Standardization for Post-Construction Evaluation Report (건설공사 사후평가결과보고서 표준화 방안)

  • Kim, Kyong hoon;Lee, Chankyu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.289-290
    • /
    • 2023
  • According to relevant laws, in the case of a construction project with a total construction cost of 30 billion won or more, a post-construction evaluation must be performed after completion. In addition, a post-construction evaluation report must be prepared and entered into the Continuous Acquisition & Life-cycle Support(CALS). As a result of reviewing the currently accumulated post-construction evaluation reports, since the report is not standardized, it is difficult for public project owners to write the report. It also hinders the post-construction evaluation and management center from verifying contents, analyzing data, and deriving meaningful results. In order to improve the convenience of the public owners who must conduct post-construction evaluations and the work efficiency of the center, evaluation factors were standardized and a standard post-construction evaluation report format for road construction was developed in Excel. Through this, the data in the reports will be effectively accumulated, managed, and analyzed, so that meaningful results will be produced and be helpful in future construction work.

  • PDF

Life Cycle Assessment of the Carbon Emissions of MLE process and Denitrification Process Using Granular Sulfur (MLE공법과 황이용 탈질 프로세스의 전과정 탄소 배출량 평가)

  • Moon, Jin-young;Hwang, Yong-woo
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.26 no.5
    • /
    • pp.619-627
    • /
    • 2012
  • In order to determine reduction of greenhouse gas emissions (GHGs) when the submerged membrane bioreactor with granular sulfur (MBR-GS) is used in wastewater treatment plant (WTP), the amount of GHGs was compared and analyzed in the advanced treatment process of P wastewater treatment plant (WTP). The amount of GHGs was estimated by classifying as construction and operation phase in WTP. The amount of GHGs in construction phase was evaluated from multiplying raw materials by using carbon emission factors. Also the amount of GHGs in operating phase was calculated by using total electricity consumption and carbon emission factor. The construction of anoxic tank and secondary settling tank is unnecessary, because the MBR-GS conducts simultaneously the nitrification and denitrification in aeration tank and filtration by hollow fiber membrane. The amount of $CO_2$, $CH_4$, and $N_2O$ emitted by constructing the MBR-GS was 6.44E+06 kg, 8.16E+03 kg and 1.38E+01 kg, respectively. The result shows that the GHGs was reduced about 47 % as compared with the construction in the MLE process. In operating the MBR-GS, the electricity is not required in the biological reactor and secondary setting tank. Thus, the amount of $CO_2$, $CH_4$, and $N_2O$ emitted by operating in the MBR-GS was 7.39E+05 kg/yr, 5.80E+02 kg/yr and 2.44E+00 kg/yr, respectively. The result shows that the GHGs were reduced about 37 % as compared with the operation in the MLE process. Also, $LCCO_2$(Life Cycle $CO_2$) was compared and analyzed between MLE process and MBR-GS. The amount of $LCCO_2 $emitted from the MLE process and MBR-GS was 3.56E+04 ton $CO_2$ and 2.12E+04 ton $CO_2$, respectively. The result shows that the GHGs in MBR-GS were reduced to about 40 % as compared in the MLE process during life cycle. As a result, sulfur-utilizing autotrophic denitrification process (SADP) is expected to be utilized as the cost-effective advanced treatment process, owing to not only high nitrogen removal efficiency but also the GHGs reduction in construction and operation stage.

A Preliminary Study for Deriving Subjects of MOT Method Based on the Utilization Status in Korea Enterprises (기업활용수준을 반영한 기술경영 연구방법론 교과도출을 위한 사전연구)

  • Lee, Jae-Ha;Na, Won-Shik
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.2
    • /
    • pp.212-219
    • /
    • 2012
  • This study focus on what methods of MOT are needed and utilized to solve a technical problem in the MOT leading company. We first classified the MOT methods by project life cycle and R&D job quality based on the several discussion with working group. In order to study, the survey was carried out by 168 experts working on MOT practices. Our main research findings are as follows. The level of utilized MOT methods was above average because MOT sector was beginning to represent an increasing share of total R&D business. But the satisfaction level on the MOT majors was below average. The more utilized MOT methods in practices were 'environment analysis and opportunity research,' 'business feasibility,' 'roadmapping,' 'portfolio,' 'technology tree,' 'scheduling,' 'risk management,' 'six sigma,' 'design of experiment,' 'quality control,' 'cost analysis' etc. And the subjects of product realization process were also needed to MOT practice such as 'design for reliability,' 'design for cost,' 'design for performance,' 'design for safety' deeply involved to product quality. Finally, the capability requested to University students were 'problem define and solving,' 'technology planning and strategy,' 'creative thinking.'

Crack Initiation and Propagation at the Gas Turbine Blade with Antioxidation and Thermal Barrier Coating (내산화 및 열차폐 코팅처리 가스터빈 블레이드의 균열거동)

  • Kang, Myung-Soo;Kim, Jun-Sung
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.27 no.12
    • /
    • pp.99-106
    • /
    • 2010
  • Gas turbines operation for power generation increased rapidly since 1990 due to the high efficiency in combined cycle, relatively low construction cost and low emission. But the operation and maintenance cost for gas turbine is high because the expensive superalloy hot gas path parts should be repaired and replaced periodically This study analyzed the initiation and propagation of the crack at the gas turbine blades which are coated with MCrAIY as a bond coat and TBC as a top coat. The sample blades had been serviced at the actual gas turbines for power generation. Total 7 sets of blades were analyzed and they have different EOH(equivalent operation hour). Blades were sectioned and the cracking distribution were measured and analyzed utilizing SEM(scanning electron microscope) and optical microscope. The blades which had 52,000 EOH of operation had cracks at the substrate and the maximum depth was 0.2 mm. Most of the cracks initiated at the boundary layer between TBC and bond coat and propagated down to the bond coat. Once bond coat is cracked, the base metal is exposed to the oxidation condition and undergoes notch effect. Under this environment, the crack branched at the inter-diffusion layer and propagated to the substrate. Critical cracks affecting the blade life were analyzed as those on suction side and platform.

Analysis of the Economic Efficiency of the District Heating and Gas Engine Co-Generation System Compared with the Central Heating System (중앙난방방식을 지역난방과 소형열병합난방 방식으로 전환 시 경제성 비교 분석)

  • Kim, Kyu Saeng
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.27 no.10
    • /
    • pp.544-551
    • /
    • 2015
  • This study was conducted to determine the LCC of apartment complexes with district heating and a cogeneration system. For the purpose of analyzing LCC according to the size of the apartment complex, 500, 1,500, and 4,000-unit model apartments were selected. Analysis was performed on the design of the heating system and the life cycle cost including total construction cost, maintenance and operation cost for the duration of the project period (15 years). According to the calculated results, 1) The initial cost of the cogeneration system for 500, 1,500, and 4,000-unit apartments is higher than that of the district heating system by 20%, 13%, and 12%, respectively. 2) In the case of the cogeneration system, the payback period by electric generation was found to be 5.21, 4.92 and 4.47 years, and saving cost was calculated to be 29 billion won, 94 billion won and 262 billion won after the payback period for 500, 1,500, and 4,000-unit apartments, respectively. 3) The LCC values of the cogeneration system were 1.12, 1.07 and 1.06 times larger than those of the district system according to the size of the apartment complex. In this study, the district heating system was found to be more efficient than the cogeneration system in terms of LCC reduction. 4) District heating is affected by fuel bills, so energy efficiency should be improved through recovering waste heat (incineration heat, etc.). Also, district cooling should be provided according to heat use to keep the temperature high in winter and low in summer.

Estimation of the Optimal Generation Capacity of Solar-Wind Hybrid Power System for Economic Operations (태양광-풍력 복합발전시스템의 경제적 운용을 위한 최적 용량 산정에 관한 연구)

  • Lee, Seung-Chul;Moon, Un-Chul;Kwon, Byeong-Gook;Kim, Jong-Hwan
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.18 no.3
    • /
    • pp.156-162
    • /
    • 2004
  • In this paper, a technique that estimate the optimal capacity of the solar-wind hybrid power system for minimizing the total monthly electric power expenses is presented. The hybrid power system is assumed to be operated in connection with the utility power system and electric bill be paid for the power not covered by the hybrid system generation. Monthly generation cost is estimated based on total life-cycle cost analysis. The monthly utility power bill is assumed to be increased quadratically in proportion with the net utility power consumption which is the difference between the total monthly load minus the hybrid system generations. Test results demonstrate applications potential of the proposed technique.

A Study on the Development plan of Configuration Control for Military Product (군수품 형상통제업무 발전방안에 관한 연구)

  • Jung, Hyun-Woo;Shim, Bo-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.6
    • /
    • pp.70-77
    • /
    • 2020
  • Configuration management is an important project management method. Configuration management is increasing daily and improving defense power as a management tool for technical data of power support systems. Configuration management work must be carried out properly from the beginning of development to acquire an excellent weapon system. In procurement, configuration management is a vital factor that can determine the cost of maintaining operations during the transfer of military supplies and carry out systematic management among operational support. Countries are making changes to policies and systems to manage R&D, standards, and patents in conjunction with each other from the beginning of research and execution, and it is important to establish the concept of managing and controlling the configuration as an efficient means of managing military resources. To identify the activity details during the entire life cycle from the beginning of acquisition to the end of disposal by linking munitions configuration control with the total life cycle, and redefine the appropriate work system, this study investigated and analyzed the U.S. configuration control procedures to identify the activity details and present areas to develop.

A Study on the Optimization of a Renewable Energy System in Fire Station Buildings (소방서건물의 신재생에너지시스템 최적화에 관한 연구)

  • Lee, Yong-Ho;Hong, Jun-Ho;Cho, Young-Hum;Hwang, Jung-Ha
    • Journal of the Korean Solar Energy Society
    • /
    • v.33 no.1
    • /
    • pp.79-88
    • /
    • 2013
  • This study set out to evaluate the economy, environmentality, and complexity (economy+environmentality) of fire station buildings of public service facilities and propose ways to apply the optimization of renewable energy system to fire station buildings. As for economy according to life cycle costs, economy increased when the application percentage of the geothermal and solar heat system increased over the three renewable energy system types (geothermal, solar heat, and solar photovoltaic). On the other hand, economy decreased when the application percentage of the solar photovoltaic system increased. As for environmentality according to tons of carbon dioxide, environmentality decreased when the application percentage of the geothermal and solar heat system increased. Environmentality increased when the application percentage of the solar photovoltaic system increased. As for complexity (economy+environmentality) according to the weighted coefficient method, complexity increased when the application percentage of the geothermal system increased. It was highest at the combination of the solar heat system (20%) and geothermal system (80%). On the other hand, complexity decreased when the application percentage of the solar photovoltaic system increased. It was lowest at the combination of the solar photovoltaic system (80%) and geothermal system (20%).

A Study on Estimation Method for Optimal Composition Rate of Hybrid ESS Using Lead-acid and Lithium-ion Batteries (연축전지와 리튬이온전지용 하이브리드 ESS의 최적구성방안에 관한 연구)

  • Park, Soo-Young;Ryu, Sang-Won;Park, Jae-Bum;Kim, Byung-Ki;Kim, Mi-Young;Rho, Dae-Seok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.6
    • /
    • pp.962-968
    • /
    • 2016
  • The large scaled lead-acid battery is widely used for efficient operation of the photovoltaic system in many islands. However, lithium-ion battery is now being introduced to mitigate the fluctuation of wind power and to replace lead-acid battery. Therefore, hybrid ESS(Energy Storage system) that combines lithium-ion battery with lead-acid battery is being required because lithium-ion battery is costly in present stage. Under this circumstance, this paper presents the optimal algorithm to create composition rate of hybrid ESS by considering fixed and variable costs in order to maximize advantage of each battery. With minimization of total cost including fixed and variable costs, the optimal composition rate can be calculated based on the various scenarios such as load variation, life cycle and cost trend. From simulation results, it is confirmed that the proposed algorithms are an effective tool to produce a optimal composition rate.

A Study on Optimal Configuration Method of Hybrid ESS using Lead-acid and Lithium-ion Batteries for Supply of Variation Loads (변동부하 공급을 위한 하이브리드 ESS의 연축전지와 리튬이온전지의 최적구성방안에 관한 연구)

  • Rho, Dea-seok;Choi, Seong-sik;Lee, Hu-dong;Chang, Byunh-hoon;Kim, Su-yeol
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.1
    • /
    • pp.49-54
    • /
    • 2016
  • The large scaled lead-acid battery is widely used for efficient operation of the photovoltaic system in many islands. However, lithium-ion battery is now being introduced to mitigate the fluctuation of wind power and to replace lead-acid battery. Therefore, hybrid ESS (Energy Storage system) that combines lithium-ion battery with lead-acid battery is being required because lithium-ion battery is costly in present stage. Under this circumstance, this paper presents the optimal algorithm to create composition rate of hybrid ESS by considering fixed and variable costs in order to maximize advantage of each battery. With minimization of total cost including fixed and variable costs, the optimal composition rate can be calculated based on the various scenarios such as load variation, life cycle and cost trend. From simulation results, it is confirmed that the proposed algorithms are an effective tool to produce a optimal composition rate.