Proceedings of the Korean Geotechical Society Conference
/
2005.03a
/
pp.745-750
/
2005
The demand of tunnels has been increased for the linear improvement of general national highway, and road construction and/or enlargement in Korea. Also, the collapses of tunnel portal slope have been increased in recent due to heavy rain caused by global warming. Therefore, it has been risen the requirement of system for the stability of tunnel portal slope in Korea as well as all over the world. The objective of this research is to develop an effective maintenance system for supervising the tunnel portal slope. This paper is a basic proposal to execute a survey on the current status and state of the tunnel portal slopes that were already installed along general national highways.
Jeong Kwan Sik;Park Ji Hoon;Kim Gun Ho;Lee Wan Jae
한국터널공학회:학술대회논문집
/
2005.04a
/
pp.359-371
/
2005
The Cutting slope is to be minimized when a tunnel meets the contour of slope terrain at a right angle around its portal. However, a tunnel portal has been generally installed at a right angle to the longitudinal axis of a tunnel with no consideration of the intersection angle with the slope terrain. This sometimes tended to cause huge cutting slope that resulted in many disadvantage in terms of safty, economy and environment. Therefore, the minimization of cutting slope is studied by taking the intersection angle into account, and the result is compared with that by the conventional method. In addition a design method for the inclined portal to the tunnel axis is proposed through 3D-FEM analysis, also the applicable ground condition is suggested.
On the basis of the geological conditions of high and steep mountainous slope on which an exit portal of an express railway tunnel with a bridge-tunnel combination is to be built, the composite structure of the exit portal with a bridge abutment of the bridge-tunnel combination is presented and the stability of the slope on which the express railway portal is to be built is analyzed using three dimensional (3D) numerical simulation in the paper. Comparison of the practicability for the reinforcement of slope with in-situ bored piles and diaphragm walls are performed so as to enhance the stability of the high and steep slope. The safety factor of the slope due to rockmass excavation both inside the exit portal and beneath the bridge abutment of the bridge-tunnel combination has been also derived using strength reduction technique. The obtained results show that post tunnel portal is a preferred structure to fit high and steep slope, and the surrounding rock around the exit portal of the tunnel on the high and steep mountainous slope remains stable when rockmass is excavated both from the inside of the exit portal and underneath the bridge abutment after the slope is reinforced with both bored piles and diaphragm walls. The stability of the high and steep slope is principally dominated by the shear stress state of the rockmass at the toe of the slope; the procedure of excavating rockmass in the foundation pit of the bridge abutment does not obviously affect the slope stability. In-situ bored piles are more effective in controlling the deformation of the abutment foundation pit in comparison with diaphragm walls and are used as a preferred retaining structure to uphold the stability of slope in respect of the lesser time, easier procedure and lower cost in the construction of the exit portal with bridge-tunnel combination on the high and steep mountainous slope. The results obtained from the numerical analysis in the paper can be used to guide the structural design and construction of express railway tunnel portal with bridge-tunnel combination on high and abrupt mountainous slope under similar situations.
Journal of Korean Tunnelling and Underground Space Association
/
v.15
no.5
/
pp.497-504
/
2013
This research uses numerical analysis to examine the tunnel portal landscape affecting the brightness level of interior lighting when designing lights for road tunnels through the L20 method. In order to extract the brightness recognition per form of a tunnel entrance and to evaluate the effects of the characteristics of the materials of facilities near a tunnel portal, brightness analysis was conducted by filming brightness on a video photometer called Hi-land Elf System, and a surface brightness photometer called LMK Mobile Advanced. Tunnels in Korea are mostly distributed in mountain areas; thus, the ratio occupied by the sky, which has the highest brightness within the angle of L20, is close to zero, while most of the ratio was occupied by brightness by the area near the tunnel entrance or road surface. However, for a tunnel portal retaing wall, which allows the width of a tunnel entrance to seem wider within the L20 angle, appeared to be have higher brightness compared to nearby areas or the surface, which is an element increasing the tunnel portal brightness within the tunnel, and the road facilities near the tunnel portal appeared to have an effect on the brightness as well. Thus, when designing tunnel lights based on brightness, the form of the tunnel entrance and the area width, material, and color of areas near the tunnel portal appeared to affect outside brightness and become an element affecting the establishment of the brightness level of the interior lights of tunnels. Consequently, reviewing such matters is a prerequisite when designing tunnel portal landscape.
Proceedings of the Korean Geotechical Society Conference
/
2006.03a
/
pp.925-930
/
2006
During the excavation of a tunnel portal, failure zones around the tunnel heading occur and also the ground supports itself. In a portal, its location and the ground characteristic have a great influence on the stability of the tunnel. Therefore, the failure mechanism of a tunnel heading and how to assess the stability of the tunnel are very important. In this paper, the numerical analyses were executed to evaluate the safety factor using strength reduction technique. The influence area of an excavation was also predicted through a case study in which no-support case and support case with the Pattern P-6 were compared in terms of the ground class and the shear strain.
A wind tunnel simulation requires high-performance computing power like supercomputers and deep knowledge of this subject. Those requirements make win tunnel simulation difficult. Grid technology will make these difficulties simpler by providing easy to use grid web portal. By using grid web portal, scientist can execute simulation and access to high-performance computing power without any serious difficulties. In this paper will present a grid web portal for a wind tunnel simulation that is used in Aerospace area.
Purpose: Recent development and advances in the arthroscopic surgical techniques for anterior cruciate ligament(ACL) reconstruction have led to the ideal location for more oblique anatomic point of the femur from 10 to 10:30 o'clock(in the right knee) and from 2 to 1:30 o'clock(in the left knee) in the frontal plane. This study was performed to compare the operative methods and the radiologic results of the femoral tunnels made through the tibial tunnel(trans-tibial approach) and the anteromedial portal. Materials and Methods: From January 2003 to May 2004, on hundred reconstructions of ACL were performed. Group I(the femoral tunnel made through the tibial tunnel) consisted of 50 cases and group I(the femoral tunnel made through the anteromedial portal) consisted of 50 cases. The operative methods and the radiographic results of the femoral tunnels were compared. Results: Femoral tunnel was made more easily at more oblique anatomic point in group II than in group I. In group II, better visual field was achieved at the angle of 100? flexion of the knee joint, the risks of the posterior cortical breakage and the tunnel-graft mismatching were reduced more, and the divergence of femoral interference screw from the radiograph decreased more than in group I(p<0.05). The angle between the femoral tunnel and the longitudinal axis of ACL increased in group II. Conclusion: Anteromedial portal technique was useful for femoral tunneling toward 10 to 10:30 o'clock(in the right knee) and 2 to 1:30 o'clock(in the left knee) in ACL reconstruction. Level of Evidence:Level III, case-control study.
Recently, planning road construction in South Korea is focused on upgrading of the existing road by rerouting or restructuring. For this, roads under current construction in Korea go for more straight in its alignments and routing. Straight routing makes it all the more required to construct many mountain tunnels and bridges in Korea where mountains are so widely spread. Some portal of mountain tunnel is not rarely planed at high steep slope of mountain valley where it is not easy to secure working space for tunnel excavation. Reverse excavation is an alternative measure for excavation of tunnel portal at high steep slope. Construction in reverse excavation method has three important points requiring careful consideration: 1)planning of pilot tunnel in proper width, height, and length etc., 2)measure against the effect of one-side earth pressure to the direction of tunnel portal, 3)securing tunnel safety against shallow ground condition at portal zone. This paper intends to suggest applicable range of pilot tunnel for reverse excavation at the portal zone located at high steep slope, and shows result of study on the appropriateness of a reverse excavation by means of 3D numerical analysis. Result of 3D numerical analysis for reverse excavation at high steep slope shows that pilot tunneling will be applicable to start from the point $20{\sim}25m$ before the portal from inside the tunnel.
Journal of Korean Tunnelling and Underground Space Association
/
v.2
no.2
/
pp.50-61
/
2000
The ground around the portal of a tunnel is the most typical part showing the 3-dimensional mechanical behavior in the tunnel. The portal slope is constructed at the weathered soft rock-mass, and remains as a potential sliding mass. The slope failure around the tunnel portal may happen drastically and induce the great disaster; hence, for the permanent stability several special techniques are required. To solve this problem, the ground around the tunnel portal may be excavated in the arch shape to develop the arching effect in horizontal direction. With the arch-type portal slope, one can reduce considerably the excavation mass and the damage of environments. This approach has not been attempted yet due to the lack of understanding and the well-defined analyzing method, so the retaining wall type portal is more universal. The 3-dimensional finite element analyses were carried out to prove that the arch type is more advantageous in safety and cost than the right angle type. The influence of the tunnel construction sequence and the strength of the rock-mass on the slope stability was investigated by focusing on the maximum shear strain in the slope, and the yield zone at the tunnel face.
Journal of Korean Tunnelling and Underground Space Association
/
v.6
no.3
/
pp.213-225
/
2004
The number of tunnels are in fact increasing as a part of linear improvement project of general national highway and road enlargement and pavement project. Recently, collapses of portal slope are also occurring considerably, due to local raining from severe rain storm and abnormal weather. Accordingly, it was risen a necessity to efficiently respond to tunnel portal slope damage and maintenance in Korea and oversea nations. This paper is a basic proposal to execute a survey on the current status and state of the tunnel portal slopes that were already installed and are now being operated along general national highways, and also to execute state evaluation for the purpose of managing those effectively. As a research method, domestic tunnels were analyzed in accordance with geometrical shape such as access type, portal form, and tunnel type, etc. via field survey to analyze the types of tunnel portal slopes along national highways. State evaluation classification sheet is presented to divide classes for the danger state of the surveyed portal slopes, and then the related grades are divided. It is mainly aimed at classifying the tunnel portal slope along national highways with using this state evaluation, to use it as basic data so that continuous maintenance can be executed in the future in accordance with danger classes.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.