• Title/Summary/Keyword: Total Life Cycle Cost

Search Result 184, Processing Time 0.03 seconds

A Study of Comparative Economic Evaluation for the System of Ground Source Heat Pump and District Heating and Cooling:Focusing on the Analysis of Operation Case (지열히트펌프와 지역냉난방 시스템의 운영사례를 중심으로 경제성 비교분석 연구)

  • Lee, Key Chang;Hong, Jun Hee;Kong, Hyoung Jin
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.28 no.3
    • /
    • pp.103-109
    • /
    • 2016
  • The purpose of this study is to perform comparative economic evaluation for the systems of ground source heat pump (GSHP) and district heating and cooling (DHC) by focusing on the analysis of operation case of GSHP. The adapted research object is a public office building located in Seoul. The capacity of ground source pump is about 3,900 kW. Ground heat exchanger is closed loop type. The analysis period for life cycle cost is 30 years. Economic evaluation is assessed from the viewpoints of the following four parts: initial cost, energy cost, maintenance and replacement cost, and environment cost. The total life cycle cost of GSHP is approximately 8,447 million won. The cost of the DHC System is approximately 3,793 million won. The cost of the DHC is approximately 46% lower than GSHP system under the condition of current rate for GSHP and DHC.

A study on the Diminishing Manufacturing Source and Material Shortages Management Cost Analysis to Select Optimization Alternatives (부품단종관리 비용분석을 통한 최적화 대안 수립)

  • Park, Kwang-Hyo;Shim, Bo-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.4
    • /
    • pp.311-316
    • /
    • 2020
  • The main cause of DMSMS is the rapid replacement cycle and short life cycle of parts, according to the development of science, compared to the long life cycle of weapons systems. In particular, the problem of the supply and demand of such parts becomes even more acute during the operation maintenance phase after the mass production and power generation stage. To eliminate DMSMS problems that arise continuously from development to the operation of weapon systems and select the most cost-effective countermeasures to obsolescence, this paper suggests a standard to determine the appropriate time for quantitative performance improvement by conducting total life cycle cost analysis. For such purpose, this study examined the domestic and overseas cost analysis methods and applied it to single domestic weapon system to verify the research. This study responds to the issue of discontinuing components and helps reduce the total life cycle cost of military products.

Exploration of Life-cycle Management for Government R&D Program: the Case of Preliminary Feasibility Study on R&D Program (국가연구개발사업의 전주기 관리방안 탐색: 연구개발 부문 예비타당성조사 제도를 중심으로)

  • Ahn, Sang-Jin;Park, Eun-Ji;Lee, Yoon Been
    • Journal of Korea Technology Innovation Society
    • /
    • v.17 no.1
    • /
    • pp.124-145
    • /
    • 2014
  • Market failure occurs when Pareto efficiency is not achieved through market mechanism. In order to solve this problem, government intervene market; paying great attention to the optimum state of resource allocation. However, as the size of government investment in R&D goes up, many professionals emphasize the importance in efficient management system. This work is the result of exploratory study to look into life-cycle management of governmental R&D program. Literature reviews and empirical research on governmental R&D programs elicit improvements for effective life-cycle management of governmental R&D program as follows: consistent discrimination between capital expenditure and recurring expenditure, dual management system by spending properties, implementing total cost management system in capital expenditure, and discrimination between preliminary feasibility study with confirming total program cost in recurring expenditure.

The Software Reliability Growth Models for Software Life-Cycle Based on NHPP

  • Nam, Kyung-H.;Kim, Do-Hoon
    • The Korean Journal of Applied Statistics
    • /
    • v.23 no.3
    • /
    • pp.573-584
    • /
    • 2010
  • This paper considers the differences in the software execution environments in the testing phase and the operational phase to determine the optimal release time and warranty period of software systems. We formulate equations for the total expected software cost until the end of the software life cycle based on the NHPP. In addition, we derive the optimal release time that minimizes the total expected software cost for an imperfect debugging software reliability model. Finally, we analyze the sensitivity of the optimal testing and maintenance design related to variation of the cost model parameters based on the fault data observed in the actual testing process, and discuss the quantitative properties of the proposed model.

Economic Analysis of Long-life Asphalt Pavements using KoPMS (한국형 포장관리시스템을 활용한 장수명 아스팔트 포장의 경제성 분석)

  • Do, Myungsik;Kwon, Sooahn;Baek, Jongeun;Choi, Seunghyun
    • International Journal of Highway Engineering
    • /
    • v.18 no.4
    • /
    • pp.19-28
    • /
    • 2016
  • PURPOSES : Long-life asphalt pavements are used widely in developed countries. In order to be able to devise an effective maintenance strategy for such pavements, in this study, we evaluated the performance of the long-life asphalt pavements constructed along the national highways in South Korea. Further, an economic evaluation of the long-life asphalt pavements was performed based on a life-cycle cost analysis. We aimed to devise a model for evaluating the performance of long-life asphalt pavements using the national highway pavement management system (PMS) database as well as for analyzing the economic feasibility of such pavements, in order to promote their use in South Korea. METHODS : The maintenance history and pavement performance data were obtained from the national highway PMS database. The pavement performances for a total of 292 sections of 10 lanes (5 northbound lanes and 5 eastbound lanes) of national highways were used in this study. Models to predict the performances of hot mix asphalt (HMA) and long-life asphalt pavements under two distinct traffic conditions were developed using a simple regression method. Further, the economic feasibility of long-life asphalt pavements was evaluated using the Korea Pavement Management System (KoPMS). RESULTS : We developed service-life prediction models based on the traffic volume and the equivalent of single-axle load and found that long-life asphalt pavements have service lives 50% longer than those of HMA pavements. Further, the results of the economic analysis showed that long-life asphalt pavements are superior in terms of various economic indexes, including user cost, delay cost, total cost, and user benefits, even though their maintenance cost is higher than that of HMA pavements. A comparison of the economic feasibilities of the various groups showed that group A is superior to HMA pavements in all aspects except in terms of the maintenance criterion (crack 20% or higher) as per the NPV index. However, the long-life asphalt pavements in group B were superior in terms of the maintenance criterion (crack 25% or higher) regardless of the economic feasibility. CONCLUSIONS : The service life of long-life asphalt pavements was found to be approximately 50% longer than that of HMA pavements, regardless of the traffic volume characteristics. The economic feasibility of long-life asphalt pavements was evaluated based on the KoPMS. The results of the economic analysis were the following: long-life asphalt pavements are exceptional in terms of almost all factors, such as user cost, delay cost, total cost, and user benefit; however, the exception is the maintenance cost. Further, the economic feasibility of the long-life asphalt pavements in group B was found to be better than that of the HMA pavements (crack 25% or higher).

A Study on the Maintenance Period Optimization for the Urban Tansit Vehicles (도시철도차량 유지보수주기 최적화 연구)

  • Park, Kee-Jun;Chung, Jong-Duck;Suh, Myung-Won
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.22-26
    • /
    • 2011
  • The urban transit vehicles has very complicated structures composed electric and mechanical parts and systems. Its system is important to insure operating stability pursuant to massive transfer. Also, its system takes a lot of maintenance cost than constructing cost due to its system which has longtime life cycle. Generally it is know that maintenance cost affect a lot on total cost because its life cycle cost takes a part more than 60~70%. For these reason, it is really important to reduce its maintenance cost through efficiently operation and maintenance management system construction.

  • PDF

A Study on the Estimation Analysis Methodology of the Optimum Economic Life-Span of Buildings (건축물의 최적 경제수명 추정분석 방법론에 관한 연구)

  • Choi, Jun-Young
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.6 no.3
    • /
    • pp.223-230
    • /
    • 2003
  • Generally, the life-span of a multi-housing complex is over 50 years, but in reality they are usually demolished after 20 years in spite of its remaining life expectancy. Thus, this research focuses on the estimation of the optimum economic life-span of a multi-housing complex. To estimate the minimum total cost point of start to finish of a multi-housing complex, we'll apply MAPI(Machinery and Allied Product Institute) and LCC(Life Cycle Cost) theory.

  • PDF

A study on the method of rolling stock maintenance cost management (철도차량 유지보수 비용관리 방안 연구)

  • Choi, Seog-Jung;Kim, Moon-Hong;Jung, Ye-Seoung
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1134-1141
    • /
    • 2011
  • Costs have long since become a major issue in railway system analysis, attention is not limited to the acquisition costs alone, but encompasses all costs involved in the use and disposal of the systems. Concepts such as Life Cycle Cost(LCC), Costs Of Ownership(COO), or Total Ownership Cost(TOC) are more and more frequent in any document dealing with system analysis. Most of railway projects have applied this LCC Model to evaluate effectiveness of system acquisition cost. But these action of LCC model does not applied all the rest of system life cycle period due to the differences of its responsibility. This is why a study has been undertaken by the operation party to harmonize the most important aspects of the LCC model. This study focused on these and other objectives for introduction of method and needs for an action plan for maintenance actions involved relevant cost allocation.

  • PDF

Life-Cost-Cycle Evaluation Analysis of the Shunting Locomotive (입환기관차의 LCC 평가분석)

  • Chung Jong-Duk;Kim Jeong-Guk;Pyun Jang-Sik;Kim Pil-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.551-556
    • /
    • 2004
  • The deterioration of a shunting locomotive was characterized for the lifetime assessment. The locomotive has been used for shunting works in steel making processes, and in this investigation, various types of technical evaluation methods for the locomotive parts were employed to assess the current deterioration status and to provide important clue for lifetime prediction. Unlike other rolling stocks in railway applications, the diesel shunting locomotive is composed of major components such as diesel engine, transmission, gear box, brake system, electronic devices, etc., which cover more than 70 percent of the total price of the locomotive. Therefore, in this paper, each part of major components in the diesel locomotive was analyzed in terms of the degree of deterioration. The life-cycle-cost (LCC) analysis was performed based on the maintenance and repair history as compared with economical cost to provide the cost-effective prediction, i.e., to assess either repair for reuse or putting the locomotive out of service based on cost-effective calculation.

  • PDF

High Performance Fiber Reinforced Cement Composites in Construction Field (건설분야의 섬유강화 시멘트 복합 신재료)

  • Hong, Geon-Ho;Kim, Ki-Soo;Han, Bog-Kyu
    • Composites Research
    • /
    • v.19 no.1
    • /
    • pp.43-48
    • /
    • 2006
  • High performance fiber reinforced cement composites have better performances than traditional cement based materials, therefore, have been expected as new construction applications such as the materials for construction & bridge structure, repair and rehabilitation applications, anti-collapse applications, anti-noise applications etc. However, they have lots of the problems such as material design, fabrication method and structural analysis. Also, the most serious problems of High performance fiber reinforced cement composites have been expensive initial cost, lack of long-term exposure data. As a result, it is needed that the efforts for lowering the initial cost and accumulation of long-term exposure. There has been hardly assessment results of life cycle cost for HPFRCC in construction field, but some papers showed that total life cycle cost could be profitable if the initial cost could be reduced.