• Title/Summary/Keyword: Test Design

Search Result 20,358, Processing Time 0.044 seconds

Structural Design of Polyethylene Boat Hull by using Longitudinal Bending Strength Test Method (종굽힘강도시험방법을 이용한 폴리에틸렌 보트 선체의 구조 설계)

  • Cho, Seok-Swoo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.12
    • /
    • pp.8447-8454
    • /
    • 2015
  • ISO 12215-5 standard describes allowable stress design specifications of monohull small boat with a length of hull between 2.5 m and 24 m constructed from fiber reinforced plastics, aluminium or steel alloys, glued wood or other suitable boat building material. If small boat hull is under 2.5m in overall length or nonstandard material is used as boat building material, structural reliability of small boat hull is assured by drop test specification, but not by structural design specification in accordance with ISO 12215-5. Drop test specification of boat hull can be applied to manufactured product. But it is difficult and complicated to apply drop test specification to structural design of boat hull. In this study, we present structural design method of polyethylene boat hull on the basis of longitudinal bending strength test specification.

Impedance design of tap changing auto transformer based LVRT/HVRT test device (탭 변환 단권변압기 기반 LVRT/HVRT 시험장비의 임피던스 설계)

  • Baek, Seung-Hyuk;Kim, Dong-Uk;Yoon, Young-Doo;Kim, Sungmin
    • Journal of IKEEE
    • /
    • v.24 no.1
    • /
    • pp.216-224
    • /
    • 2020
  • This paper proposes an impedance design method of the test device for evaluating Low Voltage Ride Through(LVRT) and High Voltage Ride Through(HVRT) functions. The LVRT/HVRT test device should have ability to generate the fault voltage specified in the grid code for a certain period and to limit the magnitude of the fault current with the design specification. In this paper, the impedance design method for auto transformer is proposed based on a equivalent model of a tap-change auto-transformer during LVRT/HVRT operation. In addition, to generate various fault voltages required the LVRT/HVRT test, tap impedance design in the auto transformer is considered. To verify the validity of the proposed design method, the design process of the 10MVA LVRT/HVRT test device was conducted and the design results was verified through simulation models.

A Study on the Static Test of Rudder Control System for a Basic Trainer (기본훈련기 방향타 조종장치 정적하중 시험에 관한 연구)

  • Jeon, Chan-Won;Lee, Su-Yong;Gang, Gyu-Seop
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.30 no.2
    • /
    • pp.115-121
    • /
    • 2002
  • This report summarized the static test of the rudder system for the KTX-1 basic trainer. The test loads are applied up to the limit and ultimate loads in a stepping sequence. Test loads and test results matt the strength and stiffness requirements of the rudder control system.. Using #004 full scale structure test airframe.

Comparision Analysis of Model Test for Prediction of Uplift Resistance in the Reclaimed Land Greenhouse Foundation (간척지 온실기초 나무말뚝의 인발저항력 예측을 위한 실내모형시험 결과 비교·분석)

  • Song, Chang Seob;Kim, Myeong Hwan;Jang, Ung Hee
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.58 no.2
    • /
    • pp.45-52
    • /
    • 2016
  • The object of this paper was to evaulate modified proposed design equation in model test result in order to estimate uplift-resistance of timber pile of reclaimed land greenhouse foundation. Uplift resistance result of model test was increased to according to increased of contact area. Uplift-resistance result of field test tend to lineary increased to according to increased of embedment depth and contact area. Results of field uplift-resistance was evaluate compare with modified proposed design equation results of model test and Effective stress method. As the Effective stress method tend to underestimate, modified proposed design equation results of model test tend to similar type. As the contact area increase, difference between field uplift-resistance results and modified proposed design equation results of model test was considered uplift-speed.

Flight Control System Design and Verification Process (비행제어시스템 설계 및 검증 절차)

  • Kim, Chong-Sup
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.14 no.8
    • /
    • pp.824-836
    • /
    • 2008
  • Relaxed static stability(RSS) concept has been applied to improve aerodynamic performance of modern version supersonic jet fighter aircraft. Therefore, flight control systems are necessary to stabilize an unstable aircraft, and provides adequate handling qualities and achieve performance enhancements. Standard FCSDVP (Flight Control System Design and Verification Process) is provided to reduce development period of the flight control system. In addition, if this process is employed in developing flight control system, it reduces the trial and error for development and verification of flight control system. This paper addresses the flight control system design and verification process for the RSS aircraft utilizing design goal based on military specifications, linear and nonlinear system design and verification based on universal software, handling quality test based on HILS(Hardware In-the-Loop Simulator) environment, and ground and flight test results to verify aircraft dynamic flight responses.

AERODYNAMIC DESIGN OF A MULTI-FUNCTION AIR DATA SENSOR BY USING CFD AND WIND TUNNEL TEST (전산해석 및 풍동시험을 이용한 다기능 대기 자료 센서의 공력 설계)

  • Park, Y.M.;Choi, I.H.;Lee, Y.G.;Kwon, K.J.;Kim, S.C.;Hwang, I.H.
    • Journal of computational fluids engineering
    • /
    • v.15 no.3
    • /
    • pp.32-38
    • /
    • 2010
  • Aerodynamic design of the vane type multi-function probe was tried by using CFD and wind tunnel test for the MALE UAV and small business jets. The present multi-function probe can measure total pressure, static pressure and angle of attack by using rotating vane. Therefore, major performances are determined by aerodynamic characteristics of vane. In order to design the sensor compatible to the requirement, aerodynamic characteristics of sensors were investigated by using CFD and dynamic response analysis was also performed for transient performance. The final aerodynamic performance was measured by the wind tunnel test at Aerosonic and the results were compared with the present design. The results showed that the aerodynamic design using the CFD can be successfully used for the design of vane type multi-function air data sensor.

Integration, Verification, Qualification Activities for KASS System (KASS 시스템 통합 및 검증 활동)

  • Hwanho Jeong;Minhyuk Son;ByungSeok Lee
    • Journal of Advanced Navigation Technology
    • /
    • v.27 no.6
    • /
    • pp.782-787
    • /
    • 2023
  • Korea augmentation satellite system (KASS) integration, verification, qualification (IVQ) activity is verification of requirements for KASS system and its sub-system that were performed based on the inspection, analysis, review of design, test (IART) method from factory acceptance test (FAT) to test readiness review (TRR) after critical design review (CDR) was closed. In the FAT phase, developed equipment was installed on the test platform and we were verified interfaces between sub-systems and coupling test with the kass control station (KCS). In the site aceeptance test (SAT) phase, on-site verification was conducted by installing equipment verified by FAT such as kass reference station (KRS), kass processing station (KPS), kass uplink station (KUS), KCS. However, considering the developed plan and status, SAT was divided into 3 phases and coupling test was performed. In the TRR phase, the KASS system verification was performed through FAT's test list and additional test list using the satellite based augmentation system (SBAS) broadcast signal from geostationary earth orbit (GEO) 1.

Study of the Curing Time of Cementless Cold Central Plant Recycled Asphalt Base-Layer through Field-Application Review (무시멘트 상온 재활용 아스팔트 기층의 현장 적용성을 통한 양생기간에 관한 연구)

  • Choi, Jun Seong;Jung, Chul Ho;Lee, Chan Hee;Lim, in su
    • International Journal of Highway Engineering
    • /
    • v.19 no.2
    • /
    • pp.67-74
    • /
    • 2017
  • PURPOSES : The objective of this study is to ascertain the curing period of cementless cold central plant recycled asphalt base-layer, using mechanical analyses and specimen quality tests on the field. METHODS : Cold central plant recycled asphalt base-layer mixture was produced in the plant from reclaimed asphalt, natural aggregate, filler for the cold mix, and the modified emulsion AP using asphalt mix design and plant mix design. In order to examine the applicability of the curing period during the field test, the international standards for the possibility of core extraction and the degree of compaction and LFWD deflection were analyzed. Moreover, Marshall stability test, porosity test, and indirect tensile strength test were performed on the specimens of asphalt mix and plant mix design. RESULTS : The plant production process and compaction method of cementless cold central plant recycled asphalt base-layer were established, and the applicability of the optical moisture content for producing the mixture was verified through the field test. In addition, it was determined that the core extraction method of the conventional international curing standard was insufficient to ensure performance, and the LFWD test demonstrated that the deflection converges after a two-day curing. However, the back-calculation analysis reveals that a three-day curing is satisfactory, resulting in a general level of performance of dense asphalt base-layer. Moreover, from the result of the specimen quality test of the asphalt mix design and plant mix design according to the curing period, it was determined that the qualities satisfied both domestic and international standards, after a two-day curing. However, it was determined that the strength and stiffness after three-day curing are higher than those after a two-day curing by approximately 3.5 % and 20 %, respectively. CONCLUSIONS:A three-day curing period is proposed for the cementless cold central plant recycled asphalt base-layer; this curing period can be demonstrated to retain the modulus of asphalt-base layer in the field and ensure stable quality characteristics.

Design and testing of the KC-100 Spin Recovery Parachute System (SRPS)

  • Lee, Dong-Hun;Nho, Byung-Chan;Kang, Myung-Kag;Kang, Kyung-Woo;Lee, Ju-Ha;Kim, Su-Min;Kwon, Young-Suk
    • International Journal of Aeronautical and Space Sciences
    • /
    • v.13 no.1
    • /
    • pp.117-125
    • /
    • 2012
  • This paper presented the design of SRPS, ground function test, and the deployment test on a high speed taxi of KC-100 airplane. KAI has developed a spin recovery system in collaboration with Airborne Systems for KC-100 general aviation airplane. Spin mode analysis, rotary balance and forced oscillation tests were performed to obtain the rotational, dynamic derivatives in the preliminary design phase. Prior to the detailed design process of SRPS, approximations for initial estimation of design parameters- fineness ratio, parachute porosity, parachute canopy filling time, and deployment method- were considered. They were done based on the analytical disciplines such as aerodynamics, structures, and stability & control. SRPS consists of parachute, tractor rocket assembly for deployment, attach release mechanism (ARM) and cockpit control system. Before the installation of SRPS in KC-100 airplane, all the control functions of this system were demonstrated by using SBTB(System Breakout Test Box) in the laboratory. SBTB was used to confirm if it can detect faults, and simulate the firing of pyrotechnic devices that control the deployment and jettison of SRPS. Once confirmed normal operation of SRPS, deployment and jettison of parachute on the high speed taxiing were performed.

Improvement of the Automobile Control Software Testing Process Using a Test Maturity Model

  • Jang, Jin-Wook
    • Journal of Information Processing Systems
    • /
    • v.14 no.3
    • /
    • pp.607-620
    • /
    • 2018
  • The problem surrounding methods of implementing the software testing process has come under the spotlight in recent times. However, as compliance with the software testing process does not necessarily bring with it immediate economic benefits, IT companies need to pursue more aggressive efforts to improve the process, and the software industry needs to makes every effort to improve the software testing process by evaluating the Test Maturity Model integration (TMMi). Furthermore, as the software test process is only at the initial level, high-quality software cannot be guaranteed. This paper applies TMMi model to Automobile control software testing process, including test policy and strategy, test planning, test monitoring and control, test design and execution, and test environment goal. The results suggest improvement of the automobile control software testing process based on Test maturity model. As a result, this study suggest IT organization's test process improve method.