Survey and Improvement Scheme for Safety Certification System of Temporary Equipment and Materials (가설기자재 관련 안전인증제도 실태조사 및 개선방안)

  • Won, Bang-Hee;Yoon, Kyeong-Won;Jeon, Sang-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.7
    • /
    • pp.92-102
    • /
    • 2016
  • In this study, the systems and standards for temporary equipment and materials established in domestic and foreign countries are examined to provide improvement schemes and to insure their safety. Statistical analyses of the data obtained from the internet and/or field visit surveys of employees working in manufacturing, leasing, and construction companies related to temporary equipment and materials and improvement schemes were conducted to evaluate the implementation of a safety certification system for currently used temporary equipment and materials. This safety certification system has been enforced since 2009, but the number of accidents at construction sites, which are reported by the 'serious accident cases and measures in construction sites' group of the Korea Occupational Safety & Health Agency (KOSHA), has increased. The respondents' answers regarding the suitability of the items, which are required for the safety certification of the equipment and materials, were 'yes (36%)', 'no (30%)', and 'unknown (35%)'. Less than half of the answers regarding the current system were positive and most of the respondents answered that the current system does not reflect the evolution of the construction environment. A system is needed to approve items certified in foreign countries and newly developed materials and items, in addition to the (automatic) registration for the reuse of temporary equipment and materials, and improvements are needed in their safety. In this study, after examining the size and practicability of the items requiring approval from the current system, the certification methods are reevaluated and improvement schemes are provided for the system.

Damage Detection and Damage Quantification of Temporary works Equipment based on Explainable Artificial Intelligence (XAI)

  • Cheolhee Lee;Taehoe Koo;Namwook Park;Nakhoon Lim
    • Journal of Internet Computing and Services
    • /
    • v.25 no.2
    • /
    • pp.11-19
    • /
    • 2024
  • This paper was studied abouta technology for detecting damage to temporary works equipment used in construction sites with explainable artificial intelligence (XAI). Temporary works equipment is mostly composed of steel or aluminum, and it is reused several times due to the characters of the materials in temporary works equipment. However, it sometimes causes accidents at construction sites by using low or decreased quality of temporary works equipment because the regulation and restriction of reuse in them is not strict. Currently, safety rules such as related government laws, standards, and regulations for quality control of temporary works equipment have not been established. Additionally, the inspection results were often different according to the inspector's level of training. To overcome these limitations, a method based with AI and image processing technology was developed. In addition, it was devised by applying explainableartificial intelligence (XAI) technology so that the inspector makes more exact decision with resultsin damage detect with image analysis by the XAI which is a developed AI model for analysis of temporary works equipment. In the experiments, temporary works equipment was photographed with a 4k-quality camera, and the learned artificial intelligence model was trained with 610 labelingdata, and the accuracy was tested by analyzing the image recording data of temporary works equipment. As a result, the accuracy of damage detect by the XAI was 95.0% for the training dataset, 92.0% for the validation dataset, and 90.0% for the test dataset. This was shown aboutthe reliability of the performance of the developed artificial intelligence. It was verified for usability of explainable artificial intelligence to detect damage in temporary works equipment by the experiments. However, to improve the level of commercial software, the XAI need to be trained more by real data set and the ability to detect damage has to be kept or increased when the real data set is applied.

A Comparative Study on Domestic and Foreign the Follow-up Service of Temporary Equipment and Materials (국내외 가설기자재 사후관리제도 비교 연구)

  • Woo Kwang-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.1 s.9
    • /
    • pp.74-82
    • /
    • 2002
  • The performance testing system of temporary construction equipment and materials are a previous inspect institution to produce only goods beyond the limited-performance, be certificated through a previous test, the purpose of which is to prevent an illegal goods from spreading abroad. The formal certification not only pass the test in an ordinary means but also isn't the term of validity on a certificated goods. Because of the above two reasons, an accident doesn't reduce, and a illegal goods become to be circulated. So, in this study, we analysis the problem of the follow-up service based on the formal certification and we suggest the improvement through comparative study on the follow-up of domestic and foreign.

A Study on the Analysis of Current Situation and the Deduction of Improvement Measure Regarding the Scaffolding and the Related Components at Construction Site (건설 현장 가설기자재 운영현황 분석 및 개선 방안 도출 연구)

  • Jeong, Jin Woo;Kim, Yong Gon
    • Journal of the Korean Society of Safety
    • /
    • v.34 no.5
    • /
    • pp.63-71
    • /
    • 2019
  • Work Guideline of Construction Quality Management was revised in July 2017, and it has changed the perception of scaffolding in South Korea. The on site investigation and survey was performed on manufacturers, leasing companies, and quality inspection agencies regarding the compliance with the guideline for the scaffolding and the related components brought to the site. Moreover, the related guidelines and identified unsatisfactory quality management items were analyzed by each subject. As a result, the major factors that cause the problems were reasonably deducted. The related regulations to prohibit the delivery of faulty scaffolding components to the construction site in order to secure the safety of the temporary structure was suggested.

Requirement Analysis of the System Form for the Bridge Slab (교량 상판(바닥판) 콘크리트 타설용 시스템 거푸집 개발을 위한 요구조건 분석)

  • Kim, Taekoo;Lim, Jeeyoung;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.195-196
    • /
    • 2014
  • Unlike general construction works, bridge construction is mostly done in a high place. The conventional deck form of bridge is installed between precast concrete girders using sleepers, bridging joints and plywoods, and after concrete is poured to the deck, the form materials are removed at high altitudes. When removing the form, it may be dropped on ground, damaging the materials and resulting in economic loss. In addition, safety accidents are likely as the works are performed in a high place, and as the manpower increases, the cost increases. Also, it is difficult to install and remove temporary equipment. Therefore, it is required to develop a system form that allows easier and quicker installation and removal by unskilled workers and ensures safety of workers. In this regard, the study is intended to analyze requirements for the system form for pouring concrete to bridge decks, which can be easily installed and removed. The study result will be used as basic information for development of the system form for pouring concrete to bridge decks.

  • PDF

A Study on the Estimation Standard of Optimal Construction Duration for Reinforced Concrete Apartment House (철근콘크리트조 공동주택 적정공기 산정기준에 관한 연구)

  • Chun Young-Gee;Lee Gye-Uk;Kim Yang-Taek;Hyun Chang-Tae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.531-534
    • /
    • 2001
  • At the beginning of construction, the estimation for the construction duration is very important to effectively control and use labors, builder's equipment, permanent and temporary materials, supplies and utilities, and money. In spite of the importance of the estimation for the construction duration, there is no estimation standard of optimal construction duration in korea. The purpose of this study is to suggest the estimation standard of optimal construction duration that is reasonable and systematical through developing the method for estimating, the construction duration. it is expected to be helpful for estimating, planning and scheduling. The analysis is executed the existing estimation standards and consulting the results of the interviews with the on-site engineers and the concrete compressive stress tests.

  • PDF

Communication Performance of BLE-based IoT Devices and Routers for Tracking Indoor Construction Resources

  • Yoo, Moo-Young;Yoo, Sung Geun;Park, Sangil
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.11 no.1
    • /
    • pp.27-38
    • /
    • 2019
  • Sensors collect information for Internet of Things (IoT)-based services. However, indoor construction sites have a poor communication environment and many interfering elements that make it difficult to collect sensor information. In this study, a network was constructed between a Bluetooth Low Energy (BLE)-based IoT device based on a serverless IoT framework and a router. This experimental environment was applied to large- and small-scale indoor construction sites. Experiments were performed to test the communication performance of BLE-based IoT devices and routers at indoor construction sites. An analysis of the received signal strength indication (RSSI) graph patterns collected from the communication between the BLE-based IoT devices and routers for different testbed site situation revealed areas with good communication performance and poor communication performance due to interfering factors. The results confirmed that structural components of the building as well as the materials, equipment, and temporary facilities used in indoor construction interfere with the communication performance. Construction project managers will require improved technical knowledge of IoT, such as optimizing the router placement and matching communication between the router and workers, to improve the communication performance for large-scale indoor construction.

A Study on Prevention of Major Accidents Through Utilization of Fall-Preventing Safety Installations (재해율의 예측에 의한 강구조공사의 중대재해 예방에 관한 연구)

  • 손기상;정경운
    • Journal of the Korean Society of Safety
    • /
    • v.13 no.4
    • /
    • pp.221-229
    • /
    • 1998
  • This study, with a view point to prevent accidents arising from steel structure, construction process, has taken an approach of reviewing related materials and construction safety guidelines, conducting questionnaire surveys and on field surveys. This study has also analyzed and classified accident cases and disclosed elements concerned with those accidents. A comparative analysis of the disclosed elements against the statutory provisions regarding industrial safety and it showed that strict observance of safety rules of the accident prevention measures in industrial safety standards will result in a decrease in accidents. It is concluded, however, that additional accident prevention measures, as suggested below, should be implemented for performing of more practical and positive accident prevention. 1) Thorough review and preparation at pre-working stage at sites : Such elements of fall preventing facilely as supporting ropes and steel fabrications for safety guard rails should be initially reflected on detailed drawings and shop drawings so that they can be installed in advance at fabricating plants. 2) Sets of steel frame stairs for work platform should be installed or secured with priority and temporary installation of such prefabricated platform as scaffolds should be installed in advance with those platform attached to the frame members on the ground whenever possible before they are lifted. 3) A decrease in the rate of accident by more than 10% on Tuesdays and Thursdays, has been shown from the accident analysis so schedule of construction process should consider possible weekday of high risk of accidents such as Tuesday and Thursday. 4) An array of systemized safety activities should be adopted, such as legal installation of safety facilities based on advance safety management plan, maintenance of safety for machinery and construction equipment, and strict compliance of safety rules by workers.