• 제목/요약/키워드: Time progress

검색결과 2,174건 처리시간 0.028초

Progress Spinner의 진행 패턴 차이가 사용자의 인지 진행 속도 및 만족도에 미치는 영향 연구 (Effects of Different Patterns of Progress Spinner on Perceived Downloading Speed and Overall Satisfaction)

  • 박경진;김경도
    • 대한산업공학회지
    • /
    • 제43권3호
    • /
    • pp.184-191
    • /
    • 2017
  • Progress indicators provide information about downloading progress and the remaining time. Two common forms of indicator are bar and spinner. However, most studies have focused on the form of bar. Therefore, we are going to investigate which patterns of progress spinner show better perceived speed and satisfaction. Also the effects of provision of time information were studied. This study provided the progress spinner with different patterns with 4 seconds and 12 seconds download latencies. The participants evaluated overall satisfaction and perceived downloading speed. As a result, 'Speed Up' patterns showed the higher perceived downloading speed and satisfaction than 'Speed Down' patterns. In 4s situation, it was better with time information was absent. In 12s situation, it was higher in terms of the perceived downloading speed when time information was provided.

UML을 이용한 실시간 진도관리 시스템의 설계 및 구현 - 로봇 크레인 기반 철골공사를 중심으로 - (Design and Implementation of Real-Time Progress Management System Using UML (Unified Modeling Language) - The Focus on Steel Structural Construction -)

  • 박정로;김경환;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.163-166
    • /
    • 2009
  • All sorts of technique for schedule progress management is being developed recently, These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using UML, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

D4AR - A 4-DIMENSIONAL AUGMENTED REALITY - MODEL FOR AUTOMATION AND VISUALIZATION OF CONSTRUCTION PROGRESS MONITORING

  • Mani Golparvar-Fard;Feniosky Pena-Mora
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.30-31
    • /
    • 2009
  • Early detection of schedule delay in field construction activities is vital to project management. It provides the opportunity to initiate remedial actions and increases the chance of controlling such overruns or minimizing their impacts. This entails project managers to design, implement, and maintain a systematic approach for progress monitoring to promptly identify, process and communicate discrepancies between actual and as-planned performances as early as possible. Despite importance, systematic implementation of progress monitoring is challenging: (1) Current progress monitoring is time-consuming as it needs extensive as-planned and as-built data collection; (2) The excessive amount of work required to be performed may cause human-errors and reduce the quality of manually collected data and since only an approximate visual inspection is usually performed, makes the collected data subjective; (3) Existing methods of progress monitoring are also non-systematic and may also create a time-lag between the time progress is reported and the time progress is actually accomplished; (4) Progress reports are visually complex, and do not reflect spatial aspects of construction; and (5) Current reporting methods increase the time required to describe and explain progress in coordination meetings and in turn could delay the decision making process. In summary, with current methods, it may be not be easy to understand the progress situation clearly and quickly. To overcome such inefficiencies, this research focuses on exploring application of unsorted daily progress photograph logs - available on any construction site - as well as IFC-based 4D models for progress monitoring. Our approach is based on computing, from the images themselves, the photographer's locations and orientations, along with a sparse 3D geometric representation of the as-built scene using daily progress photographs and superimposition of the reconstructed scene over the as-planned 4D model. Within such an environment, progress photographs are registered in the virtual as-planned environment, allowing a large unstructured collection of daily construction images to be interactively explored. In addition, sparse reconstructed scenes superimposed over 4D models allow site images to be geo-registered with the as-planned components and consequently, a location-based image processing technique to be implemented and progress data to be extracted automatically. The result of progress comparison study between as-planned and as-built performances can subsequently be visualized in the D4AR - 4D Augmented Reality - environment using a traffic light metaphor. In such an environment, project participants would be able to: 1) use the 4D as-planned model as a baseline for progress monitoring, compare it to daily construction photographs and study workspace logistics; 2) interactively and remotely explore registered construction photographs in a 3D environment; 3) analyze registered images and quantify as-built progress; 4) measure discrepancies between as-planned and as-built performances; and 5) visually represent progress discrepancies through superimposition of 4D as-planned models over progress photographs, make control decisions and effectively communicate those with project participants. We present our preliminary results on two ongoing construction projects and discuss implementation, perceived benefits and future potential enhancement of this new technology in construction, in all fronts of automatic data collection, processing and communication.

  • PDF

중국 웹사이트의 프로그래스바 스타일에 관한 연구 (A Study on the progress bar's styles in Chinese websites)

  • 마웨;이동훈
    • 한국콘텐츠학회:학술대회논문집
    • /
    • 한국콘텐츠학회 2010년도 춘계 종합학술대회 논문집
    • /
    • pp.520-523
    • /
    • 2010
  • I investigated the styles of progress bar in the top 8 China's websites. According to the authoritative literature, I calculated the time which each kind of operation needed. I investigated 400 examples which were used the progress bar. The statistical result confirmed my idea - progress bar's style and user's waiting time has the relations. Finally, I gave the revision comment which the progress bar's style improvement.

  • PDF

다중 공정 계획 환경하의 실시간 계획 반영 시스템에 관한 연구 (A Study on Real-Time Planning System in Multi Progress Planning Environment)

  • 이대형;김용섭;김정훈
    • 대한조선학회논문집
    • /
    • 제45권5호
    • /
    • pp.547-553
    • /
    • 2008
  • Multi Progress Planning System problem in a multi-stage manufacturing system have a complexity and peculiarity different from other kinds of production system. World leading company has invested much cost and effort into a Real-Time Planning System and intelligent manufacturing field to obtain their own competitiveness. Especially Real-Time Planning System for ship production process as a part of intelligence for a shipyard. Real-Time Planning System, simulation based system, or virtual manufacturing system is an approach to achieve a such goal. It is expected that the Real-Time Planning System will contribute to the improvement of the productivity in working process at a shipyard. Also, This Real-Time Planning System will optimize the entire shipbuilding process in a multi progress planning environment for the delivery.

성과측정유닛을 활용한 건설 비용 - 일정 통합관리 방안 (Construction Cost-Schedule Integration Management Methodolgy by using Progress Integration Unit)

  • 강남희;최재현
    • 한국건설관리학회논문집
    • /
    • 제18권3호
    • /
    • pp.42-51
    • /
    • 2017
  • 건설 프로젝트의 생산과정에서 성과를 지속적으로 측정하고 평가하는 것은 프로젝트관리의 성공적인 수행을 위한 핵심요소이다. 성과는 일반적으로 목적물에 할당 된 공정과 원가 관련 정보를 정량적으로 평가함으로써 측정되며, 객관적인 성과측정을 위해 공정과 원가가 통합적으로 계획 관리되어야 한다. 본 연구는 공정과 원가의 통합 모델을 통해 성과 측정 방법론을 제안하고 진도관리의 기반을 마련하는데 목적이 있다. 이를 위해 공정계획과 원가계획의 표준화된 업무 프로세스를 개발하였고, EVM과 기존의 통합 모델을 분석하여, 성과측정 유닛을 활용한 WBS와 CBS의 통합 방법론을 제시하였다. 플랜트 프로젝트의 시공단계를 중심으로 공통 성과측정의 대상은 공종으로 선정하여 성과측정 유닛을 규정하고 공정과 비용정보를 연계시켜 성과비율을 산정하였다. 또한 리소스의 적용시 원가요소 중 소모성자원의 비용을 배제하여 진도측정의 객관성을 향상하였다. 본 결과는 실제 플랜트 사례 프로젝트에 적용하여 실증되었으며, 개발된 방법론은 향후 프로젝트의 성과를 보다 객관적인 기준으로 평가할 수 있어 보다 효과적인 진도관리 방법이 될 것으로 판단된다.

수정된 maximal progress 상태 탐사방법에 의한 개선된 프로토콜 검증 알고리즘 (An Improved Protocol Validation Algorithm by Modified Maximal Progress Sequence)

  • 이철희;이상호;고원국
    • 한국통신학회논문지
    • /
    • 제13권3호
    • /
    • pp.231-238
    • /
    • 1988
  • 본 논문에서는 두개의유한 상태 통신 기계에 대한 통신 프로토콜을 검증할 수 있도록 수정된 maximal progress 상태 탐사 방법을 제안한다. 모든 도달 가능한 상태들을 생성하는 작업은 두개의 독립된 작업으로 구분하며, 각 작업에서는 어느 한 기계에 대한 도달 가능한 상태들을 수정된 maximal progress순서에 의해서 생성되도록 한다. 이러한 maximal progress 상태 탐사 방법은 기존의 maximal progress 상태 탐사 방법보다 더 적은 시간과 공간을 요구한다.

  • PDF

A cognitive model for forecasting progress of multiple disorders with time relationship

  • Kim, Soung-Hie;Park, Wonseek;Chae, In-Ho
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1996년도 춘계공동학술대회논문집; 공군사관학교, 청주; 26-27 Apr. 1996
    • /
    • pp.505-510
    • /
    • 1996
  • Many diseases cause other diseases with strength of influences and time intervals. Prognostic and therapeutic assessments are the important part of clinical medicine as well as diagnostic assessments. In cases where a patient already has manufestations of multiple disorders (complications), progress forecasting and therapy decision by physicians without support tools are very dificult: physicians often say that "Once complications set in, the patient may die". Treating complications are difficult tasks for physicians, because they have to consider all of the complexities, possibilities and interactions between the diseases. The prediction of multiple disorders has many bundles that arise from such time-dependent interrelationships between diseases and nonlinear progress. This paper proposes a model based on time-dependent influences, which appropriately describes the progress of mulitple disorders, and gives some modificaitons for applying this model to medical domains: time-dependent influence matrix manifestation vector, therapy efficacy matrix, S-shaped curve approximation, definitions of which are provided. This research proposes an algorithm for forecasting the state of each disease on the time horizon and for evaluation of therapy alternatives with not toy example, but real patient history of multiple disorders.disorders.

  • PDF

u-Conference를 위한 RFID 기반의 실시간 상황 서비스 모델 (Real-time Context Service Model Based on RFID for u-Conference)

  • 강민성;김도현;이광만
    • 대한임베디드공학회논문지
    • /
    • 제2권2호
    • /
    • pp.95-100
    • /
    • 2007
  • Recently ubiquitous application services are developed plentifully using RFID techniques in the field of distribution and security industries. However, except these field the applications using RFID are not mature yet. In this study, we proposed a real-time context service model of the u-conference based on the real-time contextual information acquired from conference and exposition. With collection of real-time contextual information for u-conference, the model can provide a lot of information services on the state of session attendee, doorway control, affairs, user certification, presentation progress etc. For the verification of proposed real-time context service model of u-conference, we design and implement the conference progress state service included the state of session attendee, user certification and presentation progress etc. This service provides the presentation state information included the current presenter, the paper list, the number of session attendee, the schedule and place of each session using the collecting RFID tag and the related information.

  • PDF

철골골조공사의 실시간 진도관리 시스템 구축에 관한 연구 (A Study on the Development of a Real-Time Schedule Progress Control System in Steel Structural Construction)

  • 김경훈;김경환;이윤선;김재준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.886-891
    • /
    • 2007
  • 최근 공정관리를 위한 각종 기법들이 개발되고 있으며, 실질적인 시공프로세스를 구체적인 3차원 이미지로 형상화하여 보여줌으로써, 공정계획에 대한 추상적인 개념 모델을 구체적인 것으로 변환하여 발전시킬 수 있다. 하지만 이는 3D-CAD와 공정프로그램을 연계하여 사용하는 방식으로 사람이 정보를 옮겨주거나 입력을 해야 하는 번거로움이 수반된다. 본 연구에서는 3D-CAD 객체 정보 시스템 활용 및 공정자동생성 모듈을 활용하여 통합DB 구축을 통한 실시간 철골공사 공정관리 시스템 프로세스를 구축하였다. 본 연구는 IDEF0 모델을 이용하여 철골공정 관리 프로세스를 제시하였으며, RFID 시스템 설계를 통하여 실시간 진도관리 및 분석 프로세스를 제시하였다. 이를 통해 예상공정정보의 신속한 생성과 실시간으로 실제공정정보와의 비교 ${\cdot}$ 분석 및 시뮬레이션을 실현하고자 한다.

  • PDF