• Title/Summary/Keyword: Timing Driven

Search Result 60, Processing Time 0.025 seconds

Event-Driven Real-Time Simulation Based On The RM Scheduling and Lock-free Shared Objects

  • Park, Hyun Kyoo
    • Journal of the military operations research society of Korea
    • /
    • v.25 no.1
    • /
    • pp.199-214
    • /
    • 1999
  • The Constructive Battle Simulation Model is very important to the recent military training for the substitution of the field training. However, real battlefield systems operate under real-time conditions, they are inherently distributed, concurrent and dynamic. In order to reflect these properties by the computer-based simulation systems which represent real world processes, we have been developing constructive simulation model for several years. Conventionally, scheduling and resource allocation activities which have timing constraints, we elaborated on these issues and developed the simulation system on commercially available hardware and operating system with lock-free resource allocation scheme and rate monotonic scheduling.

  • PDF

The Implementation of Data Logging System by Using VME Modules based on Real Time Linux (RT-Linux를 OS로 하는 VME시스템을 이용한 Data Logging System 구현)

  • Hwang, Seok-Kyun;Koo, Kyung-Mo;Joo, Moon-G.;Lee, Jin-S.
    • Proceedings of the KIEE Conference
    • /
    • 2003.11c
    • /
    • pp.709-712
    • /
    • 2003
  • In this research, we port the RT-Linux to MVME 5100 board which is driven by VxWorks or Vertex until now. And, we developed the data logging modules by using the RT-Linux. This module gathers two different scan timing data from plant and sends this data to the host controller with real time.

  • PDF

A Cumulative Injected Fuel Mass Measurement Under a Vehicle Driven Condition using Loadcells (차량주행 모사 조건에서 로드셀을 이용한 인젝터 누적 연료 분사량 측정)

  • Cho, Seung Keun;Lee, Choong Hoon
    • Journal of ILASS-Korea
    • /
    • v.21 no.1
    • /
    • pp.1-6
    • /
    • 2016
  • A gasoline injector rig which can measure cumulative injected fuel mass under a vehicle driving condition was developed. The measurement system consists of an engine control unit (ECU), data acquisition (DAQ) and injected fuel collection system using loadcells. By supplying reconstructed sensor signals which simulate the real vehicle's sensor signals to the ECU, the ECU drives injectors as if they were driven in the vehicle. The vehicle's performance was computer simulated by using $GT-Suite^{(R)}$ software based on both engine part load performance and automatic transmission shift map. Throttle valve position, engine and vehicle speed, air mass flow rate et al. were computer simulated. The used vehicle driving pattern for the simulation was FTP-75 mode. For reconstructing the real vehicle sensor signals which are correspondent to the $GT-Suite^{(R)}$ simulated vehicle's performance, the DAQ systems were used. The injected fuel was collected with mess cylinders. The collected fuel mass in the mess cylinder with elapsed time after starting FTP-75 driving mode was measured using loadcells. The developed method shows highly improved performance in fast timing and accuracy of the cumulative injected fuel mass measurement under the vehicle driven condition.

Timing Optimization of Real-Time System Design for Embedded Systems (Embedded System Design을 위한 Real-Time System의 최적화된 Timing효과의 구현)

  • Park, Eun-Jung;Jeong, Tai-Kyeong
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.10 no.3
    • /
    • pp.564-570
    • /
    • 2006
  • This paper presents a new real-time system design methodology for embedded system as well as event-driven real time application. It is required to implement a deadline handling mechanism in order to satisfy a large-scale distributed real time application. When we design real time system, it has handled a deadline and is important to measure / control a timing issue. These timing constraints usually associated with an interface between model and system. There are many case tools that supporting a real time application, for example, UML, graphic language for designing real time system, but they cannot provide efficient way to handle deadline miss. Therefore, users have to design deadline handler manually when they need to use it. This paper contributes solving the problems of user-level deadline handling for an embedded system. Also, it also discusses an efficient deadline handler design mechanism using on RoseRT, which is a graphical CASE tool supporting from UML.

Quadratic Programming Based Standard-cell Placement with New Additional Force (새로운 부가 힘을 사용한 Quadratic Programming 기반의 표준셀 배치)

  • Gang, Sang-Gu;Im, Jong-Seok
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.39 no.6
    • /
    • pp.34-43
    • /
    • 2002
  • This paper deals with a standard cell placement which is based on a quadratic programming. This paper proposes a new additional force to reduce the cell overlap and to get a uniform distribution of cells. The additional force is not concerned with interconnections between cells, but it is determined by the density of a placement area. In this paper, we modelled that the new additional force is a force which is caused by the dummy fixed cell. And it is used for the global placement. Proposed placement method is compared with TimberWolf v7.0 and Itools vl.4. Proposed placer achieved 7.5% average reduction in wirelength in non timing driven mode, 5.0% average reduction in wlrelength in timing driven mode compared to TimberWolf v7.0. And we got a comparable result to Itools vl.4.

Relation between Earthward magnetotail flow and low-latitude Pi2 pulsations

  • Kwon, Hyuck-Jin;Kim, Khan-Hyuk;Lee, Dong-Hun;Takahashi, Kazue;Lee, Ensang;Angelopoulos, Vassilis;Park, Young-Deuk
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.37 no.2
    • /
    • pp.121.1-121.1
    • /
    • 2012
  • It has been suggested that oscillatory earthward bursty bulk flows (BBFs) in the magnetotail are driving Pi2 oscillations on the ground. However, only a few studies examined the BBF-driven Pi2 model. The goal of this study is to establish the relation between BBFs and Pi2s. In order to examine BBF-drive model, we will conduct the timing analysis between BBFs and Pi2s for the intervals during which both Pi2 and BBF are present. In our study BBFs are identified with earthward flow speeds up to 200 km/s from THEMIS probes with a geocentric distance between 7 and 12 RE in the nightside magnetosphere for the interval from January 2008 to March 2008. Pi2 pulsations are identified at three low/mid-latitude ground stations having different local times; Bohyun (L = 1.35, LT ~ UT +9 hr), Hermanus (L = 1.83, LT ~ UT +2 hr) and Carson city (L = 2.00, LT ~ UT -2 hr). It is found that ~28% of BBFs have onset timing nearly identical to Pi2 onset. To investigate whether there is high similarity in the waveform between BBF and Pi2 oscillations, the coherence analysis is applied to the time series of BBF and Pi2 events. We found that there is no high coherence between BBF and Pi2 oscillations. Thus our observations suggest that low-latitude Pi2 oscillations are not directly driven by earthward flow bursts.

  • PDF

Performance Improvement of Prediction-Based Parallel Gate-Level Timing Simulation Using Prediction Accuracy Enhancement Strategy (예측정확도 향상 전략을 통한 예측기반 병렬 게이트수준 타이밍 시뮬레이션의 성능 개선)

  • Yang, Seiyang
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.5 no.12
    • /
    • pp.439-446
    • /
    • 2016
  • In this paper, an efficient prediction accuracy enhancement strategy is proposed for improving the performance of the prediction-based parallel event-driven gate-level timing simulation. The proposed new strategy adopts the static double prediction and the dynamic prediction for input and output values of local simulations. The double prediction utilizes another static prediction data for the secondary prediction once the first prediction fails, and the dynamic prediction tries to use the on-going simulation result accumulated dynamically during the actual parallel simulation execution as prediction data. Therefore, the communication overhead and synchronization overhead, which are the main bottleneck of parallel simulation, are maximally reduced. Throughout the proposed two prediction enhancement techniques, we have observed about 5x simulation performance improvement over the commercial parallel multi-core simulation for six test designs.

LOW FUEL CONSUMPTION AND LOW EMISSIONS - ELECTROMECHANICAL VALVE TRAIN IN VEHICLE OPERATION

  • Pischinger, M.;Salber, W.;Staay, F.V.D.;Baumgarten, H.;Kemper, H.
    • International Journal of Automotive Technology
    • /
    • v.1 no.1
    • /
    • pp.17-25
    • /
    • 2000
  • The electromechanical valve train (EMV) technology allows for a reduction in fuel consumption while operating under a stoichiometric air-fuel-ratio and preserves the ability to use conventional exhaust gas aftertreatment technology with a 3-way-catalyst. Compared with an engine with a camshaft-driven valve train, the variable valve timing concept makes possible an additional optimization of cold start, warm-up and transient operation. In contrast with the conventionally throttled engine, optimized control of load and in-cylinder gas movement can be used for each individual cylinder and engine cycle. A load control strategy using a "Late Intake Valve Open" (LIO) provides a reduction in start-up HC emissions of approximately 60%. Due to reduced wall-wetting, the LIO control strategy improves the transition from start to idle. "Late Exhaust Valve Open" (LEO) timing during the exhaust stroke leads to exhaust gas afterburning and, thereby, results in high exhaust gas temperatures and low HC emissions. Vehicle investigations have demonstrated an improved accuracy of the air-fuel-ratio during transient operation. Results in the New European Driving Cycle have confirmed a reduction in fuel consumption of more than 15% while meeting EURO IV emission limits.

  • PDF

Timing analysis of RSFQ ALU circuit for the development of superconductive microprocessor (초전도 마이크로 프로세서개발을 위한 RSFQ ALU 회로의 타이밍 분석)

  • Kim J. Y;Baek S. H.;Kim S. H.;Kang J. H.
    • Progress in Superconductivity and Cryogenics
    • /
    • v.7 no.1
    • /
    • pp.9-12
    • /
    • 2005
  • We have constructed an RSFQ 4-bit Arithmetic Logic Unit (ALU) in a pipelined structure. An ALU is a core element of a computer processor that performs arithmetic and logic operation on the operands in computer instruction words. We have simulated the circuit by using Josephson circuit simulation tools. We used simulation tools of XIC, $WRspice^{TM}$, and Julia. To make the circuit work faster, we used a forward clocking scheme. This required a careful design of timing between clock and data pulses in ALU. The RSFQ 1-bit block of ALU used in constructing the 4-bit ALU was consisted of three DC current driven SFQ switches and a half-adder. By commutating output ports of the half adder, we could produce AND, OR, XOR, or ADD functions. The circuit size of the 4-bit ALU when fabricated was 3 mm x 1.5 mm, fitting in a 5 mm x 5mm chip. The fabricated 4-bit ALU operated correctly at 5 GHz clock frequency. The chip was tested at the liquid-helium temperature.

A High Power Micropump Using Active Check Valves Driven by Piezoelectric Actuators (압전구동 능동형 체크밸브를 이용한 고출력 마이크로펌프)

  • Kang, Jung-Ho
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.4 no.4
    • /
    • pp.39-47
    • /
    • 2005
  • In this paper, a novel high power micropump using active check valves in place of conventional passive check valves employed at the inlet and outlet ports is presented. It actively controls open/close motion of check valves using piezoelectric actuator for expansion/contraction of pump chamber. A prototype micropump having an effective size of $17mm{\times}8mm{\times}11mm$ is fabricated. Frequency-dependent flow rate characteristics, bi-directional flow characteristics and load characteristics are experimentally investigated using a timing control method for valve closing motion. From the obtained experimental results, it is ascertained that optimal values of the phase shift compared to the voltage to drive pump chamber are $15^{\circ}$ for inlet check valve and $195^{\circ}$ for outlet. Based on the obtained results, a sheet-type active shuttle valve that has a unified valve-body for inlet and outlet check valves is proposed. A micropump with an effective size of $10mm{\times}10mm{\times}10mm$ is fabricated and the basic characteristics are experimentally investigated.

  • PDF