Practitioners' Perception on Relationship between Production Planning and Waste Occurrence in Construction Projects

  • Khanh, Ha Duy;Kim, Soo Yong
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.1-12
    • /
    • 2014
  • Construction management has been suffering from many problems, which need to be solved or better understood. Most of construction projects have not achieved efficiency as expected. In this context, waste was also considered as a problem of efficiency decrease, and poor production planning was considered as a cause for waste. This study was conducted on the basis of waste concepts and production planning processes based on the philosophies of Lean Construction. A survey to find out the relationship between them was carried out through questionnaire, which was answered by experienced people in construction projects. The results have shown that frequency of wastes occurrence is quite high, and production planning processes are superficially performed in construction phase. There is a significant negative relationship between production planning and waste occurrence (r = -0.262). Weekly Work Plan (WWP) is the most dominant plan for waste control with seventeen in total of nineteen waste factors, and phase plan is the most dominant plan for two remaining waste factors. A case study was adopted to validate the relationship between production planning and waste occurrence. The results showed that the better the project was planned, the fewer the waste would occur on construction sites.

Generator's Maintenance Scheduling to Improve Supply Reliability (공급신뢰도 개선을 위한 발전기 보수계획)

  • 차준민
    • Journal of Energy Engineering
    • /
    • v.7 no.1
    • /
    • pp.89-95
    • /
    • 1998
  • Maintenance scheduling of generators plays an important role in evaluating supply reliability of power systems. Since generators must be maintained and inspected, the generation planner must schedule planned outages during the year. Several factors entering into this scheduling analysis include: seasonal load-demand profile, amount of maintenance, size of the units, elapsed time from last maintenance, and availability of maintenance crew. This paper proposes a new maintenance scheduling algorithm for the alternatives of long-term generation expansion planning by using LOLP levelization method which is known as an effective method for the generator's maintenance scheduling. To get the best supply reliability of power systems, we change the maintenance period to levelize the reliability over all period. The proposed algorithm is applied to a real size power system and the better reliability results are obtained.

  • PDF

Spatiotemporal chronographical modeling of procurement and material flow for building projects

  • Francis, Adel;Miresco, Edmond;Le Meur, Erwan
    • Advances in Computational Design
    • /
    • v.4 no.2
    • /
    • pp.119-139
    • /
    • 2019
  • Planning and management building projects should tackle the coordination of works and the management of limited spaces, traffic and supplies. Activities cannot be performed without the resources available and resources cannot be used beyond the capacity of workplaces. Otherwise, workspace congestion will negatively affect the flow of works. Better on-site management allows for substantial productivity improvements and cost savings. The procurement system should be able to manage a wider variety of materials and products of the required quality in order to have less stock, in less time, using less space, with less investment and avoiding multiple storage stations. The objective of this paper is to demonstrate the advantages of using the Chronographic modeling, by combining spatiotemporal technical scheduling with the 4D simulations, the Last Planner System and the Takt-time when modeling the construction of building projects. This paper work toward the aforementioned goal by examining the impact that material flow has on site occupancy. The proposed spatiotemporal model promotes efficient site use, defines optimal site-occupancy and workforce-rotation rates, minimizes intermediate stocks, and ensures a suitable procurement process. This paper study the material flow on the site and consider horizontal and vertical paths, traffic flows and appropriate means of transportation to ensure fluidity and safety. This paper contributes to the existing body of knowledge by linking execution and supply to the spatial and temporal aspects. The methodology compare the performance and procurement processes for the proposed Chronographic model with the Gantt-Precedence diagram. Two examples are presented to demonstrate the benefits of the proposed model and to validate the related concepts. This validation is designed to test the model's graphical ability to simulate construction and procurement.

Survey of Geomorphological Resources of 'Daegu Innovation Town' Development Plan Area (대구 혁신도시 개발예정지의 지형자원 조사)

  • Son, Myoung-Won
    • Journal of the Korean association of regional geographers
    • /
    • v.14 no.2
    • /
    • pp.173-188
    • /
    • 2008
  • In order to make comparative analysis of geomorphological changes caused by urban development, I surveyed the distribution of geomorphological resources of 'Daegu Innovation Town' development plan area. The results are as follow: (1) At the front of small valleys of back-mountains are formed small alluvial fans, and at the side of small valleys are distributed hills connected with back-mountains. (2) As small valley erode laterally hills, vertical bluffs and planner bedrock riverbed are formed, and in some riverbed are appeared mud cracks and ripple marks. (3) The depth of valley in alluvial fan of 'Sinseo District' is 7m. In Sinseocheon valley dissecting alluvial fan, fluvial terraces 2m high above riverbed are distributed. Those terraces were formed while alluvial fan was dissected after last glacial period.