During last two decades the transportation system has developed into very intelligent system with GIS, GPS and ITS. The practical transportation management system provides real time response module to manage the customer's order. We have surveyed research papers on the real time vehicle routing problem in last two decades to figure out the dynamic vehicle routing problem. The papers are classified by basic routing algorithms and by managing the dynamic events which are the order management, the routing re-optimization, the routing post-optimization and the waiting strategy.
This note discusses the inter-loss time ofan M/G/1/1 queuing system. The inter-loss time is defined as the time duration between two consecutive losses of arriving customers. In this study, we present the explicit Laplace transform of the inter-loss time distribution of an M/G/1/1 queuing system.
This study is aimed to develop a system to position and manage object flow in real time. Logistics management system which position objects and vans using GPS is required to load, unload and keep freight effectively and in real time at sea or airport. In this study, a management system which is consisted of five sub-systems is developed; GPS position analysis system, GPS interface system, mapping system, network system and database management system.
본 논문에서는 국가자격종합관리시스템 구축 및 운영의 효율성을 향상시키기 위하여 외부위탁 관리시스템과 연계한 실시간 자료공유 시스템을 설계하고 개발하였다. 현재까지 대부분의 국가자격 종합관리시스템은 IT 전문기업에 개발, 구현, 운영에 대한 전반적인 사항을 위탁으로 수행한 후, 처리 결과에 대한 정보를 인수받아 업무를 처리하였다. 이러한 처리방식은 전체적인 정보에 대한 재처리, 기능추가, 시스템 안정성 등에 많은 문제점을 가지고 있다. 제안된 실시간 자료공유 시스템의 성능평가를 위하여 기본적 시뮬레이션으로 파일럿시스템에서 제안 기술을 적용하여 검증 한 후 대한상공회의소 실시간 국가기술자격 시험에 적용한 결과 안정성이 입증되어 지방상공회의소까지 지속적으로 확대 적용할 계획이다. 국가자격종합관리 실시간 자료공유 시스템은 정보재처리와 부가기능 추가시 발생되는 개발기간에 대한 문제를 근본적으로 해결하였으며 안정적 시스템운영 상태와 최대 효율성을 보여주었다. 특히 국가자격시스템 내부관리자와 운영자에 대한 관리체계와 편리성에서 최상의 평가를 도출하였다.
Kwang-pyo Lee;Hyunsoo Lee;Moonseo Park ;Hyunsoo Kim
국제학술발표논문집
/
The 3th International Conference on Construction Engineering and Project Management
/
pp.890-896
/
2009
In past projects, the main goal has been to enhance efficiency by reducing cost and time. However, considering the current condition of safety management in many construction companies, it can be confirmed that safety management has not been a top priority for a long time. Current safety management, which is based on safety standards and rules, is very ineffective and only emphasizes management after an incident. As well, although fewer accidents occur compared to the past, because construction projects are increasingly large in scale and complex, these accidents tend to be more serious and involve greater monetary loss. Furthermore, as the severity of these accidents increases, so does the possibility of fatalities. Therefore, improving safety management is essential. This study proposes an effective program for safety management, focusing on the processes to connect studies and systems, and the basic techniques required for program development. To realize this program, technical tools are suggested, including systems such as BIM (Building Information Modeling); additionally, the coordination of other systems such as an RTLS, a server, and an alarm system is proposed.
컴퓨터 클럭은 자체의 불안정한 요소, 물리적 특성, 외부 환경의 요인, 사용자의 개입 및 시스템의 오류 요소로 인해 정확도와 안정도에 한계를 갖는다. 따라서 정밀한 시각 관련 처리가 필요한 시스템의 경우 표준 시각에의 동기화가 요구된다. 시각 동기의 목적은 분산 처리 시스템 상에 전역 시각 기저를 제공하는데 있다. 일단 이러한 시각 기저가 존재하게 되면, 분산 시스템 상에서 처리되는 일련의 작업들은 시각을 바탕으로 제어가 가능하기 때문이다. 본 논문은 인터넷 기반 분산 환경에서 시각 동기를 위한 임베디드 시스템의 설계 및 구현에 대해 제시한다. 시스템은 참조 시각원으로 GPS(Global Positioning System)를 사용하고, NTP(Network Time Protocol)를 통해 표준시(UTC: Universal Time Coordinated)를 제공함으로써 분산 시스템의 시각 동기를 이룬다. 이를 위해 안정적인 시각 유지 및 정확하고 정밀한 표준 시각 제공 요건을 만족하는 클럭 모델을 설계, 적용하였다. 네트워크 관리를 위해SNMP(Simple Network Management Protocol) 기반 private MIB(Management Information Base)를 정의하였고, 전체 시스템의 구현 및 성능 평가 결과도 제시하였다.
This paper develops a process monitoring system for real-time process control. The practical case is studied on a small and medium marine equipment company. For business process reengineering of the company, we adopt an approach based on information engineering methodology, which consists of four stages : planning, analysis, design, and implementation. The system is developed for Client/Server environment. We discuss the constructing of hardware system for real-time process control at low cost. The developed system is composed of interrelated modules for item master and BOM management, process control, facility management, SQC and work report.
대한산업공학회/한국경영과학회 1993년도 춘계공동학술대회 발표논문 및 초록집; 계명대학교, 대구; 30 Apr.-1 May 1993
/
pp.49-56
/
1993
We consider a B/G/1 queueing system with vacations, where the server closes the gate when it begins a vacation. In this system, customers arrive according to a Bernoulli process. The service time and the vacation time follow discrete distributions. We obtain the distribution of the number of customers at a random point in time, and in turn, the distribution of the residence time (queueing time + service time) for a customer. This system finds an application in the performance evaluation of the DQDB protocol which has been adopted as the standard protocol for IEEE 802.6 MAN.
The 5th International Conference on Construction Engineering and Project Management
/
pp.352-358
/
2013
As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner
The study proposes three types of production lead time according to the production or demand pattern. First of all, it discusses the difference of three lead times. While pitch time and cycle time are used in push system with process stock and mass conveyor production, the tact time is used in pull system like as JIT based lean production system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.