Lee, Hoseong;Kim, Changyong;Lee, Sean S.;Kim, Seungjun;Lee, Kyeongjin
Journal of Korean Tunnelling and Underground Space Association
/
v.20
no.2
/
pp.469-483
/
2018
Steel bars have been widely used as the primary reinforcement for Precast Segmental Concrete Lining for TBM Tunnels. Previously, studies have been carried out to gauge the potential for steel fiber reinforcement to replace the use of steel bar reinforcements in the segmental lining to reduce the amount of the steel bar reinforcement. Steel fiber reinforcements have been investigated and widely applied to SFRC TBM linings to improve the constructability of SFRC TBM linings worldwide. However, the steel fiber reinforcement often caused punctures to the water membranes inside tunnel lining and had long-term durability deterioration issues caused by steel corrosion, as well as cosmetic problems. Therefore, this paper sought to gauge the potential of synthetic fiber reinforcements, which have proven to be very attractive substitutes for steel fiber reinforcements. This study analyzed the performance of both steel and synthetic fiber reinforcements in segmental linings and evaluated the applicability of the fiber reinforcements to the TBM Precast Concrete Segmental Linings of TBM tunnels. As a conclusion, this study demonstrates that the potential use of steel and synthetic fibers in various combination, can substitute the rebar reinforcement in the concrete mix for segmental concrete linings.
Kim, Jeong-Ju;Ryu, Hui-Hwan;Kim, Gyeong-Yeol;Hong, Seong-Yeon;Jeong, Ju-Hwan;Bae, Du-San
Journal of Korean Tunnelling and Underground Space Association
/
v.22
no.6
/
pp.623-641
/
2020
About 5 km length of tunnels were constructed by mechanized tunnelling method using closed type shield TBM. In order to avoid construction delay problems for ensuring timely electricity transmission, it is necessary to increase the prediction accuracy of the excavation process involving machines according to rock mass types. This is important to corroborate the project duration and optimum operation for various considerations involved in the machine. So, full-scale tunnelling tests were performed for developing the advance rate model to be appropriately used for 3.6 m diameter shield TBM. About 100 test cases were established and performed using various operational parameters such as thrust force and rotational speed of cuttterhead in representative uniaxial compressive strengths. Accordingly, relationships between normal force and penetration depth and, between UCS and torque were suggested which consider UCS and thrust force conditions according to weathered, soft, hard rocks. Capacity analysis of cutterhead was performed and optimum operational conditions were also suggested based on the developed model. Based on this study, it can be expected that the project construction duration can be reduced and users can benefit from the provision of earlier service.
Soo-Jin Lee;Hyeon-Do Kim;Yong-Woo Kim;Sang-Hwan Kim
Journal of Korean Tunnelling and Underground Space Association
/
v.26
no.3
/
pp.243-254
/
2024
Currently, due to industrial development in domestic regions, buildings are saturated not only in major city centers but also in surrounding urban areas. Accordingly, people's attention has focused on underground spaces, and tunnels are being widely used, especially in urban development. Research on tunnels and tunnel excavation methods is actively underway. However, there is a lack of research on the wear and tear problems of sludge discharge pipes when using a slurry shield TBM. Therefore, in this paper, the L-shaped bend pipe used in the existing sludge discharge pipe was transformed into a T-shaped bend pipe to move sludge. As a result, it was confirmed that compared to the L-shaped bend pipe, the impact of the T-shaped bend pipe on the bend pipe when discharging sludge was reduced. Based on these results, it is expected that wear of the sludge discharge pipe can be minimized by using a T-shaped bend pipe when using slurry shield TBM equipment. This is expected to ultimately lead to economic benefits, such as reducing costs due to replacement of curved pipes or additional welding during tunnel construction.
Journal of Korean Tunnelling and Underground Space Association
/
v.19
no.6
/
pp.973-984
/
2017
There is a growing need to apply TBM tunnelling method for the construction of underground facilities such as subways and utility tunnels in urban areas. Due to the variability and uncertainty of the ground, tunnelling in urban areas has various safety hazards which could cause damage to people and properties and it is very costly to recover from accidents. Therefore, it is very important to identify hazards from the planning and design phase and to establish risk mitigation measures. In this study, a total of 31 hazards affecting the stability of TBM tunnelling works in urban areas were listed from both the technical literature and correspondence with experts in tunnelling area. The importance and priorities of the hazards were analyzed by conducting Delphi technique, which is a decision-making method by consensus among experts. Finally, 12 hazards that satisfy the content validity criteria were settled and could be used as major control factors for accident prevention during TBM tunnelling works.
Shield method is the tunnel boring method that propels a steel cylinder in the ground and excavates tunnels at once. After Marc Isambard Brunel started using the method for the Thames Riverbed Tunnel excavation in London, many kinds of TBM (Tunnel Boring Machine) developed and applied for the construction of road, railway, electricity channel, pipeline, etc. In comparison with NATM concept that allows to observe ground condition and copes with difficulty. The machine selected before starting construction is not able to be changed during construction in shield TBM. Therefore the machine should be designed based on the ground survey result and experiment, so that the tunnel might be excavated effectively by controlling penetration speed, excavation depth and cutter head speed according to the ground condition change. This research was conducted to estimate penetration depth, excavate speed, wear of disc cutter on Boondang Railway of the Han Riverbed Tunnel ground condition by TBM performance prediction models such as NTNU, $Q_{TBM}$, Total Hardness, KICT-SNU and compare the estimated value with the field data. The estimation method is also used to analyze the reason of poor excavation efficiency at south bound tunnel.
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
1995.04a
/
pp.22-27
/
1995
본 연구로부터 얻어진 결론은 다음과 같다. 1. 본 연구에서는 TBM에 의한 파이롯트 터널의 효율성을 극대화한 이방향 천공 발파공법을 개발, 현장실험을 통하여 그 효용성을 입증하였다. 2. NATM 공법에 의한 발파보다 TBM을 이용하여 파이롯트 터널을 굴착하여 확대발파할 경우 상당한 지반진동 경감효과를 얻을 수 있을 것으로 판단된다. 3. 이방향 천공 발파공법의 현장시험 결과, 측정된 지반 진동치는 20% 이상의 진동 경감효과가 있는 것으로 분석되었다. 4. 기존공법과 신공법의 상대비교를 위한 수치해석 결과, 신공법의 방사상 방향 발파는 기존공법의 종방향 발파에 비하여 관심의 대상이 되는 발파공 직상부에서 진동치가 크게 경감되었다.
Boulder detection methods and its compensation is discussed with consideration of boulder conditions in soft ground tunneling by shielded TBM. For analysis of proper compensation methods for boulder obstruction, its removal costs and cases on eight projects are presented. Compensation for boulder obstruction removal by volume or weight is not practical for most tunneling situation, but compensation by crew time is probably the most equitable method. If boulders are anticipated on project, boulder removal plan must be considered with proper equipment selection.
Park Chul-Whan;Synn Joong-Ho;Park Yeon-Jun;Jeon Seok-Won;An Hyung-Jun
Tunnel and Underground Space
/
v.15
no.5
s.58
/
pp.378-386
/
2005
Jook-Ryung roadway tunnel was constructed by drill-blast after pilot tunnelling by 2 TBMS. nis report analyzes the data for TBM performance in the total length of 7.3 km for the two pilot tunnels. Net penetration rates were recorded as high as 2.3 m/h and 2.0 m/h for the two different directions while degrees of operation were $31.4\%$ and $33.3\%$, respectively. The cutter lives for No.2 tunnel were evaluated $200\~280\;m^3/c$ and around 400 m/set as high as for Meraker 10 km tunnel in Norway. The relationship between net penetration rate and characteristics of rock mass which were obtained by RMR and TSP measurement, coincides with the prior studies. This kind of evaluation is expected to be used to design TBM tunnelling and to help to perform the TBM operation effectively
The resource-based estimating based on standard unit price of construction work was estimated by multiplying the price per standard unit of work on the amount of labor, material, equipment use time. However, limitation of the resource-based estimating way does not adequately reflect the actual transactions prices. On the subject of water tunnel excavation as a new attempt to overcome these limitations, this study analyzed productivity by work type into cutter inspection/ exchange, TBM maintenance, TBM inspection/refueling, subsequent installations, tramcar, operating change, a cave-underground reinforcement / rock reinforcement, safety / meetings and analyzed actual cost estimating and the net advance rate based on this analysis result. Actual cost estimating calculation approach presented in this study can be utilized as a useful tool to predict the actual cost estimating in the TBM water tunnels field.
Journal of Korean Tunnelling and Underground Space Association
/
v.22
no.3
/
pp.277-291
/
2020
Shield TBM is a tunnelling method that has a wider range of applications in the poor ground condition compared to conventional tunnels (Drill and Blast). Currently, a 13.3 m large-diameter slurry shield TBM is preparing for construction to pass under the Han River. Shield TBM is divided into slurry and EPB shield TBM, and management items during construction are different depending on each characteristic. In this paper, the equipment type, origin, application case and trouble case were analyzed for slurry shield TBM, which is mainly constructed in soft ground. In addition, 2D and 3D model tests were conducted on the condition of soil depth for the possibility of slurry leakage into front of the equipment, with appropriate chamber pressure. Based on this paper, it proposed to provide basic and reference data for proper excavation surface pressure and chamber pressure during construction of slurry shield TBM under soft ground conditions, and proposed measures to minimize stability and environmental decline due to slurry ejection.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.