• Title/Summary/Keyword: Test-system Design

Search Result 5,853, Processing Time 0.033 seconds

Development of Propulsion Subsystem for KOMPSAST (다목적 실용위성의 추진시스템 개발)

  • 최진철;윤효철
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.2 no.3
    • /
    • pp.80-89
    • /
    • 1998
  • Propulsion subsystem transfers KOMPSAT into mission orbit and controls its attitude. Design factor consists of structure safety, electrical circuit design, consumable power estimation of thermal hardwares, damping device design of fuel transient pressure, and system configuration design by considering plume effect from thruster firing. System level analysis should be performed for verification of system design under launch vehicle and orbital environment. Electrical functional test of thermal control hardware, proof pressure test, cleanliness verification test, and internal/external leakage test of fuel feeding system should be carried out for performance estimation of propulsion system. Design and assembly process of propulsion subsystem was depicted and reliability of system was verified by test analysis in this paper.

  • PDF

Full Scale Airframe Static Test of 4 Seater Canard Airplane (4인승 선미익 경항공기 전기체 정적 구조시험)

  • Shin, Jeong-Woo;Kim, Sung-Chan;Kim, Sung-Jun;Chae, Dong-Chul;Lee, Sang-Wook;Kim, Tae-Uk;Shim, Jae-Yeul
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.9 no.4
    • /
    • pp.15-23
    • /
    • 2006
  • In this paper, full-scale airframe static test of 4-seater canard airplane(the Firefly) was explained. From the results of the structural analysis, 5 design limit loads test conditions and 11 design ultimate loads test conditions were selected. Test loads analysis was performed and test fixtures and load control system(LCS) were prepared to realize the test loads. To protect the test article during the test, the overload protection system was prepared. Strain and deflection values were acquired through the data acquisition system(DAS) to verify the structural analysis results.

A Study of Temperature Predictions for Manual Transmission Clutch System via Anti-fade and Hill Start Virtual Test (내페이드와 힐스타트 가상 시험을 통한 수동변속기 클러치 시스템의 온도 예측에 관한 연구)

  • Park, Ki-Jong;Kim, Dong-Won
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.23 no.1
    • /
    • pp.122-129
    • /
    • 2015
  • Excessive overheating to a manual transmission clutch system under operating conditions can be considered the main reason of its performance degradation. The clutch system has to be ensured with its service life by showing that it passes the extreme tests called anti-fade test and hill start test in a certain design step. In general, design feedbacks from these kinds of the experiments are adapted to the system to enhance its performance. However, it usually takes much time and costs a lot due to the repetition of the tests. In this research, a process to calculate temperature of the clutch system was developed to determine whether the design can be passed the anti-fade test and hill start test in the design phase. The process incorporates many CAE techniques such as heat transfer analysis using 1D dynamic simulation method, system dynamics, CFD and parametric optimization. CFD is utilized to analyze 3-dimensional heat transfer of the clutch system and fluid dynamics of air in the clutch housing. The process was applied for the clutch systems in several vehicle models. The results was compared with those of the experiment. The applicability of the developed process was verified by comparing the predicted results with experimental results.

A Study on the Design and Performance Test of Side Thruster (사이드 스러스터 설계 및 성능평가에 관한 연구)

  • Kim, Hyeong-Min;Kim, Lae-Sung;Cho, Sung-Hyun;Lyu, Sung-Ki
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.16 no.2
    • /
    • pp.1-6
    • /
    • 2017
  • In this paper, we present a study concerning the design of a 400 N class side thruster for small ships. The side thrusters used in Korea are imported from abroad. The performance and durability of the imported products employed in Korea are not adequate, therefore the side thrusters which will be suitable for Korean domestic needs to be re-designed. The strength calculation of the side thruster was performed by KS standard. Strength calculation and design were made to meet design requirements. Structural analysis and safety factor analysis were carried out to confirm the validity of strength calculations and design. After manufacturing the bevel gear, a back lash test was conducted. We also conducted a no-load test, a rated load, and an overload test for a performance test and a durability test of the design while satisfying the design conditions.

Design of aeroload simulator for the test of guided missile servoactuation system (유도무기 구동장치의 동특성 실험을 위한 공력부하 시뮬레이타의 설계)

  • 이성래;구자용;문의준
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1990.10a
    • /
    • pp.475-480
    • /
    • 1990
  • A design of aeroload simulator is proposed which is used for the dynamic test of guided missile servoactuation system. Since the simulator is linked to the servoactuation system, it is a two-input one-output system. The mathematical model of the aeroload simulator is derived and the root-locus method is applied to design compensator to improve the stability, response speed and accuracy of the system. Computer simulations are done to verify the goodness of the system design.

  • PDF

Static Test and Analysis of Wing Support Structure for External Stores (외부장착물지지 주익구조 정적 시험 및 해석)

  • Uhm, Wonseop;Yoon, Jongmin
    • Journal of Aerospace System Engineering
    • /
    • v.9 no.1
    • /
    • pp.28-34
    • /
    • 2015
  • Armed aircraft of a basic trainer class installs external stores under wing box by using pylon and performs an operation such as weapon delivery and jettison, and should be designed to withstand all kinds of loads applied to external stores. The static strength test of pylons and wing box was performed to assess the static strength of pylon and their support structures for substantiation. Based on the test, the structures were verified to fully satisfy a given design requirement. In this paper, methods of test load generation of wing box and pylon, evaluation of test result data and design result of test set-up were presented. Comparing the FEM analysis with the same test data can lead to good match and reasonable deviation between both. Finally, based on the test and the analysis, the static strength of test article was substantiated and the reliability and effectiveness of analysis math model were obtained.

A Study on the Development of Traction Motor for Electric Railway: Insulation System Design & Performance Test

  • Wang, Jong-Bae
    • Transactions on Electrical and Electronic Materials
    • /
    • v.2 no.4
    • /
    • pp.19-23
    • /
    • 2001
  • In this paper, design considerations and manufacturing procedure of 200 class insulation system with polyimide(Kapton) main insulation and silicone resin VPI process on the traction motor thor EMU will be reviewed. The performance test and the long life evaluation test that prove stability and reliability of Insulation system for traction motor will also be introduced.

  • PDF

Improvements in Design and Evaluation of Built-In-Test System (무기체계 정비성 향상을 위한 BIT 설계 및 검증 방안)

  • Heo, Wan-Ok;Park, Eun-Shim;Yoon, Jung-Hwan
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.15 no.2
    • /
    • pp.111-120
    • /
    • 2012
  • Built-In-Test is a design feature in more and more advanced weapon system. During development test and evaluation(DT&E) it is critical that the BIT system be evaluated. The BIT system is an integral part of the weapon system and subsystem. Built-In-Test assists in conducting on system and subsystem failure detection and isolation to the Line Replaceable Unit(LRU). This capability reduces the need for highly skilled personnel and special test equipment at organizational level, and reduces maintenance down-time of system by shortening Total Corrective Maintenance Time. During DT&E of weapon system the objective of BIT system evaluation is to determine BIT capabilities achieved and to identify deficiencies in the BIT system. As a result corrective actions are implemented while the system is still in development. Through the use of the reiterative BIT evaluation the BIT system design was corrected, improved, or updated, as the BIT system matured.

Tele-test Systems for ASIC Design (ASIC 설계를 위한 원격 테스트 시스템)

  • 윤도현;강성호
    • Proceedings of the IEEK Conference
    • /
    • 1999.11a
    • /
    • pp.939-942
    • /
    • 1999
  • In this paper, Tele-Test System for ASIC Design is constructed. It consists of the server, and the clients. The server and clients are implemented by Java. Using Java RMI system, the remote access via information network is implemented. In this Tele-test system, fault simulation, test pattern compaction, test pattern generation, and path-delay fault test generation services are implemented. All service can be peformed parallel by network access.

  • PDF

A Study on the Test and Evaluation Process Development for Korea Next Generation Highspeed Electric Multiple Unit (차세대 고속열차 시험평가 프로세스에 관한 연구)

  • Lee, Tae-Hyung;Kim, Sang-Soo;Kim, Seog-Won;Kim, Ki-Hwan;Chung, Heung-Chai
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.7 no.2
    • /
    • pp.7-11
    • /
    • 2011
  • A high-speed railway system represents a typical example of large-scale multi-disciplinary system, consisting of subsystems such as rolling-stock, electrical hardware, electronics, control, information, communication, civil technology etc. The system design and acquisition data of the large-scale system must be the subject under strict configuration control and management. Systems engineering technology development project for Korea next generation High-speed Electric Multiple Unit (HEMU) system in progress is a national large system development project that is not only a large-size and complex but also multi-disciplinary in nature. Therefore, all stakeholders must understand and share the functional and performance requirements of HEMU throughout its life-cycle phases. Also in the test and evaluation phase, all systems requirements must be verified. In 2011, the prototype train manufacturing will be completed. It will do test run on the commercial line and all systems requirements are verified until 2012. For the system verification, the test and evaluation process have to be established before the test trial run. Using a systems engineering tool, the system design database(SDD) with requirements traceability and development process management in the course of the development have to be established. This paper represents the test and evaluation process development based on the SEMP(Systems Engineering Management Plan) developed in the design stage. The test and evaluation process is refined and updated in comparison to the design stage one. The test and evaluation process consists of procedure, test and evaluation method and schedule. So through this process, it is defined that each systems requirements is verified on which test and about what time.