• Title/Summary/Keyword: Takeoff

Search Result 189, Processing Time 0.021 seconds

The study on structural vulnerability analysis of small fixed wing UAV with hard landing (동체 착륙 방식의 소형 고정익 무인항공기 구조 취약점 분석)

  • Jeong, Seong-rok;Kang, Ju-hwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.7
    • /
    • pp.20-25
    • /
    • 2019
  • In this paper, the structural weakness analysis and quality improvement of small fixed wing UAV of the hard landing type were studied. Unlike conventional aircraft, small UAV does not use runways because of its small size. Instead, small UAV use hand launch takeoff and hard landings. This type has many operational advantages because it can take off and land in a narrow space. But, the hard landing has a strong impact on the structure of the UAV and can cause serious damage. In order to analyze the exact cause of this phenomenon, the structural analysis was carried out using the 3D structural analysis program (ABAQUS) to identify the location of the fracture. And to improve the accuracy of the structural analysis, properties of the material were obtained through specimen test. As a result of the analysis, structural weaknesses were identified and improved. Thus, the validity of the study was verified by demonstrating the quality of enhanced structure through a real impact test at a higher level of 1.5 times the maximum impact during operation.

A Study on the Improvement of Domestic Navigation Safety System: Focused on the Implementation of Korea Augmentation Satellite System (국내 항행안전시스템의 개선에 관한 연구: 한국형 정밀위성항법 보강시스템의 구축을 중심으로)

  • Kim, Yeong-Pil;Hwang, Kyung Tae
    • Journal of Digital Convergence
    • /
    • v.19 no.2
    • /
    • pp.221-230
    • /
    • 2021
  • The study attempts to suggest potential problem and solutions expected in the process of implementing KASS, which is currently under development to improve the domestic navigation safety system, and to summarize improvement effects of domestic navigation safety system anticipated by the implementation of KASS. Challenges expected in the process of implementing KASS exists in four aspects: emotional, technical, cost, safety aspects. When KASS is implemented and operates, various benefits can be realized. Benefits include cost savings by not using navigation safety systems during takeoff and landing; reduction of flight delays and cancellations by removing airway congestion; increase of aircraft accommodation capacity; reduction of carbon emissions; preparation for future aviation demands and improvement of air transportation safety; and reduction of flight accidents. In conclusion, it is expected to enter into an era of more intense competition due to increased aviation demands. In order to survive in this competitive environment, early introduction of KASS is indispensable. Analysis results of this study are expected to provide reference information for academic research in this area. A possible future research topic include a study predicting the changes in the navigation safety systems introduced by KASS and proposing practical and useful ways to respond the changes.

Development of Preliminary Conceptual Design/ Comprehensive Analysis Programs for Next Generation Rotorcraft (차세대 회전익 기본개념설계/통합해석 프로그램의 개발)

  • Oh, Sejong;Park, Donghoon;Ji, Hyung Min
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.49 no.1
    • /
    • pp.75-84
    • /
    • 2021
  • The authors had presented two previous papers[1,2] on Helicopter/Rotorcraft develoment in Europe and US. Meanwhile, the next generation rotorcrafts, currently under development in US and Europe, have new configurations (tilt-rotor, coaxial, compound) of rotor-type vertical takeoff/landing rotorcrafts to overcome the disadvantages of traditional helicopters. For developing these new types of rotorcrafts, the upgraded conceptual design/comprehensive programs are required. In US and Europe, they are already developing new program tools with their technologies and database obtained during more than last half centuries. For us, many academia, research institutes and industrial engineers have experienced and developed core technologies on rotorcrafts (aerodynamics, structural analysis, flight dynamics, and noise analysis etc.) comparable to US and Europe during last couple of decades of developing helicopters and various configurations of rotorcrafts. In this paper, the pros and cons of conceptual design/comprehensive tools currently used in US and Europe have been summarized. Furthermore, the possibilities and problems to develope our own design and analysis tools have been studied.

Development of an Algorithm for Automatic Quantity Take-off of Slab Rebar (슬래브 철근 물량 산출 자동화 알고리즘 개발)

  • Kim, Suhwan;Kim, Sunkuk;Suh, Sangwook;Kim, Sangchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.52-62
    • /
    • 2023
  • The objective of this study is to propose an automated algorithm for precise cutting length of slab rebar complying with regulations such as anchorage length, standard hooks, and lapping length. This algorithm aims to improve the traditional manual quantity take-off process typically outsourced by external contractors. By providing accurate rebar quantity data at BBS(Bar Bending Schedule) level from the bidding phase, uncertainty in quantity take-off can be eliminated and reliance on out-sourcing reduced. In addition, the algorithm allows for early determination of precise quantities, enabling construction firms to preapre competitive and optimized bids, leading to increased profit margins during contract negotiations. The proposed algorithm not only streamlines redundant tasks across various processes, including estimating, budgeting, and BBS generation but also offers flexibility in handling post-contract structural drawing changes. In particular, the proposed algorithm, when combined with BIM, can solve the technical problems of using BIM in the early phases of construction, and the algorithm's formulas and shape codes that built as REVIT-based family files, can help saving time and manpower.

Effect of Weather, Flight, and Time Conditions on Anxiety and Time Perception of Helicopter Pilots in Flight (기상, 비행 및 시간 조건이 조종 중인 헬리콥터 조종사의 불안 및 시간지각에 미치는 영향)

  • MunSeong Kim;ShinWoo Kim;Hyung-Chul O. Li
    • Science of Emotion and Sensibility
    • /
    • v.26 no.1
    • /
    • pp.65-78
    • /
    • 2023
  • Aircraft are representative of human-machine systems. There is a delay between the human operation and the completion of the machine operation such as when the machine starts to operate and when the force is transmitted to the machine and completed. Time perception is an important component of timing tasks and is known to be affected by the anxiety associated with high arousal. This research verified the impact of weather, flight, and time conditions on the anxiety and time perception of in-service pilots in a virtual reality area. Weather conditions were divided into visual flight weather conditions and very low visibility conditions. Experiments 1 and 2 were performed with different flight and time conditions. In Experiment 1, time perception was measured by employing a button added to the control rod in the scenario of hovering and level flight with relatively little transformed in momentum and little delay. In Experiment 2, time perception was measured in the procedure of naturally taking off the helicopter by employing only the control stick in a takeoff scenario where there was a lot of transformation in momentum and a lot of delays. As a result of the experiment, it was reported that anxiety and heart rate increased in very low visibility conditions In particular, among all flight conditions in Experiments 1 and 2, it was reported that time was overestimated in the scenario of increased anxiety. This outcome can lead to overestimation of time under the impact of anxiety and failure of the timing task, which may lead to challenges in maneuvering and possibly lead to accidents.

A Study on Risks in China's Foreign Invested Water BOT Projects (중국 외국인투자 수처리 BOT 사업 리스크 연구)

  • Lee, Seungho;Choi, Jae-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.3D
    • /
    • pp.295-302
    • /
    • 2010
  • Since the late 1990s, the BOT mode in China has been extensively used in the water sector in order to attract private investment, improve technical and operational efficiency, and expand the coverage of water services. The BOT mode has been hailed as this provides a win-win structure between the government and private players through formalized procedures and an optimal risk allocation. However, recent market analyses show that some foreign investors are reluctant to participate in the market or even retreat due to uncertainties and risks in the market. This study aims to explore various risks in the Chinese water BOT market based on the thorough literature review, fieldwork, and the case studies on the two wholly foreign-owned BOT water projects: the Chengdu No. 6 and the Shanghai Dachang Water Supply BOT projects. The research results indicate that the Chinese BOT market embraces high risks in political, institutional and legal, and financial systems. The key to a successful takeoff of the BOT mode in the Chinese water market depends on the extent to which the government will be able to remove risky factors in political, institutional and legal, and financing systems. This research outcome will provide a useful reference to the Korean construction companies which consider expanding business to overseas water markets in the form of public private partnership.

Development and Case Study of Unmanned Aerial Vehicles (UAVs) for Weather Modification Experiments (기상조절 실험용 드론의 설계·제작과 활용에 관한 연구)

  • Hae-Jung Koo;Miloslav Belorid;Hyun Jun Hwang;Min-Hoo Kim;Bu-Yo Kim;Joo Wan Cha;Yong Hee Lee;Jeongeun Baek;Jae-Won Jung;Seong-Kyu Seo
    • Atmosphere
    • /
    • v.34 no.1
    • /
    • pp.35-53
    • /
    • 2024
  • Under the leadership of the National Institute of Meteorological Sciences (NIMS), the first domestic autonomous flight-type weather modification experimental drone for fog and lower-level cloud seeding was developed in 2021. This drone is designed based on a multi-copter configuration with a maximum takeoff weight of approximately 25 kg, enabling the installation of up to four burning flares for seeding materials and facilitating weather observations (temperature, pressure, humidity, and wind) as well as aerosol (PM10, PM2.5, and PM1.0) particle measurements. This research aims to introduce the construction of the drone and its recent applications over the past two years, providing insights into the experimental procedures, effectiveness verification, and improvement directions of the weather modification drone-based rain enhancement. In particular, partial confirmation of the experimental effects was obtained through the fog dissipation experiment on December 10, 2021, and the lower-level cloud seeding case study on October 5, 2022. To enhance the scope and rainfall amount of weather modification experiments using drones, various technological approaches, including adjustments to experimental altitude, seeding lines, seeding amount, and verification methods are necessary. Through this research, we aim to propose the development direction for weather modification drone technology, which will serve as foundational technology for practical application of domestic rain enhancement technology.

Development of Plant BIM Library according to Object Geometry and Attribute Information Guidelines (객체 형상 및 속성정보 지침에 따른 수목 BIM 라이브러리 개발)

  • Kim, Bok-Young
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.52 no.2
    • /
    • pp.51-63
    • /
    • 2024
  • While the government policy to fully adopt BIM in the construction sector is being implemented, the construction and utilization of landscape BIM models are facing challenges due to problems such as limitations in BIM authoring tools, difficulties in modeling natural materials, and a shortage in BIM content including libraries. In particular, plants, fundamental design elements in the field of landscape architecture, must be included in BIM models, yet they are often omitted during the modeling process, or necessary information is not included, which further compromises the quality of the BIM data. This study aimed to contribute to the construction and utilization of landscape BIM models by developing a plant library that complies with BIM standards and is applicable to the landscape industry. The plant library of trees and shrubs was developed in Revit by modeling 3D shapes and collecting attribute items. The geometric information is simplified to express the unique characteristics of each plant species at LOD200, LOD300, and LOD350 levels. The attribute information includes properties on plant species identification, such as species name, specifications, and quantity estimation, as well as ecological attributes and environmental performance information, totaling 24 items. The names of the files were given so that the hierarchy of an object in the landscape field could be revealed and the object name could classify the plant itself. Its usability was examined by building a landscape BIM model of an apartment complex. The result showed that the plant library facilitated the construction process of the landscape BIM model. It was also confirmed that the library was properly operated in the basic utilization of the BIM model, such as 2D documentation, quantity takeoff, and design review. However, the library lacked ground cover, and had limitations in those variables such as the environmental performance of plants because various databases for some materials have not yet been established. Further efforts are needed to develop BIM modeling tools, techniques, and various databases for natural materials. Moreover, entities and systems responsible for creating, managing, distributing, and disseminating BIM libraries must be established.

Indonesia, Malaysia Airline's aircraft accidents and the Indonesian, Korean, Chinese Aviation Law and the 1999 Montreal Convention

  • Kim, Doo-Hwan
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.30 no.2
    • /
    • pp.37-81
    • /
    • 2015
  • AirAsia QZ8501 Jet departed from Juanda International Airport in, Surabaya, Indonesia at 05:35 on Dec. 28, 2014 and was scheduled to arrive at Changi International Airport in Singapore at 08:30 the same day. The aircraft, an Airbus A320-200 crashed into the Java Sea on Dec. 28, 2014 carrying 162 passengers and crew off the coast of Indonesia's second largest city Surabaya on its way to Singapore. Indonesia's AirAsia jet carrying 162 people lost contact with ground control on Dec. 28, 2014. The aircraft's debris was found about 66 miles from the plane's last detected position. The 155 passengers and seven crew members aboard Flight QZ 8501, which vanished from radar 42 minutes after having departed Indonesia's second largest city of Surabaya bound for Singapore early Dec. 28, 2014. AirAsia QZ8501 had on board 137 adult passengers, 17 children and one infant, along with two pilots and five crew members in the aircraft, a majority of them Indonesian nationals. On board Flight QZ8501 were 155 Indonesian, three South Koreans, and one person each from Singapore, Malaysia and the UK. The Malaysia Airlines Flight 370 departed from Kuala Lumpur International Airport on March 8, 2014 at 00:41 local time and was scheduled to land at Beijing's Capital International Airport at 06:30 local time. Malaysia Airlines also marketed as China Southern Airlines Flight 748 (CZ748) through a code-share agreement, was a scheduled international passenger flight that disappeared on 8 March 2014 en route from Kuala Lumpur International Airport to Beijing's Capital International Airport (a distance of 2,743 miles: 4,414 km). The aircraft, a Boeing 777-200ER, last made contact with air traffic control less than an hour after takeoff. Operated by Malaysia Airlines (MAS), the aircraft carried 12 crew members and 227 passengers from 15 nations. There were 227 passengers, including 153 Chinese and 38 Malaysians, according to records. Nearly two-thirds of the passengers on Flight 370 were from China. On April 5, 2014 what could be the wreckage of the ill-fated Malaysia Airlines was found. What appeared to be the remnants of flight MH370 have been spotted drifting in a remote section of the Indian Ocean. Compensation for loss of life is vastly different between US. passengers and non-U.S. passengers. "If the claim is brought in the US. court, it's of significantly more value than if it's brought into any other court." Some victims and survivors of the Indonesian and Malaysia airline's air crash case would like to sue the lawsuit to the United States court in order to receive a larger compensation package for damage caused by an accident that occurred in the sea of Java sea and the Indian ocean and rather than taking it to the Indonesian or Malaysian court. Though each victim and survivor of the Indonesian and Malaysia airline's air crash case will receive an unconditional 113,100 Unit of Account (SDR) as an amount of compensation for damage from Indonesia's AirAsia and Malaysia Airlines in accordance with Article 21, 1 (absolute, strict, no-fault liability system) of the 1999 Montreal Convention. But if Indonesia AirAsia airlines and Malaysia Airlines cannot prove as to the following two points without fault based on Article 21, 2 (presumed faulty system) of the 1999 Montreal Convention, AirAsia of Indonesiaand Malaysia Airlines will be burdened the unlimited liability to the each victim and survivor of the Indonesian and Malaysia airline's air crash case such as (1) such damage was not due to the negligence or other wrongful act or omission of the air carrier or its servants or agents, or (2) such damage was solely due to the negligence or other wrongful act or omission of a third party. In this researcher's view for the aforementioned reasons, and under the laws of China, Indonesia, Malaysia and Korea the Chinese, Indonesian, Malaysia and Korean, some victims and survivors of the crash of the two flights are entitled to receive possibly from more than 113,100 SDR to 5 million US$ from the two airlines or from the Aviation Insurance Company based on decision of the American court. It could also be argued that it is reasonable and necessary to revise the clause referring to bodily injury to a clause mentioning personal injury based on Article 17 of the 1999 Montreal Convention so as to be included the mental injury and condolence in the near future.