in Jinhae Bay (진해만의 장기 수질변동 특성)

  • Kwon, Jung-No;Lee, Jangho;Kim, Youngsug;Lim, Jae-Hyun;Choi, Tae-Jun;Ye, Mi-Ju;Jun, Ji-Won;Kim, Seulmin
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.17 no.4
    • /
    • pp.324-332
    • /
    • 2014
  • In order to reveal the long-term variations of water quality in Jinhae Bay, water qualities had been monitored at 9 survey stations of Jinhae Bay during 2000~2012. The surface and bottom waters concentrations of chemical oxygen demand (COD), dissolved inorganic nitrogen (DIN), dissolved inorganic phosphorus (DIP), and chlorophyll-a (Chl.-a) were higher at the survey stations of Masan Bay than the stations of other Bays. Especially, station 1 which is located at the inner area of Masan Bay had the highest values in the concentrations of COD, DIN, and Chl.-a because there were terrestrial pollutant sources near the station 1 and sea current had not well circulated in the inner area of Masan Bay. In factor analysis, the station 1 also had the highest factor values related to factors which increase organic matters and nutrients in surface and bottom waters of Masan Bay. However, the stations (st.5, st.6, st.7, st.8, and st.9) of other Bays had lower values of the factors. In time series analysis, the COD concentrations of the bottom waters at 8 stations except for station 1 distinctly decreased. However, the COD concentrations of the surface waters showed no distinct decrease trends at all stations. In the concentrations of nutrients (DIN and DIP) of both surface and bottom waters, there were tremendous decrease trends at all stations. Therefore, these distinct decrease trends of the COD in bottom waters and the nutrients in surface and bottom waters of Jinhae Bay could have been associated with water improvement actions such as TPLMS (total pollution load management system).

How effective has the Wairau River erodible embankment been in removing sediment from the Lower Wairau River?

  • Kyle, Christensen
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.237-237
    • /
    • 2015
  • The district of Marlborough has had more than its share of river management projects over the past 150 years, each one uniquely affecting the geomorphology and flood hazard of the Wairau Plains. A major early project was to block the Opawa distributary channel at Conders Bend. The Opawa distributary channel took a third and more of Wairau River floodwaters and was a major increasing threat to Blenheim. The blocking of the Opawa required the Wairau and Lower Wairau rivers to carry greater flood flows more often. Consequently the Lower Wairau River was breaking out of its stopbanks approximately every seven years. The idea of diverting flood waters at Tuamarina by providing a direct diversion to the sea through the beach ridges was conceptualised back around the 1920s however, limits on resources and machinery meant the mission of excavating this diversion didn't become feasible until the 1960s. In 1964 a 10 m wide pilot channel was cut from the sea to Tuamarina with an initial capacity of $700m^3/s$. It was expected that floods would eventually scour this 'Wairau Diversion' to its design channel width of 150 m. This did take many more years than initially thought but after approximately 50 years with a little mechanical assistance the Wairau Diversion reached an adequate capacity. Using the power of the river to erode the channel out to its design width and depth was a brilliant idea that saved many thousands of dollars in construction costs and it is somewhat ironic that it is that very same concept that is now being used to deal with the aggradation problem that the Wairau Diversion has caused. The introduction of the Wairau Diversion did provide some flood relief to the lower reaches of the river but unfortunately as the Diversion channel was eroding and enlarging the Lower Wairau River was aggrading and reducing in capacity due to its inability to pass its sediment load with reduced flood flows. It is estimated that approximately $2,000,000m^3$ of sediment was deposited on the bed of the Lower Wairau River in the time between the Diversion's introduction in 1964 and 2010, raising the Lower Wairau's bed upwards of 1.5m in some locations. A numerical morphological model (MIKE-11 ST) was used to assess a number of options which led to the decision and resource consent to construct an erodible (fuse plug) bank at the head of the Wairau Diversion to divert more frequent scouring-flows ($+400m^3/s$)down the Lower Wairau River. Full control gates were ruled out on the grounds of expense. The initial construction of the erodible bank followed in late 2009 with the bank's level at the fuse location set to overtop and begin washing out at a combined Wairau flow of $1,400m^3/s$ which avoids berm flooding in the Lower Wairau. In the three years since the erodible bank was first constructed the Wairau River has sustained 14 events with recorded flows at Tuamarina above $1,000m^3/s$ and three of events in excess of $2,500m^3/s$. These freshes and floods have resulted in washout and rebuild of the erodible bank eight times with a combined rebuild expenditure of $80,000. Marlborough District Council's Rivers & Drainage Department maintains a regular monitoring program for the bed of the Lower Wairau River, which consists of recurrently surveying a series of standard cross sections and estimating the mean bed level (MBL) at each section as well as an overall MBL change over time. A survey was carried out just prior to the installation of the erodible bank and another survey was carried out earlier this year. The results from this latest survey show for the first time since construction of the Wairau Diversion the Lower Wairau River is enlarging. It is estimated that the entire bed of the Lower Wairau has eroded down by an overall average of 60 mm since the introduction of the erodible bank which equates to a total volume of $260,000m^3$. At a cost of $$0.30/m^3$ this represents excellent value compared to mechanical dredging which would likely be in excess of $$10/m^3$. This confirms that the idea of using the river to enlarge the channel is again working for the Wairau River system and that in time nature's "excavator" will provide a channel capacity that will continue to meet design requirements.

  • PDF

Measuring the Public Service Quality Using Process Mining: Focusing on N City's Building Licensing Complaint Service (프로세스 마이닝을 이용한 공공서비스의 품질 측정: N시의 건축 인허가 민원 서비스를 중심으로)

  • Lee, Jung Seung
    • Journal of Intelligence and Information Systems
    • /
    • v.25 no.4
    • /
    • pp.35-52
    • /
    • 2019
  • As public services are provided in various forms, including e-government, the level of public demand for public service quality is increasing. Although continuous measurement and improvement of the quality of public services is needed to improve the quality of public services, traditional surveys are costly and time-consuming and have limitations. Therefore, there is a need for an analytical technique that can measure the quality of public services quickly and accurately at any time based on the data generated from public services. In this study, we analyzed the quality of public services based on data using process mining techniques for civil licensing services in N city. It is because the N city's building license complaint service can secure data necessary for analysis and can be spread to other institutions through public service quality management. This study conducted process mining on a total of 3678 building license complaint services in N city for two years from January 2014, and identified process maps and departments with high frequency and long processing time. According to the analysis results, there was a case where a department was crowded or relatively few at a certain point in time. In addition, there was a reasonable doubt that the increase in the number of complaints would increase the time required to complete the complaints. According to the analysis results, the time required to complete the complaint was varied from the same day to a year and 146 days. The cumulative frequency of the top four departments of the Sewage Treatment Division, the Waterworks Division, the Urban Design Division, and the Green Growth Division exceeded 50% and the cumulative frequency of the top nine departments exceeded 70%. Higher departments were limited and there was a great deal of unbalanced load among departments. Most complaint services have a variety of different patterns of processes. Research shows that the number of 'complementary' decisions has the greatest impact on the length of a complaint. This is interpreted as a lengthy period until the completion of the entire complaint is required because the 'complement' decision requires a physical period in which the complainant supplements and submits the documents again. In order to solve these problems, it is possible to drastically reduce the overall processing time of the complaints by preparing thoroughly before the filing of the complaints or in the preparation of the complaints, or the 'complementary' decision of other complaints. By clarifying and disclosing the cause and solution of one of the important data in the system, it helps the complainant to prepare in advance and convinces that the documents prepared by the public information will be passed. The transparency of complaints can be sufficiently predictable. Documents prepared by pre-disclosed information are likely to be processed without problems, which not only shortens the processing period but also improves work efficiency by eliminating the need for renegotiation or multiple tasks from the point of view of the processor. The results of this study can be used to find departments with high burdens of civil complaints at certain points of time and to flexibly manage the workforce allocation between departments. In addition, as a result of analyzing the pattern of the departments participating in the consultation by the characteristics of the complaints, it is possible to use it for automation or recommendation when requesting the consultation department. In addition, by using various data generated during the complaint process and using machine learning techniques, the pattern of the complaint process can be found. It can be used for automation / intelligence of civil complaint processing by making this algorithm and applying it to the system. This study is expected to be used to suggest future public service quality improvement through process mining analysis on civil service.