• Title/Summary/Keyword: Total Life Cycle System Management

Search Result 105, Processing Time 0.025 seconds

A Study on the Development plan of Configuration Control for Military Product (군수품 형상통제업무 발전방안에 관한 연구)

  • Jung, Hyun-Woo;Shim, Bo-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.6
    • /
    • pp.70-77
    • /
    • 2020
  • Configuration management is an important project management method. Configuration management is increasing daily and improving defense power as a management tool for technical data of power support systems. Configuration management work must be carried out properly from the beginning of development to acquire an excellent weapon system. In procurement, configuration management is a vital factor that can determine the cost of maintaining operations during the transfer of military supplies and carry out systematic management among operational support. Countries are making changes to policies and systems to manage R&D, standards, and patents in conjunction with each other from the beginning of research and execution, and it is important to establish the concept of managing and controlling the configuration as an efficient means of managing military resources. To identify the activity details during the entire life cycle from the beginning of acquisition to the end of disposal by linking munitions configuration control with the total life cycle, and redefine the appropriate work system, this study investigated and analyzed the U.S. configuration control procedures to identify the activity details and present areas to develop.

Product Liability Prevention Policies through the Improvement of Product Safety and Reliability (제품안전 및 신뢰성 향상을 통한 제조물책임 예방대책)

  • Kim, Jin-Kyu
    • IE interfaces
    • /
    • v.15 no.3
    • /
    • pp.270-278
    • /
    • 2002
  • Product Liability(PL) is a legal policy to deal with global competition by improving domestic industrial competitive power and to reduce the cost of defect products. The purpose of this paper is to address the state of the art solutions to dispute on PL, in reality of a frequent occurrence of global product exchange focussing on product safety that is one of the most important functions of PL and to improve solution of the product safety and reliability responsive to PL. To minimize PL exposure, manufacturers should reflect comprehensive product safety and reliability concepts in establishing PL prevention policies. Total PL prevention policies are composed of total quality management and product safety management system in respect of safety design, risk, and reliability. These PL prevention activities should be performed consistently during the total product life cycle, especially product research and development periods.

Development of Process Analytical Technology (PAT) for Total Quality Innovation on Pharmaceutical Processes (의약품 제조공정에서의 전사적 품질혁신을 위한 공정분석기술 개발)

  • Shin, Sang-Mun;Park, Kyung-Jin;Choi, Yong-Sun;Lee, Sang-Kil;Choi, Guang-Jin;Kwon, Byung-Soo;Cho, Byung-Rae
    • Journal of Pharmaceutical Investigation
    • /
    • v.37 no.6
    • /
    • pp.329-338
    • /
    • 2007
  • The quality assurance issue of drug products is more important than the general product because it is highly related to the human health and life. In this reason, the regulatory guide lines have continuously been intensified all around the world. In order to achieve effective quality assurance and real-time product release (RTPR) of drug products, process analytical technology (PAT), which can analyze and control a manufacturing process, has been proposed from the United States. With the PAT process, we can obtain significant process features of materials, quality characteristics and product capabilities from a raw material to the final product in the real-time procedure. PAT can also be utilized to process validation using information system that can analyze the risk of drug products through out an entire product life-cycle. In this paper, we first offered a new concept for the off-line process design methods to prepare the improved quality assurance restrictions and a real-time control method by establishing an information system. We also introduced an automatic inspection system by obtaining surrogate variables based on drug product formulations. Finally, we proposed an advanced PAT concept using validation and feedback principles through out the entire life-cycle of drug product manufacturing processes.

Research about the Education Program of the Healthy Family-Support Center(HFSC) (건강가정지원센터의 교육프로그램 운영 실태에 관한 조사)

  • Jeong, Jee-Young;Jeong, Young-Keum;Cho, Seung-Eun
    • Journal of Family Resource Management and Policy Review
    • /
    • v.11 no.4
    • /
    • pp.93-114
    • /
    • 2007
  • The purpose of this study was to analyze the educational program that is offered on the information menu in the homepage (Familynet) of the Healthy Family-Support Center (HFSC) and suggest developmental directions. For this purpose, first, it deduced that the managerial principles of the education program, from related theories, are included in the family-system, family-structure, family-structure analysis, family life-cycle and ecological system theories. Second, it analyzed the educational programs of 44 local centers that are connected to the homepage (familynet.or.kr) of HFSC. Finally, it suggested developmental directions for managerial improvements of educational programs. As a result, the most popular part in the educational program was parent education, especially the visiting-father education program. The number of couple-related education programs were fewer than those for parent education, because it is difficult for couples to be present at the same time. Family and Self-Cognition programs cover insufficient contents in the parent-education program. Though total program in familylife education is quite large, the number of programs in each separate part is far too small for such a wide subject. So, each part in the program should be made more sufficient. Finally, it suggested the development of an evaluation system and a coaching process as special services for families that are in different development stages and have different family experiences, resources, needs and goals.

  • PDF

DEVELOPMENT OF A WEB-BASED COST AND DURATION MANAGEMENT SYSTEM FOR MEGA-PROJECTS

  • Chang-Taek Hyun;Run-Zhi Jin;Myoung-Jin Son;Seung-Yoon Shin
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.510-515
    • /
    • 2011
  • Urban renewal projects, in the form of mega-projects, are being actively implemented both nationally and internationally to revitalize inactive cities. These programs, however, are difficult to manage efficiently due to their need for a large budget over a long period of time and due to conflicts with stockholders. Moreover, existing cost and duration management systems are structured with emphasis on the design and construction stage of unit projects, thus limiting their application to long-term mega-projects that are integrated with various facilities. To solve these problems, this study developed a web-based system that can collectively manage the cost and duration of mega-projects at a program level. The unit modules included in the system--CBS organization, construction cost and duration prediction, and total cost and duration prediction--can support decision-making at the early stage of the program. Furthermore, the modules, which include contract management, execution management, change management, and program progress management, support the program operations for its successful accomplishment. The web-based cost and duration management system developed in this study is expected to be used as a valuable tool that supports the successful accomplishment of mega-projects through their efficient management throughout their life cycle.

  • PDF

A Study on Optimal Release Time for Software Systems based on Generalized Gamma Distribution (일반화 감마분포에 근거한 소프트웨어 최적방출시기에 관한 비교 연구)

  • Kim, Jae-Wook;Kim, Hee-Cheul
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.6 no.1
    • /
    • pp.55-67
    • /
    • 2010
  • Decision problem called an optimal release policies, after testing a software system in development phase and transfer it to the user, is studied. The applied model of release time exploited infinite non-homogeneous Poisson process. This infinite non-homogeneous Poisson process is a model which reflects the possibility of introducing new faults when correcting or modifying the software. The failure life-cycle distribution used generalized gamma type distribution which has the efficient various property because of various shape and scale parameter. Thus, software release policies which minimize a total average software cost of development and maintenance under the constraint of satisfying a software reliability requirement becomes an optimal release policies. In a numerical example, after trend test applied and estimated the parameters using maximum likelihood estimation of inter-failure time data, estimated software optimal release time.

A Study on the Improvement Plans of the Humanities and Social Sciences Research Data Archives in Korea (국내 인문사회 연구데이터 아카이브의 개선방안에 관한 연구)

  • Shin, Young-Ran;Chung, Yeon-Kyoung
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.12 no.3
    • /
    • pp.93-115
    • /
    • 2012
  • This study aims to propose improvement plans of the Humanities and Social Sciences research data archives in Korea. For this purpose, literature reviews were conducted to prove the importance of the Humanities and Social Sciences research data and establish a theoretical basis for the concept and requirements of data archives. In addition, analysis of the Korean Research Memory (KRM), case surveys for a total of 9 domestic and international archives, and in-depth interviews with a total of 10 researchers in the field of the Humanities and Social Sciences were conducted as well. As for the improvement of the Humanities and Social Sciences research data archives in Korea, establishing a cooperative system between the National Research Foundation of Korea (NRF) and the field of the Humanities and Social Sciences was proposed first for data archives of each project. Secondly, a conceptual model of research data archives was designed in such a way that the archives would perform according to a life cycle of research data in the cooperative system, all based on data curation.

The Life Cycle Cost Optimization Methodology as a Tool for Designing Apartment Units (공동주택 단위세대의 생애 비용 최적화 방법론 연구)

  • Park Tae Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.80-86
    • /
    • 2000
  • The future costs of energy and the cost of the repair of apartment buildings are expected to rise continuously in proportion to the initial costs. Therefore it has become important for these increasing costs to be incorporated and reflected in the design of the building. Systems such as structure and services for the buildings remain constant, but a number of the walls and windows can vary and thus have a major influence on the total construction and running costs of a building. The critical factor in the apartment unit design for the optimization of life cycle cost (LCC) is the ratio of the x and y axis of the walls in the unit plan. This paper demonstrates how to achieve the optimal size and thus optimize the LCC of the building.

  • PDF

Conceptual Study for Asset Management Framework Construction of Railway Infra Structure System (철도시설물에 대한 자산관리체계수립을 위한 개념 연구)

  • Lee, Jee-Ha;Park, Mi-Yun;Lee, Jong-Kun;Park, Man-Ho;Jung, Dae-Ho
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2473-2478
    • /
    • 2011
  • The asset management of railway facilities is a total framework for finally supporting a safe and comfortable train service, which includes functions of supporting evaluation of condition and performance of infrastructures, making the decision method of repair or rehabilitation of deteriorated facilities, and lengthening the life cycle of structure through the decision of adequate cost and time of repair or reinforcement. In the range of the asset management, organization, human, the target, and information & data of company are included. Therefore, in this paper, appling the method of asset management analysis to the railway structures, the process of the risk assesment using BRE(Business Risk Exposure) and the basis of consisting optimized renewal decision-making are expressed.

  • PDF

Basic Study on Electrified Railway Design Management using VE(Value Engineering) Techniques (VE 기법을 이용한 철도 설계관리에 관한 기초연구)

  • Cho, Rae-Hyuck;Hwang, Sung-Gwang
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.849-855
    • /
    • 2005
  • Railway fields are complicatedly connected with engineering such as physics, civil engineering, architecture engineering, electrical engineering (Telecommunication, signal, catenary, system), machine engineering and performance phase of project in domestic railway can be divided with four steps : planning, design, supervision, construction. Value Engineering is needed to reduce the cost of long period construction duration and periodically maintenance. Currently, railway design is difficult to act optimum design due to limited time, short of manpower, downsized of design company. therefore, VE concept in Design must require In order to solve this problem. it is called Design Management. This paper presents both item of design management and total design management tool of practical aspects, and describes LCC (Life Cycle Cost) analyze process and accomplishment process for applying VE concept

  • PDF