• 제목/요약/키워드: The advantages of ITB

검색결과 2건 처리시간 0.014초

중간단계 터빈 버너(ITB) 사용 터보팬 엔진의 성능 해석 (Parametric Cycle Analysis for a Turbofan Engine with Interstage Turbine Burner)

  • 이승환;구자예
    • 항공우주시스템공학회지
    • /
    • 제3권4호
    • /
    • pp.19-27
    • /
    • 2009
  • ITB(Interstage Turbine Burner) is a kind of afterburner locating between HPT(High Pressure Turbine) and LPT(Low Pressure Turbine). The objective of this study is to use the engine's design parameters as input parameters to obtain engine's performance parameters, such as specific thrust and its thrust specific fuel consumption. This study analyzes the performance of Turbofan engines with ITB and compares the performance between Turbofan engines with ITB and Turbofan engines without ITB. Results of this study can verify the advantages of Turbofan engine with ITB in term of thrust, efficiency.

  • PDF

병원건축 일괄입찰방식의 적합성과 평가기준 개선방안에 관한 연구 - 건축계획의 설계변경사례를 중심으로 - (A Study on the adequacy of Hospital Architecture Deign-Build and Improvement of Assessment Criteria - Focus on the case of Architectural Planning Design Change -)

  • 홍승민;양내원
    • 한국실내디자인학회논문집
    • /
    • 제21권2호
    • /
    • pp.215-222
    • /
    • 2012
  • Design-build is expanding gradually in large construction projects over 10billion won, and continue to work in health care facilities is increasing in this way. This constructional method in health care facilities, despite the many advantages, many problems caused by design changes are being raised. Raises the question of design changes on the side of construction contract, such as approval systems have been studied in the field of construction. The purpose of this study design in aspects of architectural planning on changing the grasp of the issues outlined in the ITB and bid evaluation criteria through consideration of the basic plan for improvement guidelines and evaluation criteria is presented. In conclusion, Design build, according to the presence of existing users are more likely to lead to design changes. Thus, hospital architecture, depending on how it is considered that constructional methods. And evaluation items of ITB(Invitation To Bidder) for a large part of the change in the variables evaluated in the hospital building is not suitable for the design build. Instead, the overall shape of the building and department, unit type and size, vertical and horizontal parts of the circulation system in the shape of the building that does not change in structure and etc should be considered for evaluation.

  • PDF