Evaluation of Partial Safety Factors on Sliding of Monolithic Vertical Caisson of Composite Breakwaters (혼성제 직립 케이슨의 활동에 대한 부분안전계수 산정)

  • Lee, Cheol-Eung;Park, Dong-Heon;Kwon, Hyuk-Jae;Lee, Sun-Yong
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.21 no.4
    • /
    • pp.267-277
    • /
    • 2009
  • Partial safety factors of the load, resistance, and reliability function are evaluated according to the target probability of failure on sliding mode of monolithical vertical caisson of composite breakwaters. After reliability function is formulated for sliding failure mode of caisson of composite breakwaters regarding bias of wave force, uncertainties of random variables related to loads, strengths are analyzed. Reliability analysis for the various conditions of water depth, geometric, and wave conditions is performed using Level II AFDA model for the sliding failure. Furthermore, the reliability model is also applied to the real caisson of composite breakwaters of Daesan, Dong- hae, and Pohang harbor. By comparing the required width of caisson of composite breakwater according to target probability of failure with the other results, the partial safety factors evaluated in this study are calibrated straightforwardly. Even though showing a little difference on the 1% of target probability, it may be found that the present results agree well with the other results in every other target probability of failure.

An Investigation of the Relationship between Revenue Water Ratio and the Operating and Maintenance Cost of Water Supply Network (상수관망 유수율과 유지관리 비용의 관계 분석)

  • Kim, Jaehee;Yoo, Kwangtae;Jun, Hwandon;Jang, Jaesun
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.2
    • /
    • pp.202-212
    • /
    • 2012
  • Due to the deterioration of water supply network and the deficiency of raw water, the water utility of local governments have performed various projects to improve their revenue water ratio. However, it is very difficult to estimate the cost for maintaining the revenue water ratio at higher level after completing the project, because local governments have different conditions affecting the operating and maintenance cost of water supply network. The purpose of this study is to present a procedure to estimate the operating and maintenance cost required to maintain the target revenue water ratio of the water supply network. For this purpose, we estimated the cost used only for operation and maintenance of water supply network of 164 local governments with the aid of K-Mean Clustering Analysis and the data from 40 representative local governments. Then, the regression analysis was performed to find relationship between revenue water ratio and the operating and maintenance cost with two different data sets generated by two classification methods; the first method classifies the local governments by means of k-means clustering, and the other classifies the local governments according to the index standardized by the operating and maintenance cost per unit length of water mains per revenue water ratio. The results shows that the method based on the index standardized by the cost and revenue water ratio of each government produces more reliable results for finding regression equations between revenue water ratio and the operating and maintenance cost only for water supply network. The estimated regression equations for each group can be used to estimate the cost required to keep the target revenue water ratio of the local government.

Evaluation of Drought Impact and Function Improvement Effect of Agricultural Hydraulic Structures (농업수리구조물의 가뭄 영향 및 기능개선 효과 분석)

  • Lee, Jae-young;Kim, Hwang-hee;Shin, Hyung-jin;Kim, Hae-do;Kwon, Hyung-joong;Jeon, Jong-chan;Cha, Sang-sun;Park, Chan-gi
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.3
    • /
    • pp.1-13
    • /
    • 2018
  • Recently, the frequency and intensity of drought have been increasing due to the sudden abnormal climate in Korea. The occurrence of agricultural drought has been steadily increasing from 5 times in the 1980s to 2000s in 20 years, 6 times in the 10 years from 2000 to 2010, and 4 times in the recent period from 2011 to 2015. Therefore, this study analyzed the effect of water shortage caused by drought by improving the function of agricultural reservoir. The target area analyzed the data such as "Comprehensive Information System for Rural Water" operated by Korea Rural Community Corporation. As a result, we selected the target area as Wanju - gun, Jeollabuk - do in consideration of the rate of water storage compared with the normal 25 years, the completion year of the facility, the area of coverage per reservoir site and the low capacity. As a result of evaluating the improvement effect of agricultural facilities, it was analyzed that the irrigation area increased by about 25.7% when the water level was increased by 1m and the irrigation area increased by about 51.3% when the water level was increased by 2m. The results of the drought impact assessment after improving the function of the agricultural facilities were analyzed that it was effective to improve the function after more than 4m depth.

Assessing the Action Plans in the Control Area(Soyang Reservoir) of Non-point Source Pollution (비점오염원 관리지역(소양호) 목표수질 달성도 평가)

  • Choi, Jaewan;Kang, Min-Ji;Ryu, Jichul;Kim, Dong-Il;Lim, Kyung-Jae;Shin, Dong-Seok
    • Journal of Environmental Science International
    • /
    • v.23 no.5
    • /
    • pp.839-852
    • /
    • 2014
  • The Ministry of Environment (MOE) has made more effort in managing point source pollution rather than in nonpoint source pollution in order to improve water quality of the four major rivers. However, it would be difficult to meet water quality targets solely by managing the point source pollution. As a result of the comprehensive measures established in 2004 under the leadership of the Prime Minister's Office, a variety of policies such as the designation of control areas to manage nonpoint source pollution are now in place. Various action plans to manage nonpoint source pollution have been implemented in the Soyang-dam watershed as one of the control areas designed in 2007. However, there are no tools to comprehensively assess the effectiveness of the action plans. Therefore, this study would assess the action plans (especially, BMPs) designed to manage Soyang-dam watershed with the WinHSPF and the CE-QUAL-W2. To this end, we simulated the rainfall-runoff and the water quality (SS) of the watershed and the reservoir after conducting model calibration and the model validation. As the results of the calibration for the WinHSPF, the determination coefficient ($R^2$) for the flow (Q, $m^3/s$) was 0.87 and the $R^2$ for the SS was 0.78. As the results of the validation, the former was 0.78 and the latter was 0.67. The results seem to be acceptable. Similarly, the calibration results of the CE-QUAL-W2 showed that the RMSE for the water level was 1.08 and the RMSE for the SS was 1.11. The validation results(RMSE) of the water level was 1.86 and the SS was 1.86. Based on the daily simulation results, the water quality target (turbidity 50 NTU) was not exceeded for 2009~2011, as results of maximum turbidity in '09, '10, and '11 were 3.1, 2.5, 5.6 NTU, respectively. The maximum turbidity in the years with the maximum, the minimum, and the average of yearly precipitation (1982~2011) were 15.5, 7.8, and 9.0, respectively, and therefore the water quality target was satisfied. It was discharged high turbidity at Inbuk, Gaa, Naerin, Gwidun, Woogak, Jeongja watershed resulting of the maximum turbidity by sub-basins in 3years(2009~2011). The results indicated that the water quality target for the nonpoint source pollution management should be changed and management area should be adjusted and reduced.

Forecasting Model for Flood Risk at Bo Region (보 지역 홍수 위험도 예측모형 연구)

  • Kwon, S.H.;Oh, H.S.
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.1
    • /
    • pp.91-95
    • /
    • 2014
  • During a flood season, Bo region could be easily exposed to flood due to increase of ground water level and the water drain difficulty even the water amount of Bo can be managed. GFI for the flood risk is measured by mean depth to water during a dry season and minimum depth to water and tangent degree during a flood season. In this paper, a forecasting model of the target variable, GFI and predictors as differences of height between ground water and Bo water, distances from water resource, and soil characteristics are obtained for the dry season of 2012 and the flood season of 2012 with empirical data of Gangjungbo and Hamanbo. Obtained forecasting model would be used for keep the value of GFI below the maximum allowance for no flooding during flooding seasons with controlling the values of significant predictors.

A Study on Water Level Rising Travel Time due to Discharge of Paldang Dam and Tide of Yellow Sea in Downstream Part of Paldang Dam (팔당댐 방류량과 황해(서해) 조석영향에 따른 팔당댐 하류부 수위상승도달시간 예측)

  • Lee, Jong-Kyu;Lee, Jae-Hong
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.10 no.2
    • /
    • pp.111-122
    • /
    • 2010
  • As the Jamsu-bridge and the floodplains of the Han River can be flooded during the rainy season, the exact prediction of the peak flood time is very important for mitigation of flood hazard. This study analyzes the effect of outflow of Paldang Dam and tide of Yellow Sea on the Han River. A target area is from the Paldang dam to Jeonryu gauging station. Water level of Jeonryu as a downstream boundary condition was estimated through multi linear regression analysis with outflow of Paldang dam and tide level of Incheon, because it was influenced by both a tide of Yellow Sea and outflow of Paldang dam. In this study, Water Level Rising Travel Time of the Jamsu-bridge and some floodplains in the Han River are estimated. Also, The second order polynomial expressions for relationships of outflow of Paldang Dam and Water Level Rising Travel Time were developed considering the outflow of Paldang dam and tide of Yellow Sea.

Backscattering Features of Oyster Sea Farming in AIRSAR Image and Laboratory Experiment

  • Lee Seung-Kuk;Hong Sang-Hoon;Won Joong-Sun
    • Proceedings of the KSRS Conference
    • /
    • 2004.10a
    • /
    • pp.582-585
    • /
    • 2004
  • Oyster fanning structures in tidal flats are well detected by SAR system. Each frame of these artificial structures is composed of two vertical and one horizontal wooden pole. We investigate characteristics of polarimetric features in the target structures. In this paper, the results of AIRSAR L-band POLSAR data and experiments in laboratory are discussed. The ratio of single bounce to double bounce scattering depends of vertical pole height, direction of horizontal pole to radar look direction, and incidence angle as well as sea surface condition. We have conducted laboratory experiments. According to target scale, Ku-band and targets downsized by scale of 10 are used. The results of the experiments are summarized as: i) total power of the backscattering is more affected by vertical poles than a horizontal pole; ii) and backscattering from a horizontal pole is sensitive to the relative radar look direction to target array. We conclude that water level can be effectively measured by using interferometric phase and backscattering intensity if vertical poles in the water are observed by L-band HH- or VV-polarization. Measurement of tide height can be further improved if double bounced components are separated from fully polarized SAR data.

  • PDF

Establishment of Role Between Central and Local Government for Implementation of Total Maximum Daily Load (수질오염총량관리제 시행에 있어서 중앙정부와 지방자치단체 간 역할정립)

  • Yi, Sang-Jin
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.33 no.5
    • /
    • pp.378-383
    • /
    • 2011
  • The policy of total maximum daily load (TMDL) was adopted to manage water pollutants so as to keep the total amount of pollutants in the watersheds within established target water quality. While the TMDL was implemented in all four major river basins, various problems occurred. Even though the corrections for problems were conducted, the role between central and local government was not established exactly. This study was presented to suggest a role between central and local governments for effective implementation of TMDL. When the central government establishes the environmental criteria with water quality standards and pollutants in the main rivers, the local government should establish the level of target pollutants in the watershed. Also, the local government should be continuously implementing the water quality and flowrate monitoring of the tributaries to find out the degree of water quality improvement in the tributaries. Especially, the basic plan of TMDL for the whole watershed should be established by the river basin environmental office at the central government. The local government should be established the implementation plan of TMDL for the watershed where exceeds the established target water quality. The performance assessment of TMDL should be implemented every year to the water quality and flowrate monitoring of the tributaries for satisfaction assessment of target water quality in the watershed by the lower-lever government. The performance assessment report of TMDL included with an analysis of causes for the excess water quality in the watershed should be submitted to the river basin environmental office at the end of the TMDL planning period.

A Study on the Control of the Temperature and Relative Humidity in Greenhouse by Adjusting the Amount of Natural Ventilation and Fog Spray Quantity (자연환기량과 포그분무량 조절에 의한 온실 온습도의 동시제어 기법 연구)

  • Kim, Youngbok;Sung, Hyunsoo;Hwang, Seungjae;Kim, Hyeontae;Ryu, Chanseok
    • Journal of the Korean Solar Energy Society
    • /
    • v.36 no.5
    • /
    • pp.31-50
    • /
    • 2016
  • To develope a greenhouse fog cooling system to control the temperature and relative humidity simultaneously to the target value, a theoretical analysis and experiments were done. The control process includes the measuring of environmental variables, setting and coding of the water and heat balance equations to maintain the target temperature and relative humidity in greenhouse, calculating of the open level of the greenhouse roof window that governs the natural ventilation and spray water quantity, and operating of the motor to open/close the roof window and pump to spray for water. The study results were shown to be very good because the average air temperature in the greenhouse was kept to be about $28.2^{\circ}C$ with the standard deviation of about $0.37^{\circ}C$ compared to the target temperature of $28^{\circ}C$ and the average relative humidity was about 75.2% compared to the target relative humidity was 75% during the experiments. The average outside relative humidity was about 41.0% and the average outside temperature was $27.2^{\circ}C$ with the standard deviation of about $0.54^{\circ}C$. The average solar intensity in the greenhouse was 712.9 W. The wind velocity of outside greenhouse was 0.558 m/s with the standard deviation of 0.46 m/s.

Data Quality Assessment and Improvement for Water Level Prediction of the Han River (한강 수위 예측을 위한 데이터 품질 진단 및 개선)

  • Ji-Hyun Choi;Jin-Yeop Kang;Hyun Ahn
    • Journal of Advanced Navigation Technology
    • /
    • v.27 no.1
    • /
    • pp.133-138
    • /
    • 2023
  • As a side effect of recent rapid climate change and global warming, the frequency and scale of flood disasters are increasing worldwide. In Korea, the water level of the Han River is a major management target for preventing flood disasters in Seoul, the capital of Korea. In this paper, to improve the water level prediction of the Han River based on machine learning, we perform a comprehensive assessment of the quality of related dataset and propose data preprocessing methods to improve it. Specifically, we improve the dataset in terms of completeness, validity, and accuracy through missing value processing and cross-correlation analysis. In addition, we conduct a performance evaluation using random forest and LightGBM to analyze the effect of the proposed data improvement method on the water level prediction performance of the Han River.