• 제목/요약/키워드: Total Life Cycle Cost

검색결과 184건 처리시간 0.03초

Wind energy into the future: The challenge of deep-water wind farms

  • Ricciardelli, Francesco;Maienza, Carmela;Vardaroglu, Mustafa;Avossa, Alberto Maria
    • Wind and Structures
    • /
    • 제32권4호
    • /
    • pp.321-340
    • /
    • 2021
  • In 2019, 5.6% of the total energy produced worldwide came from wind. Offshore wind generation is still a small portion of the total wind generation, yet its growth is exponential. Higher availability of sites, larger producibility and potentially lower environmental impacts make offshore wind generation attractive. On the other hand, as the water depth increases, fixed foundations are no more viable, and the new frontier is that of floating foundations. This paper brings an overview of why and how offshore wind energy should move deep water; it contains material from the Keynote Lecture given by the first author at the ACEM20/Structures20 Conference, held in Seoul in August 2020. The paper is organized into four sections: the first giving general concepts about wind generation especially offshore, the second and the third considering economic and technical aspects, respectively, of offshore deep-water wind generation, in the fourth, some challenges of floating offshore wind generation are presented and some conclusions are drawn.

Application of first-order reliability method in seismic loss assessment of structures with Endurance Time analysis

  • Basim, Mohammad Ch.;Estekanchi, Homayoon E.;Mahsuli, Mojtaba
    • Earthquakes and Structures
    • /
    • 제14권5호
    • /
    • pp.437-447
    • /
    • 2018
  • Computational cost is one of the major obstacles for detailed risk analysis of structures. This paper puts forward a methodology for efficient probabilistic seismic loss assessment of structures using the Endurance Time (ET) analysis and the first-order reliability method (FORM). The ET analysis efficiently yields the structural responses for a continuous range of intensities through a single response-history analysis. Taking advantage of this property of ET, FORM is employed to estimate the annual rate of exceedance for the loss components. The proposed approach is an amalgamation of two analysis approaches, ET and FORM, that significantly lower the computational costs. This makes it possible to evaluate the seismic risk of complex systems. The probability distribution of losses due to the structural and non-structural damage as well as injuries and fatalities of a prototype structure are estimated using the proposed methodology. This methodology is an alternative to the prevalent risk analysis framework of the total probability theorem. Hence, the risk estimates of the proposed approach are compared with those from the total probability theorem as a benchmark. The results indicate a satisfactory agreement between the two methods while a significantly lower computational demand for the proposed approach.

생애주기를 고려한 오피스 건물의 리모델링과 그린리모델링의 경제성 평가 연구 : 서울시 강남업무지구의 임대오피스 사례 (An Economic Evaluation Study of Office Remodeling and Green-remodeling Projects : A Simulation Approach to a Rental Office in GBD, Seoul)

  • 이성호;이재수
    • 대한건축학회논문집:계획계
    • /
    • 제34권3호
    • /
    • pp.23-34
    • /
    • 2018
  • Due to a waste of energy in korea, about 525,000 which are 75 percent of total buildings are at least 15 years old buildings that need remodeling. There are two current remodeling systems. One is a remodeling system to reduce a waste of resources from the reconstruction. The other is a green-remodeling system aimed to energy savings and reducing environmental costs. This study is to analyze quantitatively these current systems with respect to the cost-benefit caused by the life cycle and suggests the political and institutional implications through the interpretation of the results. For a quantitative analysis, we analyzed reducing maintenance costs and rent benefits with simulation by using opportunity costs, construction costs, plan costs and supervision costs as expense variables and using the reduced floor area ratio, institutional incentives, energy, water resources and certified emission reduction(CER) as benefit variables. As a result of the empirical study, the green-modeling was more beneficial in the field of environment such as the energy savings, however, the final benefits of remodeling which has no green building certification costs but more floor area ratio incentives were more economical. The green-remodeling system focused on reducing environmental costs and energy savings needs a equatable institutional incentive system.

최적화기법을 활용한 교육시설물 BTL 사업 운영관리비용 비용예측 시스템 개발 기초연구 (A Study on Development of Maintenance Cost Estimation System for BTL Project of Education Facilities Using Optimization Methodology)

  • 조창연;손재호;김재온
    • 한국건설관리학회논문집
    • /
    • 제10권1호
    • /
    • pp.45-57
    • /
    • 2009
  • 교육시설물 BTL 사업은 여러 개의 시설물을 1개의 번들로 계약하며, 계약기간을 20년으로 산정하여 그 비용을 지급한다. 따라서 BTL 프로젝트 초기단계에 운영관리비를 예측하는 정확도와 발주번들에 포함되는 시설물을 어떻게 편성하느냐에 따라 비용편차가 크게 발생하게 된다. 본 연구에서는 교육시설물 BTL 사업 발주 시 운영관리 최적 번들을 구성하기 위한 방법으로 컴플리트 링키지 알고리즘을 이용하는 비용 예측 시스템을 개발하고, 이를 통해 발주번들에 포함되는 시설물 변화에 따라 제한조건들이 변화하는 경우에 대해 사용자의 의사결정 시 판단근거자료로 활용 가능하게 하고자 한다. 본 연구에서 제안하는 시스템을 활용하면 보다 효율적이고 신속한 BTL 프로젝트의 운영비 예측이 가능할 것으로 사료된다.

실내사육조건에서 한국산 물벼룩 종간 life cycle 비교 (Comparison of Life Cycle of Several Korean Native Freshwater Cladocerans in Laboratory Culture Conditions)

  • 김병석;박연기;박경훈;신진섭;김진화;윤성명;안용준
    • 농약과학회지
    • /
    • 제10권3호
    • /
    • pp.196-200
    • /
    • 2006
  • 국내서식 물벼룩종을 이용한 표준생태독성시험법 개발을 위한 기초연구로서 국내환경에서의 대표성, 실내사육가능성 및 독성시험에 적합한 크기 등을 고려하여 선발된 4종의 한국산 물벼룩 Daphnia sp., Daphnia obtusa, Moina macrocopa, S.imocephalus vetulus과 Daphnia magna에 대한 실내사육조건에서의 life cycle을 조사하였다. 국내산 물벼룩 4종과 D. magna에 대한 실내사육조건에서의 전 생애에 걸친 생육특성을 조사한 결과 D. magna가 어미 1마리당 평균 358마리의 새끼를 출산하였고 국내산 물벼룩 중에는 Daphnia sp.가 297마리의 새끼를 출산하여 가장 출산새끼수가 많았으며 그 다음으로는 M. macrocopa, S. vetulus, D. obtusa 순이었다. 평균수명은 D. magna가 50일로 가장 길었으며 국내산 물벼룩 중에는 Daphnia sp.가 39일로 조사되었으며 그 다음으로는 S. vetulus, D. obtusa M. macrocopa, 순이었다. 특히 M. macrocopa의 경우 번식력이 우수하면서도 세대기간이 짧아 기존의 번식독성시험법에서 제시하는 21일보다 짧은 10일 정도의 단기간에 번식영향을 평가할 수 있을 것으로 판단된다.

Energy Saving Effect and Economy Feasibility of Office Building with regard to Geometries and Orientations

  • Koh, Jae-Yoon;Zhai, John
    • International Journal of Air-Conditioning and Refrigeration
    • /
    • 제17권1호
    • /
    • pp.15-24
    • /
    • 2009
  • The energy usage and the economical feasibility of the typical two story office building in the three urban locations of South Korea are evaluated as the eight orientations. The smallest energy consume is shown at the true south. The ranges of the low energy consume are $-3l5^{\circ}{\sim}0^{\circ}\;and\;-135^{\circ}{\sim}-180^{\circ}$. There are obvious advantages of passive solar designs such as using a fully glazed facade at the true south in the building. The General Low voltage plan is the effective way for the office building when does not required the high voltage electricity. The energy cost of KEPCO is compared to that of XCEL ENERGY. The portion of the customer charge of XCEL ENERGY is about 10% but it is about 50% of the total tariff of KEPCO. The effective way to save the energy cost is by reducing the operating energy of XCEL ENERGY plane but the most effective way is reduce the contracting energy of KEPCO plane.

교량 안전성과 공용년수를 고려한 적정 보수보강 예산 배분 (Bridge Appropriate Maintenance Budget Allocation Considering Safety and Service Life)

  • 선종완;이후석;박경훈
    • 한국산학기술학회논문지
    • /
    • 제18권11호
    • /
    • pp.130-137
    • /
    • 2017
  • 교량의 목표 수명 동안 통행 안전성을 유지하기 위해서는 적정한 보수보강 예산의 확보와 확보된 예산의 합리적인 배분이 필요하다. 기존의 단순 교량 규모 기반 예산 배분 방식을 개선하여 다양한 영향인자를 고려한 합리적인 예산 배분 결정 체계를 제안하였다. 전체 교량을 하위 관리주체별로 일정한 관리 수준이 확보되도록 교량의 보수보강 예산을 적정하게 배분하기 위하여 과거 보수보강 이력에 기초한 조치율 모델과 단위 비용 모델을 개발하였다. 제안된 모델을 이용하여 관리주체별 적정 예산 배분 비율 결정 방법을 제안하고 사례 분석을 수행하였다. 교량의 보수보강 예산 배분의 영향 인자로 교량 규모뿐만 아니라 종별 현황과 현재 안전등급, 공용년수가 고려되어야 적정 예산 배분이 이루어지는 것으로 나타났다. 개발된 방법을 활용하여 관리 주체별 예산 소요를 명확하게 반영한 예산 분배를 시행함으로서 불필요한 예산 낭비를 방지하고 예산 배분의 합리적인 근거를 제공할 수 있을 것으로 판단된다.

공공임대주택 단위 수선비용 특성 분석 (The Characteristics of the Repair Unit Cost in Public Rental Housing)

  • 이강희;채창우
    • KIEAE Journal
    • /
    • 제14권5호
    • /
    • pp.103-109
    • /
    • 2014
  • Apartment housing should require the systematic maintenance to provide the decent living condition during its life. Each household should participate the maintenance activities and pay for the repair. Therefore, the required cost for repair would be needed to plan in the repair schedule because each household could not pay the much repair money at a time. After apartment constructed, a long term repair plan would be prepared in repair time, repair scope and a required cost. A few studies are said that the repair cost depends on the building deterioration, elapsed year and management factors. The above factors are not be certain to affect the repair management while it may be important to prepare the required money and the repair time. In this paper, it aimed at analyzing the correlation between the repair management and the management factors, especially total area, number of household. This would educe the unit cost per number of household and management area in the individual boiler and elevator with full change and full repair. The unit cost per number of household and area for full change are about 199,000 won/household and $1,954won/m^2$ in the individual boiler respectively. The unit cost of the elevator for full change is 94,000 won/household and $5,429won/m^2$ respectively. Second, this study shows that the elapsed year after construction would not be related the repair unit cost.

도로건설공사 토공작업부에 대한 환경부하 영향인자 분석 (An Analysis of Factors Affecting Environmental Load in Earthwork Type of Road Project)

  • 박진영;임제규;김병수
    • 한국건설관리학회논문집
    • /
    • 제19권4호
    • /
    • pp.52-60
    • /
    • 2018
  • 건설산업에서 LCA (Life Cycle Assessment)를 활용하여 환경영향을 평가하려는 시도가 점차 증가하고 있다. 그러나 제한된 사업예산과 일정으로 인해 신속한 의사결정을 수행해야 하는 국내 건설산업에서 모든 자재와 에너지를 대상으로 환경부하량에 대한 검토를 수행하는 것은 곤란하다. 따라서 친환경성 확보를 위한 의사결정과정에서 환경부하 저감을 위해 중점적으로 검토가 수행되어야 하는 주요 영향인자와 이를 환경영향평가로 연계할 수 있는 정량화된 정보의 제공이 요구된다. 이 연구에서는 이러한 정보의 제공을 위해 도로건설공사 사례의 LCA결과를 분석하였다. 분석결과 경유, 레미콘, 우레탄계도료, 골재, 아스팔트콘크리트가 도로 토공작업부에서 환경부하량의 93.17%를 발생시키는 주요 영향인자로 조사되었다. 도로 토공작업부 1km를 시공할 때 이들 영향인자에 의해 발생하는 총환경비용은 약 242백만원이며 레미콘과 아스팔트콘크리트의 작업물량 10%를 절감함에 따라 5.02%와 2.28%의 탄소배출량 감축효과를 얻을 수 있다. 두 자원의 탄소배출량 감축을 통해 1km당 약 11백만원의 환경비용을 절감할 수 있는 것으로 분석되었다. 도로 토공작업부의 탄소배출량 감축을 위해서는 레미콘과 아스팔트콘크리트의 사용량을 감소시키기 위한 신공법이나 친환경자재의 적극적인 개발과 도입이 필요할 것으로 판단된다.

PI6sigma를 이용한 R&D 프로세스 혁신 사례 연구 (A Case Study on R&D Process Innovation Using PI6sigma Methodology)

  • 김영진;정우철;최영근
    • 산업경영시스템학회지
    • /
    • 제33권1호
    • /
    • pp.17-23
    • /
    • 2010
  • The corporate R&D(Research and Development) has a primary role of new product development and its potential is the most crucial factor to estimate corporate future value. However, its systemic inadequacies and inefficiencies, the shorten product life-cycle to satisfy customer needs, the global operations by outsourcing strategy, and the reduction of product cost, are starting to expose to R&D business processes. The three-phased execution strategy for R&D innovation is introduced to establish master plan for new R&D model. From information technology point of view, PLM(Product Life-cycle Management) is one of the business total solutions in product development area. It is not a system, but the strategic business approach that collaboratively manage the product from beginning stage to end of life in all business areas PLM functions and capabilities are usually used as references to re-design new R&D process. BPA(Business Process Assessment) and 5DP(Design Parameters) in PI6sigma developed by Samsung SDS Consulting division are introduced to establish R&D master plan and re-design process respectively. This research provides a case study for R&D process innovation. How process assessment and PMM(Process Maturity Model) can be applied in business processes, and also it explains process re-design by 5DP method.