• Title/Summary/Keyword: TP Removal

Search Result 234, Processing Time 0.029 seconds

Control of Cyanobacteria and Phytoplankton Using Physico-chemical Methods (물리·화학적 방법을 이용한 Cyanobacteria와 식물 플랑크톤의 제어)

  • Jheong, Weon-Hwa;Jeon, Eun-Hyung;Ahn, Tea-Young
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.7 no.5
    • /
    • pp.75-84
    • /
    • 2004
  • Loess, PAC, MACF and plants were applied to the control of the phytoplankton bloom in laboratory and in field, In field experiment using oil fence, 5ppm concentration of coagulant(PAC) was observed to be effective in controlling the cyanobacterial bloom, resulting in 90% removal of cyanobacteria and phytoplankton from the water column, hi case of Synedra sp., however, only 50% of biomass decreased with the same PAC concentration. MACF(micro-air bubble coagulation and floating), a kind of physicochemical method, was applied to the column of the Kyongan stream and resulted in over 80% chlorophyll a and 73.5% TP removal, Chlorophyll a and total phosphorus were effectively removed from water body when 2.0 g/L of loess with the particle radius of 125 ${\mu}m$ was inputted. In case of experiments involving plants, big cone pine, gingko, and pine needle were observed to be effective in restraining phytoplankton bloom at 0.5g/200ml level. During a field test done at Kyungan stream, where Microcystis heavily occurred, Pine needle and big cone pine were observed to be effective on suppressing algal growth.

Development of Up- and Down-flow Constructed Wetland for Advanced Wastewater Treatment in Rural Communities (소규모 오수발생지역의 고도처리시설을 위한 상.하 흐름형 인공습지 개발)

  • Kim, Hyung-Joong;Yoon, Chun-G.;Kwun, Tae-Young;Jung, Kwang-Wook
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.48 no.6
    • /
    • pp.113-124
    • /
    • 2006
  • The feasibility of the up- and down-flow constructed wetland was examined fur rural wastewater treatment in Korea. Many constructed wetland process was suffered from substrate clogging and high plant stresses because of long term operation. The up- and down-flow constructed wetland process used porous granule materials (charcoal pumice : SSR=10:20:70) for promoting intake rate of nutrient to plant, and especially flow type was designed continuously repeating from up-flow to down-flow. $BOD_5$ and SS was removed effectively by the process with the average removal rate being about 75% respectively. The wetland process was effective in treating nutrient as well as organic pollutant. Removal of TN and TP were more effective than other wetland system and mean effluent concentrations were approximately 7.5 and $0.4mg\;L^{-1}$ which satisfied the water quality standard for WWTPs. The treatment system did not experience any clogging or accumulations of pollutants and reduction of treatment efficiency during winter period because constructed polycarbonate glass structure prevented temperature drop. Considering stable performance and effective removal of pollutant in wastewater, low maintenance, and cost-effectiveness, the up- and down-flow constructed wetland was thought to be an effective and feasible alternative in rural area.

A Study on a Small-scale Wastewater Treatment System Using MBR and IPNR (MBR과 IPNR을 이용한 소규모 하수처리 시스템에 관한 연구)

  • Kim, Young-Hee;Jo, Eun-Young;Yeo, In-Seol;Park, Seung-Min;Park, Chan-Gyu
    • The KSFM Journal of Fluid Machinery
    • /
    • v.18 no.2
    • /
    • pp.37-42
    • /
    • 2015
  • In the purpose of this study, we investigate the characteristics of the pilot-scale wastewater treatment system applied to BAF, MBR and IPNR as examining the removal efficiency of organic pollutants and operating factors in small decentralized wastewater treatment systems, and operating factors. For long-term operation period of more than nine months, pilot-scale plant operating results appeared very stable. This results were the removal efficiency of BOD was 80.3% above and removal efficiency of COD with an average of about 91.0%, satisfied the final effluent water quality standards. TN in the final effluents was the average concentration of 7.9 mg/L, was satisfactory water quality standards 10 mg/L of TN.

Survey of Physicochemical Methods and Economic Analysis of Domestic Wastewater Treatment Plant for Advanced Treatment of Phosphorus Removal (총인 수질기준강화를 위한 국내 하수종말처리장의 물리화학적처리 특성조사 및 경제성 분석)

  • Park, Hye-Young;Park, Sang-Min;Lee, Ki-Cheol;Kwon, Oh-Sang;Yu, Soon-Ju;Kim, Shin-Jo
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.33 no.3
    • /
    • pp.212-221
    • /
    • 2011
  • Wastewater treatment plants (WWTPs) are required to meet the reinforced discharge standards which are differentiated as 0.2, 0.3 and 0.5 mg-TP/L for the district I, II and III, respectively. Although most of WWTPs are operating advanced biological phosphorus removal system, the supplementary phosphorus treatment facility using chemical addition should be required almost at all WWTPs. Therefore, water quality data from several exemplary full-scale plants operating phosphorus treatment process were analyzed to evaluate the reliability of removal performance. Additionally, a series of jar tests were conducted to find optimal coagulants dose for phosphorus removal by chemical precipitation and to describe characteristics of the reaction and sludge production. Chemical costs and the increasing sludge volume in physicochemical phosphorus removal process were estimated based on the results of jar tests. The minimum coagulant (aluminium sulfate and poly aluminium chloride) doses to keep TP concentration below 0.5 and 0.2 mg/L were around 25 and 30 mg/L (as $Al_2O_3$), respectively, in the mixed liquor of activated sludge. In the tertiary treatment facility, relatively lower coagulant doses of 1/12~1/3 the minimum doses for activated sludge were required to achieve the same TP concentrations of 0.2~0.5 mg/L. Increase in suspended solids concentration due to chemical precipitates in mixed liquor was estimated at 10~11%, compared to the concentration without chemical addition. When coagulant was added into mixed liquor, chemical (aluminium sulfate) cost was estimated to be 4~10 times higher than in secondary effluent coagulation/separation process. Sludge production to be wasted was also 4~10 times higher than secondary effluent coagulation/separation process.

Assessment of Performances of Low Impact Development (LID) Facilities with Vegetation (식생이 조성된 LID 시설의 효율 평가)

  • Hong, Jung Sun;Kim, Lee-Hyung
    • Ecology and Resilient Infrastructure
    • /
    • v.3 no.2
    • /
    • pp.100-109
    • /
    • 2016
  • Low impact development (LID) facilities are established for the purpose of restoring the natural hydrologic cycle as well as the removal of pollutants from stormwater runoff. Improved efficiency of LID facilities can be obtained through the optimized interaction of their major components (i.e., plant, soil, filter media, microorganisms, etc.). Therefore, this study was performed to evaluate the performances of LID facilities in terms of runoff and pollutant reduction and also to provide an optimal maintenance method. The monitoring was conducted on four LID technologies (e.g., bioretention, small wetlands, rain garden and tree box filter). The optimal SA/CA (facility surface area / catchment area) ratio for runoff reduction greater than 40% is determined to be 1 - 5%. Since runoff reduction affects the pollutant removal efficiency in LID facilities, SA/CA ratio is derived as an important factor in designing LID facilities. The LID facilities that are found to be effective in reducing stormwater runoff are in the following order: rain garden > tree box filter > bioretention> small wetland. Meanwhile, in terms of removal of particulate matter (TSS), the effectiveness of the facilities are in the following order: rain garden > tree box filter > small wetland > bioretention; rain gardens > tree box filter > bioretention > small wetland were determined for the removal of organic matter (COD, TOC), nutrients (TN, TP) and heavy metals (Cu, Pb, Cd, Zn). These results can be used as an important material for the design of LID facilities in runoff volume and pollutant reduction.

Water Quality Improvement by Natural Wetland (습지에 의한 수질개선 효과)

  • Kim, Bom-Chul;Kim, Ho-Sub;Jun, Man-Sig;Hwang, Gil-Son
    • Korean Journal of Ecology and Environment
    • /
    • v.33 no.3 s.91
    • /
    • pp.295-303
    • /
    • 2000
  • The water clarification efficiency was examined in a shallow wetland where dense vegetation was formed naturally in an abandoned paddy field. And, also two enclosure experiments were carried out to measure the effects of materials exchange between sediment and the overlying water with the existence of vegetation and accumulated litter. The hydraulic retention time of wetland was regulated in 1.2 day. The removal rates of SS (56%) and $NO_3-N$ (61%) were high, considering its short retention time. However, removal efficiencies of VSS (28%), COD (14%), DOC (1%),and TP (0.2%) were relatively lower. This low removal efficiencies were thought to be due to the release of dissolved form of organic matter and phosphorus from the sediment. Most of constituents except nitrate were higher in the enclosure at the beginning of enclosure installation than that of the outflowing water from wetland. And then, it has fluctuated and decreased with time. The wetland was in equilibrium state of settling, accumulation of organic debris, and regeneration of dissolved material from sediment. So ultimately high primary production by dense vegetation in the wetland may be the reason of unfavorable or low treatment efficiency of wetland after many years of operation for wastewater treatment. However, the water quality of effluent from the wetland showed smaller variation and better condition than that of inflow, especially during storm events. It can be concluded that this wetland is suitable for the improvement of water quality from nonpoint sources.

  • PDF

Early Stage Performance of Constructed Wetland System for Nonpoint Source Pollution Control (비점원오염 제어를 위한 인공습지의 초기단계 연구)

  • Kim, Hyung-Chul;Ham, Jong-Hwa;Han, Jung-Yoon;Yoon, Chun-Gyeong
    • Korean Journal of Ecology and Environment
    • /
    • v.39 no.4 s.118
    • /
    • pp.481-488
    • /
    • 2006
  • The field scale experiment was performed to examine the performance of the constructed wetland for nonpoint source (NPS) pollution loading reduction. Four sets (0.88 ha each) of wetland and pond system were used. After three growing seasons of the wetland construction, plant coverage increased to about 90% even without plantation from bare soil surfaces at the initial stage. During the start up period of constructed wetlands, lower water levels should be maintained to avoid flooding newly plants, if wetland plants are to start from germinating seeds. The average removal rate of $BOD_5$, TSS, T-N and T-P during the first two years was 5.6%, 46.6%, 45.7%, and 54.8%, respectively. The $BOD_5$ removal rate was low and it might be attributed to the low influent concentration. The early stage of wetland performance demonstrated the effectiveness of water quality improvement and was satisfactory for treating polluted stream waters. From the first-order analysis, T-P was virtually not temperature dependent, and $BOD_5$ and TSS were more temperature dependent than T-N. A pond-wetland system was more effective than a wetland-pond or a wetland alone system in water quality improvement, particularly to reduce T-P. Overall, the wetland system was found to be an adequate alternative for treating a polluted stream water with stable removal efficiency and recommended as a NPS control measures.

Correlation Analysis on the Runoff Pollutants from a Small Plot Unit in an Agricultural Area

  • Kang, Meea;Choi, Byoung-Woo;Lee, Jae-Kwan
    • Environmental Engineering Research
    • /
    • v.15 no.4
    • /
    • pp.191-195
    • /
    • 2010
  • This study was carried out to investigate the important factors relating to runoff and pollutant loads in a plot unit located in an agricultural area. Of the precipitation parameters, such as total precipitation, days since last rainfall (ADD, the rainfall was more than 10mm) and average rainfall intensity on runoff, the strongest effect was obtained due to total precipitation, but the rainfall intensity showed a slightly positive correlation. It was expected that both variables, i.e. total precipitation and rainfall intensity, would lead to the generation of greater runoff. In contrast, runoff was negatively correlated with ADD, which is understandable because more infiltration and less runoff would be expected after a long dry period. The TSS load varied greatly, between 75.6 and $5.18{\times}10^4g$, per event. With the exception of TN, the TSS, BOD, COD and TP loads were affected by runoff. The correlations of these items were proportional to the runoff volume, with correlation coefficients (r) greater than 0.70, which are suitable for use as NPS model data. The TSS load showed very good relationships with organics (BOD & COD) and nutrients (TN & TP), with correlation coefficients greater than 0.79. Therefore, the removal of TSS is a promising factor for protecting water basins.

Unit Mass Estimation and Analysis from Textile Spinning/Weaving Manufacturing Facility Nearby Nakdong River Basin (낙동강 수계에서 제사방적제조 업체에 대한 공정별 원단위산정 및 분석)

  • Lee, Hongshin;Son, Gontae;Gu, Jungeun;Konboonraksa T.;Lee, Hongtae;Lee, Seunghwan
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.22 no.5
    • /
    • pp.541-550
    • /
    • 2008
  • In this investigative study, the unit mass discharge for the major water quality parameters such as flowrate, SS, BOD, CODmn, CODcr, TN, TP from textile spinning/weaving industry nearby Nakdong river basin was estimated. To represent the respective industries, three companies from hundreds of textile spinning/weaving industries located in Nakdong river basin was carefully selected based on its manufacturing goods, flowrate and location for the estimation of unit mass discharge based on unit operation and process. There was a drastic decrease of unit mass discharge estimation between influents and effluents of water quality parameters, which represents the removal capacity of wastewater treatment plant. With the advent of new regulation on the imposed payment proportional to the total amount of pollutants discharge into the water body, the concept of cleaner production technology should be employed in the unit operation/process in wastewater treatment plant as well as textile manufacturing procedure to minimize the levy on the pollutants discharge. Unit mass discharge estimations of unit process (estimated in this study) in major water quality parameters (SS, BOD, COD, TN and TP) based on land were similar to those of composite process (estimated by National Institute of Environmental Research). But the unit mass discharge estimations of unit process in BOD and CODmn based on total sale were much higher than those of composite one while in SS, TN and TP similar to each other. For the detailed estimation of the imposed payment, unit mass estimation based on unit process should be further emphasized.

Evaluation of Treatment Efficiencies of Water Quality for 5 years in Constructed Wetland to Upper Region of Water Source (상수원 상류지역 인공습지의 5년간 수질 정화효율 평가)

  • Park, Jong Seok;Kim, Kang Seok;Kim, Yong Chan;Rhee, Kyoung Hoon
    • Journal of Wetlands Research
    • /
    • v.14 no.4
    • /
    • pp.479-488
    • /
    • 2012
  • This study evaluates treatment efficiencies of pollutants in Boknae bio-park constructed wetlands surrounding Juam Lake for 5 years from January 2006 to December 2010, in order to treat non-point pollutants effectively. The analysis of monthly treatment efficiency of pollutants shows that the scope of BOD is -19.11~37.72%, and of COD is 30.14~27.38%, thus the monthly deviation COD is relatively higher than BOD, and the scope of SS is -54.07~64.82%. Moreover, the analysis of seasonal treatment efficiency of pollutants shows that the treatment efficiency of TN is higher than 36.8% on average for 5 years in the spring and winter, and of TP relatively lower than other pollutants, however, the seasons don't make much difference to the treatment efficiency of TP.