• Title/Summary/Keyword: Test Cost

Search Result 3,991, Processing Time 0.033 seconds

Comparative Performance Analysis of Robot-based Automated Construction System Using a Real Scale Test Project

  • Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.3
    • /
    • pp.339-349
    • /
    • 2015
  • A large-scale research project to develop a robot-based automated building construction system for steel structures was successfully conducted in South Korea. This paper discusses the results of the real-scale test and the key lessons gained from the testing process. The system was assessed in terms of system productivity, construction cost, quality control, and safety improvements. While the productivity of the automated system showed an improvement of about 9.5%, the construction cost was about six times higher than that of the conventional method. The field test also indicated that the automated system requires more on-site quality control measures. However, because the system can eliminate the causes of various safety accidents, safety levels might be expected to be improved significantly. It is expected that this paper will provide knowledge and insight for developing new systems, and the results of the real-scale test might be useful for other researchers and similar research projects in the future.

A Suggestion of Penalty Cost Appropriation Methodology for Performance Acceptance Test of CGAM Cogeneration - Part I (CGAM 열병합발전의 인수성능에 대한 페널티 비용 책정 방법론 제안 - Part I)

  • Kim, Deok-Jin
    • Plant Journal
    • /
    • v.12 no.2
    • /
    • pp.36-40
    • /
    • 2016
  • At the contract for power plant construction, the penalty appropriation on performance decrease is signed between ordering organization and construction firm. In this, the penalty cost signed must be reasonable value that both of ordering organization and construction firm can accept, therefore the methodology for penalty appropriation is very important. Cogeneration is a system that produces electricity and heat at the same time, therefore the penalty appropriation for cogeneration should be uncertain. Thermoeconomics analyzes various energy costs, however the relation of thermoeconomics and penalty cost may not be analyzed up to now. The aim of this study demonstrates that thermoeconomics can be applied to the penalty appropriation at the performance acceptance test. As the result of CGAM system, if the construction cost is $10,000,000, the value of $6,665,688 was appropriated to the electricity production performance and the value of $3,334,312 was appropriated to the heat production performance. Therefore if one percentage at the electricity production performance decreases, the penalty is $6,666, and one percentage at the heat production performance decrease, we can understand that the penalty is $3,334.

  • PDF

Analysis of the Impact of Construction Planning Tasks on Project Cost and Schedule Success in Residential Projects (공동주택 설비공사 계획업무의 성과지표에 미치는 영향분석)

  • Kim, Dae Young;Lim, Hyoungchul;Kim, Daeyoung;Huh, Youngki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.31-38
    • /
    • 2019
  • The main purpose of this study is to analyze the impact of the cost estimates on the construction work in residential apartment housing facilities. The planning work of facility construction is roughly divided into five main tasks which are further broken down into the following: process plan (P1-P6), construction plan (C1-C5), environmental management plan (E1-E4), quality management plan (Q1-Q5) and the safety management plan (S1-S5). In this study these tasks were classified into 25 detailed planning duties and a statistical analysis was performed on each one to determine its impact on cost. Finally this study derives from major planning tasks for effective cost management through correlation between planning tasks, cost indicators and t-test.

Mechanical Characteristic Analysis of Fiber Reinforced Strip Form Elastomeric Bearing by Experiment (스트립형 섬유 보강 탄성받침의 실험에 의한 기계적 특성해석)

  • 강경주;문병영;강범수;김계수;박진삼
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.6 no.6
    • /
    • pp.1-6
    • /
    • 2002
  • In order to apply seismic isolators to low-cost buildings, seismic isolators have to be low-cost and light. In this paper fiber reinforced strip form isolator in which the steel plates of conventional rubber bearing were replaced by fiber was proposed. The proposed fiber reinforced strip form isolator was designed, fabricated, cut and subjected to vertical test and horizontal test. Therefore, fiber reinforced strip form isolator was to be shown valid in the view point of fabrication and application to desired size. The horizontal test and vertical test have shown that fiber reinforce strip form isolator could be replaced the rubber isolator. By these results, low-cost and light seismic isolator can be applied to the low-cost building.

Design of Navigation System for Low Cost Unmanned Aerial Vehicle (저가형 무인항공기 운용을 위한 항법시스템 설계)

  • Lee, Jang-Ho;Kim, Sung-Pil;Park, Mu-Hyeok;Ahn, Iee-Ki
    • Journal of Advanced Navigation Technology
    • /
    • v.8 no.2
    • /
    • pp.105-111
    • /
    • 2004
  • This paper describes the design of navigation system for an unmanned target drone which is operated by Korean army as for anti-air gun shooting training. Current target drone is operated by pilot control of on-board servo motor via remote control system. Automatic flight control system for the target drone greatly reduces work load of ground pilot and can increase application area of the drone. Most UAVs being operated nowdays use high-priced sensors as AHRS and IMU to measure the attitude, but those are costly. This paper introduces the development of low-cost automatic flight control system with low-cost sensors. The integrated automatic flight control system has been developed by integrating combining power module, switching module, monitoring module and RC receiver as an one module. The performance of navigation for low cost unmanned aerial vehicle, unmanned target drone as our test bed in this paper is verified by both Hardware in the loop simulation(HILS) to test performance of GPS as GPS output frequency high and results of flight test.

  • PDF

Development of Automatic flight Control System for Low Cost Unmanned Aerial Vehicle (저가형 무인 항공기의 자동비행시스템 개발)

  • Yoo, Hyuk;Lee, Jang-Ho;Kim, Jae-Eun;An, Yi-Ki
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.10 no.2
    • /
    • pp.131-138
    • /
    • 2004
  • Automatic flight control system (AFCS) for a low-cost unmanned aerial vehicle is described in this paper. Development process and block diagram of the AFCS are introduced. The flight control law for longitudinal and lateral channel autopilot is designed using optimization process. In this procedure, the performance index is composed of desired location of closed loop system poles and H$_2$norm of the resultant flight control system. This procedure is applied to the autopilot design of an unmanned target vehicle. Performance of the AFCS is evaluated by processor-in-the-loop simulation test and flight test. These results show that the AFCS has acceptable performance fur low cost UAV.

Development of Low-Cost Automatic Flight Control System for Unmanned Target Drone

  • Lee, Jang-Ho;Ryu, Hyeok;Kim, Jae-Eun;Ahn, Iee-Ki
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2004.08a
    • /
    • pp.367-371
    • /
    • 2004
  • This paper describes development of automatic flight control system for an unmanned target drone which is operated by Korean army as for anti-air gun shooting training. Current target drone is operated by pilot control of on-board servo motor via remote control system. Automatic flight control system for the target drone greatly reduces work load of ground pilot and can increase application area of the drone. Most UAVs being operated now days use high-priced sensors as AHRS and IMU to measure the attitude, but those are costly. This paper introduces the development of low-cost automatic flight control system with low-cost sensors. The integrated automatic flight control system has been developed by integrating combining power module, switching module, monitoring module and RC receiver as an one module. The performance of automatic flight control system is verified by flight test.

  • PDF

Laboratory Test on Total Flow Control for Ice Slurry System with Inverter Fed Motor Pump (인버터구동 모터펌프를 이용한 아이스 슬러리형 빙축열시스템 전유량제어 운전시험)

  • Choi, Byoung-Youn;Lee, Kyoung-Ho;Lee, Sang-Ryoul;Lee, Hak-Joo
    • Proceedings of the KSME Conference
    • /
    • 2001.06d
    • /
    • pp.260-265
    • /
    • 2001
  • This paper describes total flow control of an ice slurry system for pump energy saving. Similar turbo machinery has a characteristic that input power ratio is proportional to the three time of revolution speed ratio. To reduce the energy cost of brine pump in ice slurry storage systems, inverter is adapted instead of 3-way valve to control the speed of brine pump motor. One type of cooling load profile was used as driving load of the system, generated by a boiler and warm water storage tank. As results of the laboratory test, energy consumption and cost of the pump were reduced by 11.4%.

  • PDF

A Heuristic Method for Ordering in the Dynamic Inventory System with Quantity Discounts (가격할인이 있는 단일품목 동적 재고모델의 발주정책을 위한 발견적 기법)

  • Lee, Yeong-Jo;Gang, Maeng-Gyu
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.12 no.2
    • /
    • pp.77-87
    • /
    • 1986
  • This paper presents a heuristic method for solving the discrete-time ordering problem with quantity discounts and deterministic, time-varying demand. This algorithm utilizes a variation of the incremental cost approach(ICA) to determine a near optimal solution. The ICA is the method which reduces the total cost with reduction of the number of orders by one. In order to reduce the number of orders, if the incremental cost for one of the periods is negative, the demand of the period should be purchased in its immediate preceding period. In order to test the performance of this algorithm, an experiment is conducted that involves a large number of test problems covering a wide variety of situations. The result of the experiment shows that the proposed algorithm has 80.5% better solutions than the adjusted part period algorithm(APPA), which is known to be the best heuristic method.

  • PDF

A Study on Software Reliability Evaluation Using SRGM (SRGM을 이용한 소프트웨어 신뢰도 평가에 관한 연구)

  • 신경애
    • Journal of the Korea Computer Industry Society
    • /
    • v.4 no.4
    • /
    • pp.553-560
    • /
    • 2003
  • Can presume number of software failure or remaining fault that is expected with test data that is collected by decided time using SRGM that is studied until present. Therefore, can forecast software reliability achievement degree and software reliability use step. But, reliability evaluation according to if choose any model can change. Therefore, we present SRGM that consider test cost to error detection and error delete cost as SRGM that consider error delete cost in this research. Using this SRGM, can presume number of remaining fault in software, reliability and optimal release time.

  • PDF