• Title/Summary/Keyword: TBM 공법

Search Result 113, Processing Time 0.02 seconds

Prediction of Disk Cutter Wear Considering Ground Conditions and TBM Operation Parameters (지반 조건과 TBM 운영 파라미터를 고려한 디스크 커터 마모 예측)

  • Yunseong Kang;Tae Young Ko
    • Tunnel and Underground Space
    • /
    • v.34 no.2
    • /
    • pp.143-153
    • /
    • 2024
  • Tunnel Boring Machine (TBM) method is a tunnel excavation method that produces lower levels of noise and vibration during excavation compared to drilling and blasting methods, and it offers higher stability. It is increasingly being applied to tunnel projects worldwide. The disc cutter is an excavation tool mounted on the cutterhead of a TBM, which constantly interacts with the ground at the tunnel face, inevitably leading to wear. In this study quantitatively predicted disc cutter wear using geological conditions, TBM operational parameters, and machine learning algorithms. Among the input variables for predicting disc cutter wear, the Uniaxial Compressive Strength (UCS) is considerably limited compared to machine and wear data, so the UCS estimation for the entire section was first conducted using TBM machine data, and then the prediction of the Coefficient of Wearing rate(CW) was performed with the completed data. Comparing the performance of CW prediction models, the XGBoost model showed the highest performance, and SHapley Additive exPlanation (SHAP) analysis was conducted to interpret the complex prediction model.

Modern TBM Procurement System (선진화된 TBM 조달 시스템)

  • Ji, Wang-Ryul;Han, Myeong-Sik;Choe, Jae-Hwa
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.13 no.3
    • /
    • pp.39-46
    • /
    • 2011
  • 최근 영국을 비롯한 터널기술 선진국에서는 터널 프로젝트 관련 조달(Procurement) 시스템에 대해 많은 연구 가 진행되고 있다. 조달 시스템은 오늘날 기존의 터널 공법이 발파 버럭제거 보강 공정으로 이어지는 전통적인 NATM 공법에서 TBM 기계화 시공으로 점차 변화하고 있는 가운데, TBM 장비의 설계 구매 조달 시스템은 매우 중요한 공정으로 자리 잡고 있다. 따라서 터널 프로젝트의 조달 관련, 해외 연구 상황을 파악하고 기계화 시공의 핵심 공정인 TBM 조달에 필요한 내용에 관해 알아보고자 한다.

  • PDF

Engineering geologic evaluation of TBM tunneling compatibility on Sujongsan drainage tunnel project (부산시 수정산배수지터널 TBM 굴진시 공법적합성을 평가하기 위한 암반의 지질공학적 평가)

  • 양인재;은성민;김우종;우상우
    • Proceedings of the KSEG Conference
    • /
    • 2002.04a
    • /
    • pp.211-218
    • /
    • 2002
  • TBM 터널굴진시 공법적합성을 평가하기 위한 현장조사 및 물리탐사와 세부지질조사를 수행하였다. 해당지역은 부산시 진구 가야동과 동구 수정동이며 인근 수원지인 덕정정수장에서 생산하는 수돗물을 수정산 배수지까지 확대 공급함으로서 송수공급 계통의 이원화로 안정적인 수돗물공급을 수행하기 위한 배수지터널이다. 이론적으로 굴착속도는 암반의 반발경도, 일축압축강도, 석영함량 및 각종 지질특성에 의하여 좌우되는데, 실지 시공에 있어서는 현장여건상 지질조건이나 일축압축강도등 한정된 자료들을 토대로 시공에 임할 수밖에 없다. 이러한 한계를 극복하기 위한 모형개발을 목표로 본 연구에서는 다양한 현장시험을 토대로 한 TBM 굴진 적합성을 검토하고자 하였다. 국내 시공경험상 및 지질특성만을 고려 할 때 본 과업구간의 TBM 적용성은 양호할 것으로 판단하였으나, 뚜렷한 근거에 의거하지 않은 설계는 시공단계에서 엄청난 손실을 야기하게 되므로 보다 상세한 검토를 수행하게 되었다. 본 연구에서는 TBM 공법선정의 적합성을 검토하기 각종 조사 자료들을 정리하였고, 국내시험의 한계점들을 극복하기 위한 적합한 모형개발의 필요성을 제시하고자 하였다.

  • PDF

Decreasing Effects of Vibration by Drill and VBast Method with Bi-directions using TBM Pilot Tunnels (파이롯트 터널을 이용한 이방향 천공 발파공법의 진동 저감효과)

  • 이찬우;유진오;이경원;배규진
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 1995.04a
    • /
    • pp.22-27
    • /
    • 1995
  • 본 연구로부터 얻어진 결론은 다음과 같다. 1. 본 연구에서는 TBM에 의한 파이롯트 터널의 효율성을 극대화한 이방향 천공 발파공법을 개발, 현장실험을 통하여 그 효용성을 입증하였다. 2. NATM 공법에 의한 발파보다 TBM을 이용하여 파이롯트 터널을 굴착하여 확대발파할 경우 상당한 지반진동 경감효과를 얻을 수 있을 것으로 판단된다. 3. 이방향 천공 발파공법의 현장시험 결과, 측정된 지반 진동치는 20% 이상의 진동 경감효과가 있는 것으로 분석되었다. 4. 기존공법과 신공법의 상대비교를 위한 수치해석 결과, 신공법의 방사상 방향 발파는 기존공법의 종방향 발파에 비하여 관심의 대상이 되는 발파공 직상부에서 진동치가 크게 경감되었다.

  • PDF

Determination of the Construction Method for Young Dong Tunnel by Risk Assessment (위험도 분석기법에 의한 영동선 터널의 굴착공법 결정사례)

  • Kim, Yong-Il;Hencher, S.R.;Yoon, Young-Hoon;Cho, Sang-Kook
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.1
    • /
    • pp.13-25
    • /
    • 2002
  • The construction method for Young Dong Tunnel has been chosen following detailed risk assessment. In this paper, the specific risks to the project programme, associated with adopting either mechanical excavation in the form of a shielded TBM, or drill and blast excavation methods, are assessed. From the risk assessment results, and taking other important factors into account, such as project sensitivity and local experience, the recommendation is made that the relatively low risk drill-and-blast method is the most appropriate for construction of Young Dong Tunnel.

  • PDF

Determination of the Construction Method for the Young Dong Tunnel by Risk Assessment (위험도 분석기법에 의한 영동선 터널의 굴착공법 결정사례)

  • Kim, Yong-Il;S. R. Hencher;Yoon, Young-Hoon;Cho, Sang-Kook
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.200-206
    • /
    • 2002
  • The construction method for the Young Dong Tunnel has been chosen following detailed risk assessment. In this paper, the specific risks to the project programme, associated with adopting either mechanical excavation in the form of a shielded TBM, or drill and blast excavation methods, are assessed. From the risk assessment results, and taking other important factors into account, such as project sensitivity and local experience, the recommendation is made that the relatively low risk drill-and-blast method is the most appropriate for construction of the Young Dong tunnel.

  • PDF

Numerical investigation on the effect of backfill grouting on ground behavior during shield TBM tunneling in sandy ground (사질토 지반을 통과하는 쉴드 TBM에서 뒤채움 그라우팅이 지반 거동에 미치는 영향에 대한 수치해석적 연구)

  • Oh, Ju-Young;Park, Hyunku;Chang, Seokbue;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.2
    • /
    • pp.375-392
    • /
    • 2018
  • The shield TBM method is widely adopted for tunneling works in urban area because it has more beneficial ways to control settlement at ground surface than conventional mined tunneling. In the shield tunneling, backfill grouting at tail void is crucial because it is supposed not only to restraint ground deformation around tail void during excavation but also to compensate precedent ground settlement by pushing up the ground with highly pressurized grout. However, the tail void grouting has been found to be ineffective for settlement compensation particularly in sandy ground, which might be caused by complicate interaction between ground and tail void grouting. In this paper, the effects of tail void grouting on behavior of ground in shield TBM tunneling were investigated based on 3-dimensional finite element analyses. The results of numerical analyses indicated that backfill grouting actually reduces settlement by degrading settlement increasing rate in excavation, which means decrease of volume loss. Meanwhile, the grouting could not contribute to compensate the precedent settlement, because reduction of volume loss by grouting was found to be counterbalanced by volume change of ground.

Analysis of Standard Cost and the Construction Period Applied TBM Excavation Method (TBM 굴착 공법 적용 구경별 표준 공사비 및 공사기간 분석 연구)

  • Park, Hong Tae
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.4
    • /
    • pp.319-327
    • /
    • 2012
  • This research collected work drilling report of TBM method site developed by WRITH company to TBM equipment company in Germany and analyzed work operating productivity. Based the data analyzed TBM operating productivity, This research derived and presented excavation speed(m/day) by TBM diameter (2.6m, 3.0m, 3.5m, 5.0m, 8.0m) and rock. Also, based on the excavation speed(m/day) by TBM diameter, This research estimated a day direct construction cost and total direct construction costs by applying a direct construction cost which spent on per 1m. Based on hard rock 40.0%, soft rock 30.0%, usually rock 20%, weathered rock 10.0%, TBM boring velocity, m per cost, total construction period shall estimate the construction cost and the construction period by the effective use by diameter when future applying TBM method to the basic planning stages and in the preliminary design phase.

TBM risk management system considering predicted ground condition ahead of tunnel face: methodology development and application (막장전방 예측기법에 근거한 TBM 터널의 리스크 관리 시스템 개발 및 현장적용)

  • Chung, Heeyoung;Park, Jeongjun;Lee, Kang-Hyun;Park, Jinho;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.1
    • /
    • pp.1-12
    • /
    • 2016
  • When utilizing a Tunnel Boring Machine (TBM) for tunnelling work, unexpected ground conditions can be encountered that are not predicted in the design stage. These include fractured zones or mixed ground conditions that are likely to reduce the stability of TBM excavation, and result in considerable economic losses such as construction delays or increases in costs. Minimizing these potential risks during tunnel construction is therefore a crucial issue in any mechanized tunneling project. This paper proposed the potential risk events that may occur due to risky ground conditions. A resistivity survey is utilized to predict the risky ground conditions ahead of the tunnel face during construction. The potential risk events are then evaluated based on their occurrence probability and impact. A TBM risk management system that can suggest proper solution methods (measures) for potential risk events is also developed. Multi-Criterion Decision Making (MCDM) is utilized to determine the optimal solution method (optimal measure) to handle risk events. Lastly, an actual construction site, at which there was a risk event during Earth Pressure-Balance (EPB) Shield TBM construction, is analyzed to verify the efficacy of the proposed system.