• Title/Summary/Keyword: Total Life Cycle System Management

Search Result 105, Processing Time 0.023 seconds

A Case Study on Economic Analysis of a Solar Water Heating System and a Ground Source Heat Pump System Applied to a Military Building (군 복지시설의 지열시스템과 태양열시스템 경제성 평가 사례 연구)

  • Lee, Jong-Chan;Park, Young-Ho;Lee, Ghang;Lee, Sang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.111-118
    • /
    • 2009
  • This study is to analyze the performance of SWH(Solar Water Heating) and GSHP(Ground Source Heat Pump) systems by evaluating their energy efficiency and LCC(Life Cycle Cost) as being applied to the OO hall as a selected building in the Army. The OO hall, used as bathrooms, dining rooms, accommodations and offices, has reinforced concrete structure system with three floors above the ground and one underground, and its total floor area is approximately 2,917$m^2$. Two energy simulations are conducted to predict the yearly cooling and heating energy of the selected building: One is for analysis of an air-conditioning energy consumption using the e-Quest program, and another is for two new-renewable energy facilities as a water heating source using the RETScreen. The installed capacity of two new-renewable energy facilities is determined according to the 5% level of total standard construction cost. As a briefly result, SWH system is more energy-effective than GSHP system. Considering the break-even point, it is expected that SWH can take only 3 years 11 months to pay for itself in savings while the investment of GSHP can be recovered in more than 16 years 6 months.

Mid-term Requirement of 'Elements of Depot Maintenance' draft (창정비요소 개발 과정정립을 통한 창정비요소개발 발전을 위한 제언)

  • Ahn, Jung-Jun;Kim, Jong-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.3
    • /
    • pp.638-647
    • /
    • 2018
  • We have to prepare for the existing threats from North Korea and potential threats in the future. It is important to utilize our resources as effectively as possible to build military power that brings victory in a war. Based on a sustainable required operational capability, weapons systems at the acquisition stage need to maintain a combat-readiness posture and ensure operational sustainability. To achieve this, establishment of procedures that develop elements of depot maintenance at the beginning, which enables economical and effective depot maintenance during that stage, is essential. First, the requirement paper needs to develop the concept of the depot maintenance requirement through the pre-study outlined by this paper. Second, at the system development stage, a Development Plan of Depot Maintenance draft should be proposed. This is the initial paper that can develop the elements of depot maintenance, and it should be verified by a field test. Third, each force's logistics command should write a Depot Maintenance Direction draft and a Mid-term Requirement of Elements of Depot Maintenance draft with the proven Development Plan of Depot Maintenance draft. Also, the verified paper needs to be realized and renewed by the time the Requirement of Elements of Depot Maintenance draft is completed. In conclusion, the procedures explained above will contribute to build an economical and effective military power in a reality faced with a resource shortage and threats from the enemy.

Assessment of Environmental Impacts and $CO_2$ Emissions from Soil Remediation Technologies using Life Cycle Assessment - Case Studies on SVE and Biopile Systems - (전과정평가(LCA)에 의한 토양오염 정화공정의 환경영향분석 및 $CO_2$ 배출량 산정 - SVE 및 Biopile 시스템 중심으로 -)

  • Jeong, Seung-Woo;Suh, Sang-Won
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.33 no.4
    • /
    • pp.267-274
    • /
    • 2011
  • The environmental impacts of 95% remediation of a total petroleum hydrocarbon-contaminated soil were evaluated using life cycle assessment (LCA). LCA of two remediation systems, soil vapor extraction (SVE) and biopile, were conducted by using imput materials and energy listed in a remedial system standardization report. Life cycle impact assessment (LCIA) results showed that the environmental impacts of SVE were all higher than those of biopile. Prominent four environmental impacts, human toxicity via soil, aquatic ecotoxicity, human toxicity via surface water and human toxicity via air, were apparently found from the LCIA results of the both remedial systems. Human toxicity via soil was the prominent impact of SVE, while aquatic ecotoxicity was the prominent impact of biopile. This study also showed that the operation stage and the activated carbon replacement stage contributed 60% and 36% of the environmental impacts of SVE system, respectively. The major input affecting the environmental impact of SVE was electricity. The operation stage of biopile resulted in the highest contribution to the entire environmental impact. The key input affecting the environmental impact of biopile was also electricity. This study suggested that electricity reduction strategies would be tried in the contaminated-soil remediation sites for archieving less environmental impacts. Remediation of contaminated soil normally takes long time and thus requires a great deal of material and energy. More extensive life cycle researches on remedial systems are required to meet recent national challenges toward carbon dioxide reduction and green growth. Furthermore, systematic information on electricity use of remedial systems should be collected for the reliable assessment of environmental impacts and carbon dioxide emissions during soil remediation.

Development of BIM Standard Database System for an Approximate Estimate of Old-Aged Apartment Remodeling Project (노후공동주택 리모델링의 개략견적을 위한 BIM 데이터베이스 구축)

  • Lee, Dong-Gun;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.53-64
    • /
    • 2010
  • Remodeling becomes the significant issue in the aspect of the resource recycling, because it does not demolishes the whole buildings, but a part of main structure. However, compared with new construction, remodeling has several problems of adding the repair and rehabilitation works, using the partial demolition method, and having difficulties of making decision due to disagreement between several owner organizations. BIM, which is the total solution for managing and producing information during whole life cycle of the buildings, seems to be the right solution for the way to address these issues. has a possibility for solving the problems. Therefore this paper provided the framework and database for applying the BIM in the remodeling, and proved the applicability of the BIM database in the remodeling project through the case studies.

Building plan research of Smart Ammunition Logistics System based on the 4th industrial technology (4차산업혁명기술 기반 스마트 탄약물류체계 구축 방안 연구)

  • Choi, Jong-Geun;Kim, Byung-Kyoo;Chang, Yoon Seok
    • Journal of Internet Computing and Services
    • /
    • v.23 no.1
    • /
    • pp.135-145
    • /
    • 2022
  • This paper presented a method to build a predictable smart ammunition logistics system using the 4th industrial technology for ammunition logistics, which is the core functions in the field of defense and logistics. We have analyzed the current level of ammunition logistics with various perspectives such as domestic and overseas logistics policies, technology trends, ammunition logistics characteristics, the smart logistics certification measures by Ministry of Land, Infrastructure and Transport. As a result it is considered that the current ammunition logistics needs needs improvement. To improve this, we presented a direction based on the implications derived after analyzing various ongoing programs such as wired/wireless-based automation, smart ammunition depots, and logistics innovation of the army, navy, and air force that can be applied to the ammunition logistics. In order to implement a data-based smart ammunition logistics management system that can achieve innovation and efficiency of total life cycle while meeting changes in the battlefield environment, we presented 4 objectives such as "automation and modernization of field work", "3D-based storage management & improvement of issuing at war," and "data management for prediction-oriented ammunition management". it is expected that there will be benefits such as improvement of operational continuity, guarantee of ammunition reliability, budget reduction, improvement of inefficiencies such as delay, waiting, and double work, and reduction of accidents.

Developing a Program Performance Management Framework for Mixed-use Development in Urban Regeneration Projects (입체복합공간 개발사업의 프로그램 성과관리 체계 구축)

  • Lee, Kang-Wook;Hong, Hwa-Uk;Park, Hee-Dae;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.141-152
    • /
    • 2011
  • The market volume of urban regeneration projects has steadily increased, thereby mixed-use development also shows significant market growth. However, previous researches on urban regeneration mainly deduced suggestions and plans for institution improvement based on comparison between projects implemented the inside and outside of the country. Whereas, researches on project management closely related to project success were limited, particularly in performance management. Accordingly, this research aims at developing a program performance management framework for public clients so as to succeed mixed-use development projects. Through extensive literature review and expert interview, this research developed performance indices for diverse facilities, risk management framework and integrating method of program performance score. The proposed framework is able to consider total life cycle from basic planning to maintenance phase and to check real-time performance level. Moreover, risk management framework can periodically assess and control the level of inherent risks within performance indices. The results can contribute to improve existing performance management practices and be basis for a web-based system developed in future.

A FUNDAMENTAL STUDY TO DEVELOP STANDARD TECHNOLOGY CRITERIA FOR IT-CONSTRUCTION FUSION TECHNOLOGIES, TO BE APPLIED TO A U-CITY

  • Kyoon-Tai Kim;Jae-Goo Han;Chang-Han Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1352-1358
    • /
    • 2009
  • As the demand for a convergence between construction technologies and IT is on the rise, as seen in the visualization of U-City construction, studies on the ways in which IT in should be utilized in the building and construction field have been continuously and actively performed. However, there has been almost no development of standardized technology criteria relating to the life cycle of a building (planning, design, construction, and maintenance). That is, there are almost no examples of efforts made to combine construction technology and IT in a fundamental way, considering the environment, the facility, its spatial characteristics, engineering, materials, and structure, aspects that are commonly required not only for interior spaces but also for exterior construction of U-City. Despite the fact that a state-of-the-art infrastructure has been built, and the competency of users with the cutting-edge technology, composite studies on technologies, facilities, services and spaces are still lacking, and basic research on the composite operation method including compatibility and linkage between facilities and services within a U-City has been insufficient as well. It is generally known that by fusing IT with construction technologies, the total period of construction taken can be reduced and construction expenses can be curtailed, while construction quality can be improved. For this reason, it is vital to prepare a standardized base to connect cutting-edge IT with the construction technologies. In preparing such a base, the most urgent issue is to develop standardized technology criteria. The ultimate objective of this research is to establish the technological criteria system required to apply construction-IT fused technologies to U-Cities, and to develop the technological criteria for the design, construction and maintenance of the U-Cities. This paper, whose objective is to establish development strategies for construction-IT fused technologies by way of analyzing the criteria for conventional construction projects, the necessity of criteria for construction-IT fused technologies, and the current status of U-Cities' development, is the underlying research for this purpose. The strategies established are expected to be utilized in establishing the system of criteria for construction-IT fused technologies, and to contribute to a knowledge base in the construction-IT field. In addition, based on the strategies established, criteria for construction-IT fused technologies, such as design criteria and construction standards, will be developed, and by applying these criteria and standards, the ultimate objectives of U-Cities, which are the enhancement of urban competitiveness and the satisfaction of residents, will be attained

  • PDF

Model Development a Womens' Health Care Center in the Community (여성건강 간호센터를 위한 모형개발 - 일개 통합시를 중심으로-)

  • Lee, Eun-Hui;So, Ae-Yeong;Choe, Sang-Sun
    • Journal of Korean Academy of Nursing
    • /
    • v.30 no.5
    • /
    • pp.1195-1206
    • /
    • 2000
  • The purpose of this study was to analyze womens' health problems using Green & Kreuter's 1991 PRECEDE model and to develop a model for a womens' health care center located in the community. The subjects were recruited from Wonju City. 1. The results showed that 23% of the sample population felt there was a need for a womens' health care center. The mean number of health problems was 3.1. The prevalence rate, was 44.4%, and the rate for an artificial abortion, was 36.4%. Also 30.5% did not have a health examination in the past year. Women using the hospital for medical care accounted for 45% of the sample, while 40% used the drugstore. The average score on the HPLP was 2.41, and this was influenced by self-efficacy, family support, sexual role, and health locus of control. There are a few educational programs in the city provided by the Wonju Health Center and by community health nurse practitioners. 2. The nursing center, as defined in North America, is a nurse-anchored system of primary health care delivery or neighborhood health center. Centers offer various services ranging from primary care to the more traditional such as education, health promotion, wellness screening, and coordination of services by advanced practice nurses. For examples in Sweden MCH centers provide total services for childbearing women and their families, sexual counseling and education for adolescents, and screening by midwives for cervical cancer. 3. The developed model combines purpose, target population, organization, and services, and is related to health resources. The purpose is primary health care and promotion of the quality of life. The target population can be grouped according to the life cycle, (premarriaged age group, the childbearing/child rearing age group, and middle aged and elderly women) and focuses on self-help. The organization of the center includes an advisory committee to plan and evaluate, and a health services team that will be multidisciplinary to provide health care, counseling education, and research. The model development suggested that a variety of women's health care centers are needed to insure adequate management of women's health. Follow-up research using PROCEED is needed to analyze health outcomes. Also a health nursing specialist system is required to develop health promotion, and improve the quality of life of women.

  • PDF

The Comparative Study of Software Optimal Release Time Based on Weibull Distribution Property (와이블 분포 특성에 근거한 소프트웨어 최적 방출시기에 관한 비교 연구)

  • Kim, Hee-Cheul;Park, Hyoung-Keun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.8
    • /
    • pp.1903-1910
    • /
    • 2009
  • In this paper, we were researched decision problem called an optimal release policies after testing a software system in development phase and transferring it to the user. The applied model of release time exploited infinite failure non-homogeneous Poisson process This infinite failure non-homogeneous Poisson process is a model which reflects the possibility of introducing new faults when correcting or modifying the software. The failure life-cycle distribution used the Weibull distribution which has the efficient various property which has the place efficient quality. Thus, optimal software release policies which minimize a total average software cost of development and maintenance under the constraint of satisfying a software reliability requirement becomes an optimal release policies. In a numerical example, after trend test applied and estimated the parameters using maximum likelihood estimation of inter-failure time data, estimated software optimal release time.

A Study on the Importance and order of priority of the Major control item for DMSMS by using AHP analysis (AHP 분석을 통한 부품단종 주요관리항목 중요도 및 우선순위에 관한 연구)

  • Moon, Jayoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.10
    • /
    • pp.48-54
    • /
    • 2020
  • DMSMS (Diminishing Manufacturing Sources and Material Shortage) is increased by developing the scientific technique and downsizing the military part market. DMSMS affects the increase in total life cycle costs and serviceability. Therefore, advance control for parts is important to reduce the cost, and a database is needed to share information on the DMSMS. A task needs to be performed continuously by setting the major control item to management more efficiently. The purpose of this study was to deduce the major control item for the DMSMS management system. Thus, the pre-control item basis of the DAPA (Defense Acquisition Program Administration) Manual and the SD-22 Manual were first selected, and the results of the survey were analyzed by AHP (Analytic Hierarchy Process) method. Fifteen of the detailed items were stratified into three criteria (Impact, Probability, and cost of the DMSMS), and each weight for the items was calculated using a nine-point scale survey. The AHP survey was executed with 25 specialists in the DMSMS management field, and the score of consistency ratio over 0.1 was excluded. The model explained the results and suggested future directions for development.