• 제목/요약/키워드: TMDL evaluation

검색결과 31건 처리시간 0.026초

오염총량평가를 위한 부하지속곡선 개발 및 적용 (Development of Load Duration Curve Methodology for TMDL Evaluation)

  • 강두기;강순구;김상단;신현석
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2007년도 학술발표회 논문집
    • /
    • pp.652-656
    • /
    • 2007
  • The major streams in South Korea have established the TMDL(Total Maximum Daily Loads) regulation for just 4 years. Traditional concepts in water quality management in South Korea are based upon the selection of a design streram flow which is 10-year averged flow exeedance probability 75%(Q275). That is, a single flow value based upon average long term flow conditions is chosen for application in dilution calculations, permit design, water quality modeling, etc. While these TMDLs seems to satisfy the requirement of the target water quality regulations, they have contributed little to any watershed/waterbody assessment and restoration plans. These types of TMDLs do little to characterize the problems the TMDLs are intended to address. For TMDLs to be more beneficial in the assessment and implementation process, TMDLs should reflect adequate water quality across flow conditions rather than at a single flow value such as average daily flow. In this paper, we developed LDC (load duration curve) methodology for theevaluation of Korean TMDL evaluation based on watershed scaled, physically based on SWAT(Soil and Water Assessment Tool) model.

  • PDF

경안천 유역 수질 및 이행평가 자료를 통한 임의적 오염총량관리제도 시행의 성과 분석 (Effects of the Voluntary Scheme of Total Maximum Daily Load based on Water Quality and Annual Evaluation data in the Gyeongan Watershed, South Korea)

  • 이범연;이창희
    • 한국물환경학회지
    • /
    • 제37권4호
    • /
    • pp.263-274
    • /
    • 2021
  • This study presents the achievements and limitations of the voluntary-based Total Maximum Daily Load (TMDL) through statistical analysis of water quality monitoring data and performance assessments of TMDL plans implemented in the Gyeongan watershed. The results clearly showed that responsible local governments complied the allocated TMDL and the designated water quality goals were successfully achieved in the required period. This was possible because the Ministry of Environment provided innovative incentives, such as, relaxations of the existing tight land-use regulations and full-scale financial aids for constructing and operating public treatment facilities to draw local government voluntary participation. However, a couple of problems which decreased the effectiveness and efficiency of the voluntary TMDL were identified. The different TMDL implementation schedules between upstream (Yongin) and downstream (Gwangju) governments caused delay in water quality improvement and exaggerated TMDL allocation to the local development which made excessive investment in the treatment facilities. Although it is not directly related to the voluntary scheme, technical methods for establishing and assessing the water quality goals should be improved so that the effects of flow conditions on water quality are properly assessed. We expect that results of this case study contribute to developing a more effective voluntary-based scheme for the implementation of the so-called 'tributary TMDL' in the future.

수질오염총량관리 단위유역 유량그룹별 수체 손상 분석 (Research on the Evaluation of Impaired Waterbody using the Flowrate Group at TMDL Unit Watershed in Nakdong River Basin)

  • 황하선;김상수;김진이;박배경
    • 한국물환경학회지
    • /
    • 제28권6호
    • /
    • pp.933-942
    • /
    • 2012
  • The purpose of this study is to evaluate the degree of waterbody impairment according to the flow conditions and present to the appropriate water quality improvement alternatives using observed water quality and flow for Total Maximum Daily Load (TMDL) implementation at 39 unit watersheds the nakdong river basin. Observed water quality data for 7 years are divided into five cumulative flow frequency group and comparing the each observed water quality data and TMDL Target water quality (TWQ) the last evaluate the water quality is impaired group. We found that the cumulative flow frequency group-specific the average excess rate of V group was the highest (32.86%), followed by the IV group (26.04%), group III (23.36%), II group (22.67%), I group (20.70%), the degree of impaired waterbody tended to be inversely proportional to the flow rate. Resulted from cumulative flow frequency group of impaired water quality assessment, 13 unit watersheds are impaired from a group IV and group V affected by point sources. Therefore, improvement of sewage discharge and the initial composition of the riparian buffer zone are needed. Nakbon F, Namkang D and Namkang E within 13 unit watersheds are impaired from group II and III affected by non-point sources. Therefore, application of Best Management Practices (BMPs) is needed for these watersheds. Evaluation of impaired waterbody using Cumulative flow frequency group is able to determine the extent of the judgment to TWQ exceeded by the flow conditions and helps proper setting Standard flow and planning pollutant reduction for TMDL.

총량관리 단위유역 평가기법을 활용한 서울특별시 주요 유입 지천의 수질개선효과에 관한 연구 (A Study on the Water Quality Improvement of Major Tributaries in Seoul, Applying Watershed Evaluation Techniques)

  • 심규현;김경훈;임태효;김용석;김성민
    • 한국물환경학회지
    • /
    • 제37권1호
    • /
    • pp.32-46
    • /
    • 2021
  • South Korea has been divided into quantities and water quality, and due to a revision of the Government Organization law in June 2018, the controversial water management system was integrated into the Ministry of Environment. The total Maximum Daily Loads System has been called the flower of water quality control, and since 2004, all three major river systems which have been introduced into the Han River system, despite its various difficult environments, and subsequently leading to all of the four major rivers undergoing obligatory implementation since 2013. Currently, the target TMDL (Han River Phase 1 and Other Water Systems Phase 3) for the 2020 stage has been implemented. The domestic TMDL established a basic plan for calculating the load which complies with the unit watershed's target water quality, as well as an implementation plan for annual load management, both which have been institutionalized in order to evaluate load compliance on a repeated annual basis. Local governments ask external organizations to conduct investigations every year in order to assess the transition, which thereby requires tens of millions of won every year. Therefore, an assessment and management model that can be easily operated at the TMDL personnel level is required. In this study, when the Han river Water System TMDL was implemented in earnest, we confirmed the the water quality improvement effect when TMDL was introduced to major inflow tributaries (TancheonA, JungnangA, AnyangA) under the Seoul City's jurisdiction through the use of the total amount control unit basin evaluation technique. By presenting customized management measures, we propose the guidelines that are necessary for determining more effective water environmental policies.

부하지속곡선과 유량-부하량 상관곡선을 이용한 낙동강 유역의 오염총량평가 (TMDL Evaluation of Nakdong River Basin Using Load Duration Curve and Streamflow-Load Rating Curve)

  • 손태석;주재승;박재범;신현석
    • 대한토목학회논문집
    • /
    • 제31권5B호
    • /
    • pp.475-481
    • /
    • 2011
  • 유역관리제도로써 시행 중인 현재의 수질오염총량관리제도의 기준유량은 과거 10년 평균저수량을 적용하고 있으며, 오염총량관리 이행평가는 단위유역별 목표수질을 만족할 수 있는 부하량에 대한 관리를 통해 시행되고 있다. 현재의 단순화되고 평균화된 개념의 기준유량을 이용한 단위유역별 부하량 할당과 관리는 목표수질 달성이라는 규제 기준을 달성하기 위한 관리측면에서의 편리성은 있으나 유역관리를 통한 유역 혹은 수체의 건전한 회복과 평가를 통해 문제점을 도출하고 해결하고자 하는 근본적인 유역관리의 역할은 미흡하다. 동일한 수질 농도를 유지, 관리하기 위해서는 매시간, 매일 변동하는 유량, 즉 전체유량을 고려한 부하량 관리를 통해서만 하천 생태계의 건강성을 유지할 수 있으며 이를 위해서는 전체 유량 규모를 고려해야 한다. 전체 유량 규모를 고려한다는 의미는 자연 현상인 강우-유출에 의해 다양하게 변동되는 유량과 인위적인 조절 유량 등을 고려한 오염총량관리 기준 설정과 이러한 양상을 반영한 과학적, 합리적인 평가가 가능하다는 의미이다. 이에 본 연구에서는 전체 유량 규모가 고려되는 유량-부하량 상관곡선을 이용한 오염총량평가 기법을 개발하고 이를 낙동강 수질오염총량관리 단위유역에의 실적용을 통해 문제점과 개선방향을 도출하고 본 기법의 국내 오염총량관리의 부하량 할당 및 이행평가에의 적용 가능성을 평가하였다.

수질오염총량제도 유역의 수질 및 부하량 평가를 위한 웹기반 LDC 시스템의 적용 (Application of Web-based Load Duration Curve System to TMDL Watersheds for Evaluation of Water Quality and Pollutant Loads)

  • 강현우;류지철;신민환;최중대;최재완;신동석;임경재
    • 한국물환경학회지
    • /
    • 제27권5호
    • /
    • pp.689-698
    • /
    • 2011
  • In South Korea, Total Maximum Daily Load (TMDL) has been enforced since 2004 to restore and manage water quality in the watersheds. However, the appraisal of TMDL in South Korea has lots of weaknesses to establish the plan for recovery of water quality because it just evaluates the target water quality during the particular flow duration interval. In the United States, Load Duration Curve (LDC) method bas been widely used in the TMDL to evaluate the water quality and pollutant loads considering variation of stream flow. In a recent study, web-based Load Duration Curve system was developed to create the LDC automatically and provide the convenience of use. In this study, web-based Load Duration Curve system was applied in the Gapyeongcheon watershed using the daily flow and 8-day interval water quality data, and Q-L Rating Curve was used to evaluate the water quality and pollutant load in the watershed, also. As a result of study, water quality and pollutant load in Gapyeongcheon watershed were met with water quality standard and allocated load in the all flow durations. Web-based Load Duration Curve system could be applied to the appraisal of South Korean TMDL because it can be used to judge the impaired flow duration and build up the plan of load reduction, and it could enhance the publicity. But, web-based Load Duration Curve system should be enhanced through addition of load assessment tools such as Q-L rating curve to evaluate water quality and pollutant load objectively.

수질오염총량 단위유역의 유량조건별 수체 손상 평가를 위한 부하지속곡선 적용성 연구 (Application Load Duration Curve for Evaluation of Impaired Watershed at TMDL Unit Watershed in Korea)

  • 황하선;윤춘경;김지태
    • 한국물환경학회지
    • /
    • 제26권6호
    • /
    • pp.903-909
    • /
    • 2010
  • The purpose of this study was evaluated on the applicability of Load Duration Curve Method (LDC Method) using HSPF watershed model and sampling data for efficient TMDLs in Korea. The LDC Method was used for assessment pollutant characteristics in watershed and water quality variation in each water flow level. Load Duration Curve is applied for judge the level of impaired water-body and can be estimated the impaired level by pollutant, such as BOD, T-N, and T-P in this study depending on variation of stream flow. As a result, BOD, T-P was usually exceed the standard value at low flow and dry hydrologic period. Improvement of effluent concentration from WWTP and riparian buffer protection zone are effective to improve the water quality. T-N showed the worst condition at mid-range hydrologic period and moist hydrologic period. Therefore, soil erosion control program and BMPs for non-point source pollution control is effective for recovery the water quality, which can be useful method for management of water quality in the plan of recovery water quality spontaneously. Applicability of LDC Method was evaluated in the Nakbon A watershed. However, we need to consider more detailed and accumulated data set such as accurate GIS data and detail pollution data, and WWTP discharge water quality data for accurate evaluation of watershed. Overall, The LDC Method is adequate for evaluation of watersheds characteristics, and its application is recommended for watershed management and TMDL Implementation.

LID/BMPs 효과분석을 위한 LIDMOD2 개발 (LIDMOD2 Development for Evaluation of LID/BMPs)

  • 전지홍;최동혁;나은혜;박찬기;김태동
    • 한국물환경학회지
    • /
    • 제26권3호
    • /
    • pp.432-438
    • /
    • 2010
  • LIDMOD2 was developed for evaluation of low impact development (LID) and best management practice (BMP) by modification of Site Evaluation Tool (SET). The modification includes employment of SCS-CN method for annual runoff simulation, unit load method for annual pollutant loads simulation, and the method proposed by Korean TMDL for calculating pollutant reduction by BMPs. The CN values were updated with regionalized parameters within Nack-Dong River basin because these are important parameters for simulating hydrology. LIDMOD2 was tested by applying to Andong Bus terminal. As a simulation results, pollutant loads and surface runoff will be significantly increased by post-development without LID compared with those from pre-development. LID technique was simulated to efficiently reduce surface runoff and pollutant load and increase infiltration. LIDMOD2 is screening level tool and easy to use because LIDMOD2 is based on spread sheet and most of parameters are regionalized. LIDMOD2 was illustrate that it could evaluate LID well by summarizing and graphing annual hydrology, annual pollutant loading, and hydrograph for event storm. The calculation methods related with pollutant loads are employed from the guideline of Korean TMDL and it can be useful tool for Korean TMDL to evaluate the effect of LID/BMP on developing area.

수질오염총량관리 단위유역 장기유황곡선 구축 -낙동강수계를 대상으로- (Development of Long Term Flow Duration Curves for the Management of Total Maximum Daily Loads - in the Nakdong River Basin -)

  • 김경훈;권헌각;안정민;김상훈;임태효;신동석;정강영
    • 한국환경과학회지
    • /
    • 제26권8호
    • /
    • pp.939-953
    • /
    • 2017
  • For the development of flow duration curves for the management of 41 Total Maximum Daily Load (TMDL) units of the Nakdong River basin, first, an equation for estimating daily flow rates as well as the level of correlation (correlation and determination coefficients) was extrapolated through regression analysis of discrete (Ministry of Environment) and continuous (Ministry of Land, Infrastructure and Transportation) measurement data. The equation derived from the analysis was used to estimate daily flow rates in order to develop flow duration curves for each TMDL unit. By using the equation, the annual flow duration curves and flow curves, for the entire period and for each TMDL unit of the basin, were developed to be demonstrated in this research. Standard flow rates (abundant-, ordinary-, low- and drought flows) for major flow duration periods were calculated based on the annual flow duration curves. Then, the flow rates, based on percentile ranks of exceedance probabilities (5, 25, 50, 75, and 95%), were calculated according to the flow duration curves for the entire period and are suggested in this research. These results can be used for feasibility assessment of the set values of primary and secondary standard flow rates for each river system, which are derived from complicated models. In addition, they will also be useful for the process of implementing TMDL management, including evaluation of the target level of water purity based on load duration curves.

낙동강수계 수질오염총량관리를 위한 유량조사 평가 (Evaluation on Actual Discharge Data for TMDL in Nakdong River Basin)

  • 김경훈;김용석;박배경;윤종수;신찬기
    • 환경위생공학
    • /
    • 제23권4호
    • /
    • pp.65-71
    • /
    • 2008
  • To drive efficiently total water pollution load management, needs to calculate the exact load emissions, pollution load allocation and implementation evaluation in each unit area of watershed and accurate and regular flow of data. For these reasons, the Nakdong River TMDL Research Center has produced directly or indirectly in the average interval of eight days (30 times or more / year) 41 points for unit area of the total water pollution load management and 8-point of municipal requirement for a total of 49 branches as a flow data in 2004 from August. This acquired the survey flow is evidence of trends and changes each point in the Nakdong River based on time, such as 10 years based on average design flow available to the foundation of the summit as the major water policy is to be utilized. This study was performed on actual discharge measuring data and introduced performance results each drainage basin of Nakdong River from 2004 to 2008 over the total of past five years.