• Title/Summary/Keyword: The Fixed Charge Transportation Problem

Search Result 11, Processing Time 0.014 seconds

The Introduction of Railroad Pass for One Day in Seoul Metro (서울메트로 1일 승차권 도입 방안 연구)

  • Lee, Dong-Wook;Lee, Tai-Sik;Ryu, Jong-Won;Chung, Chul
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1221-1226
    • /
    • 2007
  • The subway with the initial constructive expense which is enormous together is the public transportation means where the many expense is expended in the operation and maintenance civil official. Seoul Metro until initial opening to traffic after present time cannot escape every year deficit to be, the cause is a possibility of seeking from the fare system which is short in transportation prime cost. Currently Seoul Metro is operating with the distance proportional fare system the passenger ticket system which is simple (usual volume, group volume and fixed amount volume, affection renunciation, charge free volume). When the biased characteristic of the user it plans considering from the goods development side for the variety for and a deficit solution, against the fare system systematic it researches and solution plan politically. Financial of the subway operation agency young the investigation against the present condition of the hazard subway fare system which is solved the bud with problem point a fare system from the research which it sees consequently and improvement program under analyzing the man with underdeveloped genital organ. Base on the reporter to analyze the introduction plan which with the character which will reach it follows with the necessity of introduction of the 1st passenger ticket (24 hour volume).

  • PDF