• Title/Summary/Keyword: Technology Development Project

Search Result 1,931, Processing Time 0.027 seconds

Algorithm selecting Software development route suitable for Project environment and characteristics (프로젝트 환경과 특성에 따른 소프트웨어 개발 경로 선정 알고리즘)

  • Jung Byung-Kwon;Yoon Seok-Min
    • The KIPS Transactions:PartD
    • /
    • v.13D no.1 s.104
    • /
    • pp.87-96
    • /
    • 2006
  • This paper focused on the method for customizing software development path, considering the project environments and characteristics. he selection standard of development path is composed of ten items, based on the process of ISO/IEC TR 15721 Information Technology Guide for ISO/IEC 12207 (Software Life Cycle Process) and ISO/IEC 15504 Information technology - Process assessment. The ten items were reflected the project environments and characteristics, at the same time the items conduct the adjustment item of selecting project development path. An algorithm for selecting software development path through items of the project environments and characteristics is presented. To test the algerian in this paper, a system for selecting development path, which reflected algorithm was developed. The development project for web-based system were also adopted to the system for selecting development path. In addition, provened hand-worked project path process differed from machine-worked project path process. The reason why it differs is that outputs were mixed or their names were changed. The effect is to select easily software development route suitable for project environment and characteristics.

Overview of "Glean Engine Technology Development Project" at Japan Aerospace Exploration Agency

  • Hayashi, Shigeru
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2004.03a
    • /
    • pp.870-875
    • /
    • 2004
  • In Japan, a long-waited civil aero engine development project has been recently started by the New Energy and Industrial Technology Development Organization, NEDO. “High efficiency,” “environmentally friendliness” and “low-cost” are the key words of the target engine. The target engine is of l0000-lb thrust with project consists of three phases: Feasibility studies and market research in the first phase, FY 2003, engine component development in the second phase, FY 2004-2006, and core and full engine demonstrators in the third phase, FY 2007-2009. In league with this government/industry joint funded project, Institute of Space Technology and Aeronautics, JAXA, has initiated “Clean Engine Technology” project.

  • PDF

A Study on the Risk Management of Core Technology R&D Project using Degree of Difficulty and Technology Readiness Level (기술난이도와 기술성숙도를 이용한 핵심기술 연구개발 위험도 관리에 관한 연구)

  • Lee, Taehyung
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.19 no.6
    • /
    • pp.789-796
    • /
    • 2016
  • In the Core Technology R&D of the defence area, the development of the related core element technology could be the foundation to develop advanced weapon system in the future. But it might make various problems if you can not accurately define the TRL of the element technology. In other words, if the technology is not sufficiently mature and then the project starts, it might require an increase in the development period and additional cost. Finally the system will be in an incomplete state and result in user dissatisfaction and the project failure. Therefore it is a very important task to properly assess the TRL for a successful project. In this study, We propose the method for risk management of core technology R&D project of the defence area using the QFD process with degree of difficulty and technology readiness level. It is also presented the process to determine the risk level using TRL and Degree of difficulty. Finally We apply this method to UGV system for verifying the result of this study.

A Development Methodology for Quality Assurance System in Large-Scale Software Development Project (대규모 소프트웨어 개발 사업에서의 품질 보증을 위한 개발방법론)

  • 윤석환;박지은;신용백
    • Journal of Korean Society for Quality Management
    • /
    • v.25 no.1
    • /
    • pp.142-155
    • /
    • 1997
  • To successfully carry out large scale research projects while su, pp.rting quality assurance of research output, effective and systematic management through utilization of resources such as manpower, time and cost as well as engineering techniques such as component technology and design methodology is required. It is necessary to establish development methodology to su, pp.rt quality assurance. The development methodology covers the contents and procedures of the project, such as division of the project into independently executable units, allocation of resources including researchers, component technology, related know-how and equipment, deployment of research units and integration of the project at the end. In this paper we present systematic development methodology for quality assurance in large scale software development projects by analyzing the contents of the methodology a, pp.ied to the Gigabit Information-processing And Networking Technology development project(GIALT).

  • PDF

Quality Management Model for Process Performance Level and Development Technology (프로세스 이행 수준과 개발 기술 품질 관리 모델)

  • Park, J.H.;Park, Y.S.;Jung, H.T.;Kim, S.H.
    • Electronics and Telecommunications Trends
    • /
    • v.32 no.6
    • /
    • pp.105-115
    • /
    • 2017
  • This paper describes a project - based quality management model that identifies development technologies and codes while at the same time verifying the ability to implement processes that are essential in R & D projects. In order to verify the process implemented in the R & D project implementation, there are review, checking points, and evaluating methods the process performance levels for five processes such as defining requirements which is the beginning stage of system development, testing process which is the completion stage of system development, and project management and peer review process for project management and support in the proposed project-based quality management model. For development technology and code validation, the model included the documented test cases for each requirement by the developer in the requirements definition stage, debugging and testing in the design and implementation stages, static analysis and open source licence verification procedure, and system environment. After applying the model in SW development R&D project for evaluating the process performance, and verifying the development technology and the code, the developers responded that the improvement in the development technique and the code, and upgrade of process performance level for project are more than 10%.

THE IDENTIFICATION OF MALAYSIAN CONTRACTOR SATISFACTION DIMENSIONS: A STRATEGY FOR CONTINUOUS IMPROVEMENT

  • Md Asrul Nasid Masrom;Martin Skitmore;Adrian Bridge
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.335-339
    • /
    • 2011
  • The unique characteristics of the construction industry - such as the fragmentation of its processes, varied scope of works and diversity of its participants - are contributory factors to poor project performance. Several issues are unresolved due to the lack of a comprehensive technique to measure project outcomes including: inefficient decision making, insufficient communication, uncertain site conditions, a continuously changing environment, inharmonious working relationships, mismatched objectives within the project team and a blame culture. One approach to overcoming these problems appears to be to measure performance by gauging contractor satisfaction (Co-S) levels, but this has not been widely investigated as yet. Additionally, the key Co-S dimensions at the project level are still not fully identified. This paper concerns a study of satisfaction dimensions, primarily by a postal questionnaire survey of construction contractors registered by the Malaysian Construction Industry Development Board (CIDB). Eight satisfaction dimensions are identified that are significantly and substantially relate to these contractors - comprising: project cost performance, schedule performance, product performance, design satisfaction, site safety, project profitability, business performance and relationships between participants. -Each of these dimensions is accorded different priority levels of satisfaction by different contractors. The output of this study will be useful in raising the awareness and understanding of project teams regarding contractors' needs, mutual objectives and open communication to help to deliver a successful project.

  • PDF

Comparing Efficiencies of R&D Projects Using DEA : Focused on Core Technology Development Project (DEA를 이용한 R&D 사업의 효율성 비교 : 원천기술개발사업을 중심으로)

  • Kim, Heung-Kyu;Kang, Won-Jin;Park, Jung-Hee;Yeo, In-Kuk
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.36 no.3
    • /
    • pp.126-132
    • /
    • 2013
  • In this paper, efficiencies of core technology development projects, conducted by Ministry of Trade, Industry and Energy, are compared. In the process, DEA (Data Envelopment Analysis) is utilized as a main technique for comparing efficiencies. For DEA, input oriented BCC Model is adopted with government grant, recipient expenditure, the number of participating institutions, and project duration as input factors, and the number of patents, the number of papers, and occurred sales as output factors. As a result, next generation mobile communication project turns out to be the most efficient project of all. Therefore, next generation mobile communication project should be benchmarked for the other projects to follow. However, these results should be used only for reference data since every project has a different objective and, of course, is run under a different environment.

A Case Study of SW Development Productivity Improvement by MDD/MDA Technology Application in CBD Project (CBD 프로젝트에서의 MDD/MDA 기술 적용을 통한 개발생산성 향상 사례)

  • Choi, Jeong-Il
    • Journal of Information Technology Services
    • /
    • v.5 no.2
    • /
    • pp.179-188
    • /
    • 2006
  • MDD/MDA which recently raising its head is technology that increase software development productivity through automatic transformation form higer abstract model into lower abstract model, or from model to code. This paper analyzes the effect on productivity by measuring Function Point per MM(man-month) in a software development project which performed in CBD methodology, and introduce the method of applying MDD/MDA technology in the project.