• Title/Summary/Keyword: TBM Tunnel

Search Result 287, Processing Time 0.02 seconds

Electrical resistivity tomography survey for prediction of anomaly in mechanized tunneling

  • Lee, Kang-Hyun;Park, Jin-Ho;Park, Jeongjun;Lee, In-Mo;Lee, Seok-Won
    • Geomechanics and Engineering
    • /
    • v.19 no.1
    • /
    • pp.93-104
    • /
    • 2019
  • Anomalies and/or fractured grounds not detected by the surface geophysical and geological survey performed during design stage may cause significant problems during tunnel excavation. Many studies on prediction methods of the ground condition ahead of the tunnel face have been conducted and applied in tunneling construction sites, such as tunnel seismic profiling and probe drilling. However, most such applications have focused on the drill and blast tunneling method. Few studies have been conducted for mechanized tunneling because of the limitation in the available space to perform prediction tests. This study aims to predict the ground condition ahead of the tunnel face in TBM tunneling by using an electrical resistivity tomography survey. It compared the characteristics of each electrode array and performed an investigation on in-situ tunnel boring machine TBM construction site environments. Numerical simulations for each electrode array were performed, to determine the proper electrode array to predict anomalies ahead of the tunnel face. The results showed that the modified dipole-dipole array is, compared to other arrays, the best for predicting the location and condition of an anomaly. As the borehole becomes longer, the measured data increase accordingly. Therefore, longer boreholes allow a more accurate prediction of the location and status of anomalies and complex grounds.

Electrical Resistivity Imaging for Upper Layer of Shield TBM Tunnel Ceiling (쉴드 TBM터널 상부 지반 연약대 전기탐사)

  • Jung, Hyun-Key;Park, Chul-Hwan
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.401-408
    • /
    • 2005
  • Recently shield TBM tunnellings are being applied to subway construction in Korean cities. Generally these kinds of tunnellings have the problems in the stability of ground such as subsidence because urban subway is constructed in the shallow depth. A sinkhole occurred on the road just above the tunnel during tunneling in Kwangju, so a survey for upper layer of the tunnel was needed. But conventional Ground Probing Radar can't be applicable due to the presence of steel-mesh screen in the shield segment, so no existent geophysical method is applicable in this site. Because the outer surface of each shield segment is electrically insulated, dipole-dipole resistivity method which is popular in engineering site investigation, was tried to this survey for the first time. Specially manufactured flexible ring-type electrodes were installed into the grouting holes at an interval of 2.4 m on the ceiling. The K-Ohm II system which has been developed by KIGAM and tested successfully in many sites, was used in this site. The system consists of 1000Volt-1Ampere constant-current transmitter, optically isolated 24 bit sigma-delta A/D conversion receiver - maximum 12 channel simultaneous measurements, and graphical automatic acquisition software for easy data quality check in real time. Borehole camera logging with circular white LED lighting was also done to investigate the state of the layer. Measured resistivity data lack of some stations due to failing opening lids of holes, shows general high-low trend well. The dipole-dipole resistivity inversion results discriminate (1) one approximately 4 meter diameter cavity (grouted but incompletely hardened, so low resistivity - less than $30{\Omega}m$), (2) weak zone (100-200${\Omega}m$), and (3) hard zone (high resistivity - more than 1000${\Omega}m$) very well for the distance of 320 meters. The 2-D inversion neglects slight absolute 3-D effect, but we can get satisfactory and useful information. Acquired resistivity section and video tapes by borehole camera logging will be reserved and reused if some problem occurs in this site in the future.

  • PDF

Refurbishment of a 3.6 m earth-pressure balanced shield TBM with a domestic cutterhead and its field verification (국산 커터헤드를 장착한 직경 3.6 m 토압식 쉴드TBM의 제작과 현장적용성 분석)

  • Bae, Gyu-Jin;Chang, Soo-Ho;Choi, Soon-Wook;Kang, Tae Ho;Kwon, Jun-Yong;Shin, Min-Sik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.4
    • /
    • pp.457-471
    • /
    • 2015
  • A domestic cutterhead with the diameter of 3.6 m was designed and manufactured in this study. Then, it was attached to an existing earth-pressure balanced shield TBM to excavate a cable tunnel with the length of 1,275 m. Especially, the procedures for TBM cutterhead design and its corresponding performance prediction were also summarized. From field data analyses of the refurbished shield TBM, its maximum advance rate was recorded as 14.4 m/day. Penetration depths of disc cutters were found to be approximately 4 mm/rev, which is equal to the maximum penetration depth designed for the strongest rock strength condition in the target tunnel. Every TBM operating thrust and cutter normal force during TBM driving was much smaller than their corresponding maximum capacities. When cutter acting forces recorded in the field were analyzed, their prediction errors by the CSM model were very high for weak rock conditions. In addition, rock strength showed very close relationships with cutter normal force and penetration depth.

Engineering geologic evaluation of TBM tunneling compatibility on Sujongsan drainage tunnel project (부산시 수정산배수지터널 TBM 굴진시 공법적합성을 평가하기 위한 암반의 지질공학적 평가)

  • 양인재;은성민;김우종;우상우
    • Proceedings of the KSEG Conference
    • /
    • 2002.04a
    • /
    • pp.211-218
    • /
    • 2002
  • TBM 터널굴진시 공법적합성을 평가하기 위한 현장조사 및 물리탐사와 세부지질조사를 수행하였다. 해당지역은 부산시 진구 가야동과 동구 수정동이며 인근 수원지인 덕정정수장에서 생산하는 수돗물을 수정산 배수지까지 확대 공급함으로서 송수공급 계통의 이원화로 안정적인 수돗물공급을 수행하기 위한 배수지터널이다. 이론적으로 굴착속도는 암반의 반발경도, 일축압축강도, 석영함량 및 각종 지질특성에 의하여 좌우되는데, 실지 시공에 있어서는 현장여건상 지질조건이나 일축압축강도등 한정된 자료들을 토대로 시공에 임할 수밖에 없다. 이러한 한계를 극복하기 위한 모형개발을 목표로 본 연구에서는 다양한 현장시험을 토대로 한 TBM 굴진 적합성을 검토하고자 하였다. 국내 시공경험상 및 지질특성만을 고려 할 때 본 과업구간의 TBM 적용성은 양호할 것으로 판단하였으나, 뚜렷한 근거에 의거하지 않은 설계는 시공단계에서 엄청난 손실을 야기하게 되므로 보다 상세한 검토를 수행하게 되었다. 본 연구에서는 TBM 공법선정의 적합성을 검토하기 각종 조사 자료들을 정리하였고, 국내시험의 한계점들을 극복하기 위한 적합한 모형개발의 필요성을 제시하고자 하였다.

  • PDF

TBM 터널과 NATM 터널의 초 근접시공 사례

  • 이인기
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.1 no.2
    • /
    • pp.161-170
    • /
    • 1999
  • 본고에서는 $1986.8\~1988.7$월중에 시공된 부산지하철 1호선 3단계 건설구간 중 서대신동 로타리에서 괴정국민학교 앞까지 연${\cdot}$경암지역에서의 TBM(Tunnel Boring Machine)으로 시행된 단선터널(7.0m)과 NATM으로 시행한 복선터널의 근접시공에 따른 간벽부 보강설계 내용과 근접부 시공시 계측결과 분석, 지보 Pattern조정 및 시공 실적 등을 제시하였다. 원설계 내용 분석 결과 지보 Pattern이 현장 지반조건에 비해 과다하였고 TBM 굴진시 Thrust 2500kN(본 기계 기준) 이상인 연암이상의 지반에서는 TBM 굴착으로의 효율성이 있었고, 경암구간에서 병행터널의 간섭영향을 배제하려면 터널간의 중심거리가 터널직경의 2배 이상이 되어야 하며, TBM 단선터널(7.0m)의 일 평균 굴진 길이는 4.6m로 분석되었다. 앞으로 이와 유사한 암층에서의 터널근접 시공 및 TBM 굴착시 본 분석내용이 참고가 되기를 기대하여 본고를 작성하였다.

  • PDF

A Study on the Excavation Efficiency in Rock Mass Applied TBM Method (TBM공법을 적용한 암반현장에서의 굴착효율에 관한 연구)

  • Jeong, Hyeong-Sik;Lee, Seung-Ho;Park, Jong-Bae
    • Geotechnical Engineering
    • /
    • v.11 no.1
    • /
    • pp.51-62
    • /
    • 1995
  • The use of TBM has been rapidly increased in recent years since TBM has been introduced to Korea in 1985 and Korea came to occupy 27% of TBM holding ratio in the world. Despite a lot of experience, study on promoting the efficiency of TBM excavation is insufficient. The factors that influence the efficiency of excavation are the mechanical farttor geotechnical factor and management factor. The study on the efficiency of excavation has focused on the improvement of mechanical factor. But geotechnical factor is also very important and by this factor engineer can estimate the applicability of TBM. The purpose of this paper is to understand the effectiveness of TBM excavation for vari orts rock quality by analysing relations between rock quality and TBM excavation.

  • PDF

A study on the machine load on shield advancing between soil ground and mix ground included core stone (토사지반과 핵석이 포함된 복합지반에서 쉴드TBM 굴진 시 장비부하에 관한 연구)

  • Kim, Ki-Hwan;Kim, Hyouk;Mun, Cheol-Hwa;Kim, Young-Hyu;Kim, Dong-Ho;Lee, Jae-Yong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1039-1048
    • /
    • 2018
  • In urban tunnel construction, most of the Shield TBM method is applied to secure the safety of buildings and to minimize risks. On the other hand, in the urban development process, landfills are often embanked or improving in many cases, so that the boundary between the surface and the rock is often heterogeneous. In case of ground condition such as alluvial soil, granite, decomposed granite, core stone and rock with various layers, datas on shield TBM advancing according to each ground condition are analyzed, The characteristics of machine load were compared and analyzed. As a result, it can be predicted that the change of ground condition can be predicted by the tendency of discharge volume, thrust force and cutting wheel torque when the cutter is checked and replaced regularly on advancing under maintaining the design slurry pressure.

Introduction to Research Trend of Real-Time Measurement for Wear of TBM Disc Cutter (TBM 디스크커터의 마모량 실시간 계측을 위한 연구현황)

  • Min-Sung, Park;Min-Seok, Ju;Min-Sung, Cho;Jun, Lee;Jung-Joo, Kim;Hoyoung, Jeong
    • Tunnel and Underground Space
    • /
    • v.32 no.6
    • /
    • pp.478-490
    • /
    • 2022
  • TBM disc cutter, which is the main cutting tool of tunnel boring machine (TBM), is replaced when it is excessively worn during the boring process. Disc cutters are usually monitored by workers at cutterhead chamber, and they check the status and wear amount of cutters. Because cutterhead chamber is usually in dangerous circumstance due to high pressure and instability of excavation surface, the measurement by manpower occasionally results in inaccuracy of measurement result. In order to overcome the limitations, the real-time disc cutter monitoring techniques have been developed in some foreign countries. This paper collected the current status of disc cutter monitoring system from the literature. Several types of sensors are used to measure the cutter wear, and it is believed that the collected information can be useful reference when similar domestic technologies are developed in the future.

Research Trend of Real-Time Measurement for Acting Force of TBM Disc Cutter (TBM 디스크커터의 실시간 하중 계측을 위한 연구현황)

  • Gyeongmin Ki;Jung-Joo Kim;Hoyoung Jeong
    • Tunnel and Underground Space
    • /
    • v.33 no.4
    • /
    • pp.244-254
    • /
    • 2023
  • The disc cutter mounted on the Tunnel Boring Machine (TBM) is subjected to cutting forces in three dimensions during rock excavation process. It is widely known that the cutting forces increased with the strength of the rock mass, while the rolling force can be significantly increased when the disc cutter encounters abnormal rotation. Therefore, the cutting force acts on the disc cutter provides important information because it represents the conditions of the rock mass and the disc cutter. For these reasons, several studies have been conducted to measure the cutter forces in real-time. This paper introduces the current status of research on the cutter force measurement of TBM disc cutters, which has been reported in the literature. It is judged that this paper can be a useful reference material when similar technologies are developed in Korea in the future.

Computing machinery techniques for performance prediction of TBM using rock geomechanical data in sedimentary and volcanic formations

  • Hanan Samadi;Arsalan Mahmoodzadeh;Shtwai Alsubai;Abdullah Alqahtani;Abed Alanazi;Ahmed Babeker Elhag
    • Geomechanics and Engineering
    • /
    • v.37 no.3
    • /
    • pp.223-241
    • /
    • 2024
  • Evaluating the performance of Tunnel Boring Machines (TBMs) stands as a pivotal juncture in the domain of hard rock mechanized tunneling, essential for achieving both a dependable construction timeline and utilization rate. In this investigation, three advanced artificial neural networks namely, gated recurrent unit (GRU), back propagation neural network (BPNN), and simple recurrent neural network (SRNN) were crafted to prognosticate TBM-rate of penetration (ROP). Drawing from a dataset comprising 1125 data points amassed during the construction of the Alborze Service Tunnel, the study commenced. Initially, five geomechanical parameters were scrutinized for their impact on TBM-ROP efficiency. Subsequent statistical analyses narrowed down the effective parameters to three, including uniaxial compressive strength (UCS), peak slope index (PSI), and Brazilian tensile strength (BTS). Among the methodologies employed, GRU emerged as the most robust model, demonstrating exceptional predictive prowess for TBM-ROP with staggering accuracy metrics on the testing subset (R2 = 0.87, NRMSE = 6.76E-04, MAD = 2.85E-05). The proposed models present viable solutions for analogous ground and TBM tunneling scenarios, particularly beneficial in routes predominantly composed of volcanic and sedimentary rock formations. Leveraging forecasted parameters holds the promise of enhancing both machine efficiency and construction safety within TBM tunneling endeavors.