• Title/Summary/Keyword: The Kori Nuclear Power Plant

Search Result 170, Processing Time 0.024 seconds

Comparison of CALPUFF and HYSPLIT Models for Atmospheric Dispersion Simulations of Radioactive Materials (CALPUFF와 HYSPLIT의 방사성물질 대기확산 특성 비교)

  • An, Hye Yeon;Kang, Yoon-Hee;Song, Sang-Keun;Kim, Yoo-Keun
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.31 no.6
    • /
    • pp.573-584
    • /
    • 2015
  • In this study, the atmospheric dispersion of radioactive material ($^{137}Cs$) was simulated with regard to its impact within a 50-km radius from the Kori Nuclear Power Plant (NKPP) based on two different types of models (the non-steady-state puff model CALPUFF and the lagrangian model HYSPLIT) during the spring of 2012 (May 2012). The dispersion distribution of $^{137}Cs$ calculated in the CALPUFF model was similar to that of the HYSPLIT model, but the magnitudes of differences in its spatio-temporal concentrations between the two models were different. The $^{137}Cs$ concentrations simulated by the CALPUFF were significantly lower than those of the HYSPLIT due to a limitation of puff models (e.g. puff size growth over time). The CALPUFF had the advantage of determining the dispersion of radioactive materials and their impacts on the surrounding regions, compared with the HYSPLIT that had high concentrations of $^{137}Cs$ in only small local areas with the movement of air masses along the local winds.

Economic Feasibility Study of the Life Extension by Reactor Type of Nuclear Power Plant in Korea (우리나라 원자력발전의 노형을 고려한 계속운전의 경제성 비교 연구)

  • Cho, Sungjin;Kim, Yoon Kyung
    • Environmental and Resource Economics Review
    • /
    • v.27 no.2
    • /
    • pp.261-286
    • /
    • 2018
  • This paper evaluated the economic feasibility of the life extension of Kori unit 1 and Wolsong unit 1 according to the types of the nuclear power plants (NPPs) and the life extension period comparing to the levelized costs of energy (LCOE) of the new NPPs, coal-fired plants (CFPs), and combined cycle gas turbine (CCGTs) which proposed in the $7^{th}$ Basic Plan for Electricity Supply and Demand. The economic feasibility of the life extension of NPPs using LCOE method is affected by the types of NPPs, lifetime extension periods, discount rate, and capacity factor. According to the analysis results, the pressurized light water reactor (PWR) is more economical than the pressurized heavy water reactor (PHWR). Comparing the economical efficiency between the life extension of NPPs and other alternatives, the operation of the PWR for 20 years is more economical than the one of new NPPs and CFPs. However, 20 years of life extension of PHWR is more economical than the CCGTs, but less economical than new NPPs and CFPs. In summary, the 20 years of life extension of the NPPs seems to be more, especially for the PWR, which is more cost effective than other generation alternatives. Therefore, the government policy of the life extension of NPPs need to be a selective approach that simultaneously considers both safety and economics rather than closing all NPPs.

Probability-Based Performance Prediction of the Nuclear Contaminated Bio-Logical Shield Concrete Walls (원전 방사화 콘크리트 차폐벽의 확률 기반 성능변화 예측)

  • Kwon, Ki-Hyon;Kim, Do-Gyeum;Lee, Ho-Jae;Seo, Eun-A;Lee, Jang-Hwa
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.7 no.4
    • /
    • pp.316-322
    • /
    • 2019
  • A probabilistic approach considering uncertainties was employed to investigate the effects on the material characteristics and strength of nuclear bio-logical shield concrete walls, when exposed to long-term radiation during the entire service life. Time-dependent compressive and tensile strengths were estimated by conducting the neutron fluence analysis. For the contaminated concrete, individual compressive and tensile failure probabilities can be possibly evaluated by not only establishing limit-state function withthe predefined critical values but also performing Monte Carlo Simulation. Nuclear power plant types similar to the Kori Unit 1, which was shut off permanently in 2017 after the 40-year operation, were herein selected for an illustrative purpose. Consequently, the probability-based performance assessment and prediction of contaminated concrete walls were well demonstrated.

Development of an Anomaly Detection Algorithm for Verification of Radionuclide Analysis Based on Artificial Intelligence in Radioactive Wastes (방사성폐기물 핵종분석 검증용 이상 탐지를 위한 인공지능 기반 알고리즘 개발)

  • Seungsoo Jang;Jang Hee Lee;Young-su Kim;Jiseok Kim;Jeen-hyeng Kwon;Song Hyun Kim
    • Journal of Radiation Industry
    • /
    • v.17 no.1
    • /
    • pp.19-32
    • /
    • 2023
  • The amount of radioactive waste is expected to dramatically increase with decommissioning of nuclear power plants such as Kori-1, the first nuclear power plant in South Korea. Accurate nuclide analysis is necessary to manage the radioactive wastes safely, but research on verification of radionuclide analysis has yet to be well established. This study aimed to develop the technology that can verify the results of radionuclide analysis based on artificial intelligence. In this study, we propose an anomaly detection algorithm for inspecting the analysis error of radionuclide. We used the data from 'Updated Scaling Factors in Low-Level Radwaste' (NP-5077) published by EPRI (Electric Power Research Institute), and resampling was performed using SMOTE (Synthetic Minority Oversampling Technique) algorithm to augment data. 149,676 augmented data with SMOTE algorithm was used to train the artificial neural networks (classification and anomaly detection networks). 324 NP-5077 report data verified the performance of networks. The anomaly detection algorithm of radionuclide analysis was divided into two modules that detect a case where radioactive waste was incorrectly classified or discriminate an abnormal data such as loss of data or incorrectly written data. The classification network was constructed using the fully connected layer, and the anomaly detection network was composed of the encoder and decoder. The latter was operated by loading the latent vector from the end layer of the classification network. This study conducted exploratory data analysis (i.e., statistics, histogram, correlation, covariance, PCA, k-mean clustering, DBSCAN). As a result of analyzing the data, it is complicated to distinguish the type of radioactive waste because data distribution overlapped each other. In spite of these complexities, our algorithm based on deep learning can distinguish abnormal data from normal data. Radionuclide analysis was verified using our anomaly detection algorithm, and meaningful results were obtained.

Technology for AR Dry Storage of Spent Fuel (원전부지내 사용후핵연료 건식저장기술 분석)

  • Lee, Heung-Young;Yoon, Suk-Jung;Lee, Ik-Hwan;Seo, Ki-Seog
    • Journal of Radiation Protection and Research
    • /
    • v.21 no.4
    • /
    • pp.313-327
    • /
    • 1996
  • As an at-reactor(AR) storage method o( spent fuel, there are horizontal concrete module type, metal storage cask type, concrete storage cask type, dual purpose (transportation and storage) cask type and multi-purpose (transportation, storage and disposal) cask type. All other types except multi-purpose one have been already used for AR dry storage of spent fuels after obtaining operation license in various foreign countries. Also the development of multi-purpose type has been continued for operation license. In America, Japan, Germany, Canada, Spain, Switzerland, and Czech Republic, etc., AR dry storage facilities are under operation or on propulsion, and spent fuels are transported to interim storage facility or reprocessing plant after dry storage at reactor temporarily. At Wolsung site, in case of Korea, concrete silo type has already been introduced, and it is believed to be inevitable to store spent fuels at reactor temporarily, considering the reality that storage capacity of spent fuel is approaching to the limit in some nuclear power plants. In this report, the system characteristics, design requirements, technical standards and status of AR storage system, which is suitable for domestic site such as Kori, have been studied. In most cases, the licensed period of storage cask is limited up to 20 years and the integrity of material and maintenance of leaktightness are required during the whole service life.

  • PDF

Study on Chemical Decontamination Process Based on Permanganic Acid-Oxalic Acid to Remove Oxide Layer Deposited in Primary System of Nuclear Power Plant (계통 내 침적된 산화막 제거를 위한 과망간산/옥살산 기반의 화학제염 공정연구)

  • Kim, Chorong;Kim, Haksoo
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.17 no.1
    • /
    • pp.15-28
    • /
    • 2019
  • In accordance with the decommissioning plan for the Kori Unit 1 NPP, the reactor coolant system will be chemically decontaminated as soon as possible after permanent shutdown. This study developed the chemical decontamination process though the development project of decontamination technology of reactor coolant system and dismantled equipment for NPP decommissioning, which has been carried out since 2014. In this study, Oxidation/reduction process was conducted using system decontamination process development equipment of lab scale and was divided into unit and continuous processes. The optimal process time was derived from the unit process, and decontamination agent and the number of process were derived through the continuous processes. Through the unit process, the oxidation process took 5 hours and the reduction process took 4 hours. As optimum decontamination agent, the oxidizing agent was $200mg{\cdot}L^{-1}$ Permanganic acid + $200mg{\cdot}L^{-1}$ Nitric acid and the reducing agent was $2000mg{\cdot}L^{-1}$ Oxalic acid. In the case of the number of processes, all oxide films were removed during the two-cycle chemical decontamination process of STS304 and SA508. In the case of Alloy600, all oxide films were removed when chemical decontamination was performed for three cycles or more.

Statistical Techniques to Detect Sensor Drifts (센서드리프트 판별을 위한 통계적 탐지기술 고찰)

  • Seo, In-Yong;Shin, Ho-Cheol;Park, Moon-Ghu;Kim, Seong-Jun
    • Journal of the Korea Society for Simulation
    • /
    • v.18 no.3
    • /
    • pp.103-112
    • /
    • 2009
  • In a nuclear power plant (NPP), periodic sensor calibrations are required to assure sensors are operating correctly. However, only a few faulty sensors are found to be calibrated. For the safe operation of an NPP and the reduction of unnecessary calibration, on-line calibration monitoring is needed. In this paper, principal component-based Auto-Associative support vector regression (PCSVR) was proposed for the sensor signal validation of the NPP. It utilizes the attractive merits of principal component analysis (PCA) for extracting predominant feature vectors and AASVR because it easily represents complicated processes that are difficult to model with analytical and mechanistic models. With the use of real plant startup data from the Kori Nuclear Power Plant Unit 3, SVR hyperparameters were optimized by the response surface methodology (RSM). Moreover the statistical techniques are integrated with PCSVR for the failure detection. The residuals between the estimated signals and the measured signals are tested by the Shewhart Control Chart, Exponentially Weighted Moving Average (EWMA), Cumulative Sum (CUSUM) and generalized likelihood ratio test (GLRT) to detect whether the sensors are failed or not. This study shows the GLRT can be a candidate for the detection of sensor drift.

Preliminary Radiation Exposure Dose Evaluation for Workers of the Landfill Disposal Facility Considering the Radiological Characteristics of Very Low Level Concrete and Metal Decommissioning Wastes (극저준위 콘크리트, 금속 해체방폐물의 방사선적 특성을 고려한 매립형 처분시설 방사선작업자 예비 피폭선량 평가)

  • Ho-Seog Dho;Ye-Seul Cho;Hyun-Goo Kang;Jae-Chul Ha
    • Journal of Radiation Industry
    • /
    • v.17 no.4
    • /
    • pp.509-518
    • /
    • 2023
  • The Kori Unit 1 nuclear power plant, which is planned to be dismantled after permanent shutdown, is expected to generate a large amount of various types of radioactive waste during the dismantling process. For the disposal of Very-low-level waste, which is expected to account for the largest amount of generation, the Korea Radioactive waste Agency (KORAD) is in the process of detailed design to build a 3-phase landfill disposal facility in Gyeongju. In addition, a large container is being developed to efficiently dispose of metal and concrete waste, which are mainly generated as Very low-level waste of decommissioning. In this study, based on the design characteristics of the 3-phase landfill disposal facility and the large container under development, radiation exposure dose evaluation was performed considering the normal and accident scenarios of radiation workers during operation. The direct exposure dose evaluation of workers during normal operation was performed using the MCNP computer program, and the internal and external exposure dose evaluation due to damage to the decommissioning waste package during a drop accident was performed based on the evaluation method of ICRP. For the assumed scenario, the exposure dose of worker was calculated to determine whether the exposure dose standards in the domestic nuclear safety act were satisfied. As a result of the evaluation, it was confirmed that the result was quite low, and the result that satisfied the standard limit was confirmed, and the radiational disposal suitability for the 3-phase landfill disposal facility of the large container for dismantled radioactive waste, which is currently under development, was confirmed.

A Radionuclides Suite Selection for Site Characterization and Final Status Survey in the U.S. NPPs (미국의 원전 해체관련 부지특성 및 최종상태 조사를 위한 방사성 오염 핵종 결정 방법에 대한 분석)

  • Zhao, Pengfei;Jeon, Yeo Ryeong;Kim, Yongmin;Lee, Jong Seh;Ahn, Seokyoung
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.14 no.3
    • /
    • pp.267-277
    • /
    • 2016
  • For the decommissioning of a nuclear power plant, a site characterization and final status survey require a site-specific suite of radionuclides that could potentially still be present in the site during or after the decontamination processes. The United States Nuclear Regulatory Commission (U.S. NRC) requires a Decommissioning Technical Base Document (DTBD) along with a Site Characterization and Historical Site Assessment (HSA) from the utility for decommissioning to proceed. Both the DTBD and HSA are preliminary components of the Radiological Site Survey investigation process and should be included in the final License Termination Plan (LTP) for site release and reuse consideration from the U.S. NRC and the utility company. This study reviews the United States Nuclear Power Plants (U.S. NPPs) decommissioning cases and is especially focused on the methodologies used for determining a site-specific suite of radionuclides before and during the site characterization and final status surveys. In 2017, Kori-1 will be ready for decommissioning and related preparations are ongoing, this review will help Korea to prepare regulatory guidelines and give technical background for the safe and successful decommissioning of NPPs.

A Pre-Study on the Estimation of NPP Decommissioning Radioactive Waste and Disposal costs for Applying New Classification Criteria (신 분류기준을 적용하기 위한 원전 해체폐기물량 및 처분 비용 산정에 대한 사전 연구)

  • Song, Jong Soon;Kim, Young-Guk;Lee, Sang-Heon
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.13 no.1
    • /
    • pp.45-53
    • /
    • 2015
  • Since the commercial operation of Kori Unit #1 nuclear power plant(NPP) started in 1978, 23 units at present are operating in Korea. Radioactive wastes will be steadily generated from these units and accumulated. In addition, the life-extension of NPPs, construction of new NPPs and decontamination and decommissioning research facilities will cause radioactive wastes to increase. Recently, Korea has revised the new classification criteria as was proposed by IAEA. According to the revised classification criteria, low-level, very-low-level and exempt waste are estimated to about 98% of total disposal amount. In this paper, current status of overseas cases and disposal method with new classification criteria are analyzed to propose the most reasonable method for estimating the amount of decommissioning waste when applying the new criteria.