• Title/Summary/Keyword: Technical Bidding Method

Search Result 13, Processing Time 0.024 seconds

BIM-Based VE Proposal Management Using Parametric Modeling (파라메트릭 모델링을 활용한 BIM기반 VE제안 관리 방안)

  • Kim, Dain;Choi, Jaehyun;Lee, Jin Gang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.163-164
    • /
    • 2023
  • The technical proposal bidding system emphasizes the evaluation of the construction company's technical capabilities, with the aim of improving the quality and cost-effectiveness of the construction. However, in the VE analysis and proposal process for technical proposal bidding, the ideas are often reused from similar past construction projects, and the application of new construction technologies/methods is often lacking. Therefore, this study proposes a methodology for managing VE proposal information by integrating it into a BIM model using parametric modeling. This research developed database based on the existing VE proposals and new construction technology/method information from the Korea Institute of Civil Engineering and Building Technology. And by using parametric modeling, the proposed method integrate the VE database with BIM model. The methodology proposed in this study is expected to improve the reliability and effectiveness of VE-related idea proposals in technical proposal bidding.

  • PDF

Analysis of Factors Affecting Successful Bid Price in Public Construction Technical Bidding (공공공사 기술형 입찰에서의 낙찰가격에 미치는 요인 분석)

  • Lee, Jung-Woong;Yi, Sung-Wook
    • Asia-Pacific Journal of Business
    • /
    • v.13 no.1
    • /
    • pp.213-230
    • /
    • 2022
  • Purpose - The purpose of this study is to find out any potential factors for explanatory variables when calculating the virtual successful bid rate in case of no collusion. Design/methodology/approach - An empirical analysis was conducted in this study with a regression analysis that included 725 bid samples under the public construction technical type bidding. Findings - The result of the basic analysis showed that there are several factors affecting the successful bid rate. First, collusion variable; second, government variable; third, successful bidder design score variable and the number of bidder variable among bidding features; fourth, turnkey variable based on the alternative method; fifth, civil works variable and plant works variable based on building work; sixth, asset variable and the fourth-quarter performance difference variable. However, the technical proposal method variable among bidding features was found to be statistically insignificant in column(4). Research implications or Originality - The significance of this research is that new variable such as the government variable and the fourth-quarter performance difference variable were added in the regression model, which showed statistically significant research results.

A study on evaluation element of technical proposal tendering for apartment remodeling business

  • Park, Min-Young;Lim, Sooyoung
    • KIEAE Journal
    • /
    • v.15 no.1
    • /
    • pp.61-68
    • /
    • 2015
  • Method of remodeling builder selection for remodeling is competitive bidding. also metropolitan city, megalopolis city, city more than 50million have to do basic plan for remodeling before establishment of a housing cooperative. Purpose of basic plan is improvement of living conditions & the Quality of Life for resident. Technical Proposal Tendering in spite of being the a reasonable bidding system, institutional part, appraisal standard and the item part, consider procedure pard is performed in a similar way to the existing bidding system. so, technical proposal tendering is appropriate for future Method of builder selection of remodeling. therefore, the study purpose is a evaluation element of technical proposal tendering for apartment remodeling business The methods of study is understanding concept through review of precedent literature. Next, case investigation through Analysis of focal points. Lastly, evaluation element deduction of technical proposal tendering for apartment remodeling business through specialist conversation. As a result, Alteration of a right & move management is added to evaluation element's professional field. And detail item is alteration of a right & move management.

A Study on Performance Analyses of Korea's Bidding and Contract Systems for Public Construction Projects

  • Beak, Seung-Ho;Kang, Tai-Kyung;Park, Wonyoung;Lee, Yoo-Sub
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.3
    • /
    • pp.18-28
    • /
    • 2015
  • Bidding and contract systems are used for public construction projects to select contractors following fair competition principles and to execute national budgets effectively. Many challenges have arisen due to a lack of transparency and fairness and because bidding practices have been luck-based. Few comprehensive or comparative analyses have been conducted on the performance and limitations of bidding and contract systems, and empirical analyses designed to improve policies on and the practice of such systems are lacking. This study empirically analyzed current bidding and contract systems to seek ways of improving them. The study proposes several alternatives to resolve the problems with and irrationalities of the current system: 1) improving bidding and selection systems by changing them from a luck-based price competition into a technical merit- and value-based competition; 2) improving the assessment criteria to meet the current market level of bid and winning prices; 3) adjusting contractual responsibilities and sharing structures to meet the current trend; and 4) strengthening the competitiveness and expanding the social responsibility-based procurement systems of construction companies.

A Study on the Evaluation System for Bidders to According to the Best Value Bid System by Technology Proposal Method (기술제안방식의 최고가치낙찰제도 입찰자 평가체계에 관한 연구)

  • Yeo, Sang-Ku;Lee, Gun;Lee, Hyun-Chul;Go, Seong-Seok
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2009.04a
    • /
    • pp.211-216
    • /
    • 2009
  • Bidding systems in the domestic public construction work have been amended many times since the lowest-bidding system was implemented in 1951. However, this hasn't had much success. Competition in technical development among companies has declined as the contracts for buildings are given to company which submits the lowest price without considering traits of projects. In addition, as the construction market turns to the limitless competition system due to FTA(Free Trade Agreement), advanced techniques are needed to promote the national competitive power. Considering the needs of the times, Korean government announced that "Best Value Contract (Design-Bid-Build)" and "Bridging Contracts (Design-Build)" are included to 4 existing bidding systems in October 2007. Thus this study aims to suggest devised the evaluation criteria including major items for evaluating bidders, in order to establish and revitalize the best-value bid system successfully.

  • PDF

An Effective Analysis and Management of Technical Risk to Turn-key based Plant Construction Contracts using Systems Engineering (시스템엔지니어링을 이용한 턴키방식 플랜트 건설계약의 기술적 위험요인 효과적 분석 및 관리)

  • Hong, Dae Geun;Byun, Hee Chul;Suh, Suk-Hwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.10 no.2
    • /
    • pp.59-69
    • /
    • 2014
  • In the bidding stage of turn-key based plant construction contracts, owners provide design and performance basis for contractors instead of giving design drawing. To win the bid for a plant construction, the contractors should be obliged to satisfy and ensure owners'requirements such as design and performance basis in a plant construction project, In other words, owners imposes technical risk of the design to the contractors by specifying responsibility for the analysis and verification of the plant construction. Thus, it is very important that contracters make accurate and realistic basic design plan in a short period of time. To deal with such a situation, we propose a systems engineering approach for the analysis and management of the technical risk. Specifically, we first: 1) Analyzes technical risk related with the plant design information for the bidders, followed by 2) Developing stakeholder requirements for the basic engineering design, and 3) System requirements for dealing with technical risk. Also, in this paper, we proposed converting method from MOE(Measure of Effectiveness) to MOP(Measure of Performance) in the risk analysis. To show the effectiveness of the proposed method, we carried out a case study.

The Development of Risk Management Process Model during Bidding Phase for Success of Oversea Construction Projects (성공적 해외건설사업을 위한 입찰단계의 리스크 관리 프로세스 모델 개발 - 발전 플랜트 EPC 사업을 중심으로 -)

  • Seo, Jae-Pil;Ryu, Han-Guk;Son, Bo-Sik;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.76-86
    • /
    • 2016
  • Recently, the Contracts of International Construction Business has been decreased from the beginning of 2015 in Korea, although it has been steadily increased until 2014. This trend could be caused by Low-Price Contracts, the lack of Know-how and experience in operating, the poor management of Claims and Low-Profitability in Business. It has been recognized that the qualitative improvement of Business Contacts are necessary for successful Projects. In the Bidding Process, therefore, Experience data as In-House Data and Lessons Learned for projects should be strategically involved to assure riskless offers. Accordingly the Proposal Process are needed to be organized and enhanced by including processes for risks review about technical, marketing and commercial part during the bidding. This paper proposes a Risk Management Process model during Bidding Phase, using Risk Evaluation Method through the project life-cycle. The Concept of Model is to define CSF (Critical Success Factor) in the bidding process and Risk Factors are linked to CSF and Organization based on RAM (Responsibility assignment matrix).

Estimation Method of the Competitive Bid-price in Bid-rigging of Public Construction (기댓값 분석에 따른 공공공사 입찰담합의 가상경쟁가격 산정방법)

  • Jeong, Kichang;Kim, Wooram;Kim, Namjoon;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.52-60
    • /
    • 2018
  • Korea's public construction projects are under construction through bidding, however, due to the nature of the bidding, collusion between participants can occur. The collusion of bids accordingly damages the client. So, it is necessary to calculate the appropriate fictitious competition price to compensate for this. In this regard, econometrics methods are generally used, but there are limitations and issues arising from the nature of construction, especially design-build bid. Therefore, this study proposes a method to estimate reasonable competitive bid-price in design-build bid. It derives the lowest bid-price from the design submitted by the proponent and estimates the competitive bid-price by examining the factors according to the penetration rate according to the technical level of the tester, the skill level of the competitor, and the type of tester. Based on the method proposed in this study, a reasonable price can be derived that reflects the characteristics of the design and construction bidding bidder selection method and also it can be used as a reference material in the actual bidding process as well as calculating the damage due to the answer.

A Study on the Characteristics of "Early Contractor Involvement Method" in Public Project in Japan

  • Tamura, Atsushi
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.42-49
    • /
    • 2022
  • In recent years, Owner, Architects, and Contractor are increasingly collaborating with each other from pre construction phase in construction projects, which is called Early Contractor Involvement (ECI). In Japan, the ECI method has been introduced in several public building projects since 2015. The purpose of this study is mainly to clarify the characteristics of the ECI method in Japan and to compare the contract clauses of the ECI method in the UK and the USA. The results of the survey are as follows. (1) the ECI method was supposed to make it possible to achieve appropriate quality, cost, and construction period by reflecting Contractor's technology and know-how in the design documents and specifications. (2) According to the database, there were 27 cases of the ECI method in Japan from 2015 to 2021, of which 13 cases for which bidding information could be obtained had a variety of technical proposals, mainly VE proposals, depending on the project characteristics. (3), Japan's ECI method has very much in common with SBC + PCSA in the UK. On the other hand, ECI Method in Japan differs from in the UK in that Owner, Architect, and Contractor enter into a partnership agreement, which is similar to ConsensusDocs CD541 in the USA. (4) The ECI method in Japan has the following problems: Owner depends on Contractor for cost control, the division of roles among project members is complicated, and more work from Owner than the DBB method are required.

  • PDF

Deduction on The Problems and Improve The Way of The Successful Bidder Determination Method for Turnkey·Alternative Bid Construction (턴키·대안입찰공사 낙찰자 결정방식의 문제점 및 개선 방안 도출)

  • Park, Hong-Tae;Lee, Yang-kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1881-1891
    • /
    • 2014
  • Full system of turnkey deliberation committee in 2010 was abolished and permanent Deliberation committee was introduced. So far, ordering organization selected the best method suitable for the design and comprehensive evaluation method in the turnkey bid construction. Comprehensive evaluation method have bid price design score coordination, weighted basis, the best design approach fixed amount, five successful bidder decision method in addition. Design deliberation branch committee in the successful bidder decision way configured and operated branch members of special design consultation committee, But main agent changed from committee deliberation pull system to permanent committee deliberation, as well as and The lobby burden was not improved. This similar to the past at the portion of the design deliberation and the way of the design deliberation in the turnkey bid construction. Therefore it is necessary to improve the design deliberation system. In other words, design score and technology competition should be adapted to determine a successful bid. This study suggested the operating system of the design deliberation, the decision method problems of the successful bidder and ways to improve the design deliberation.