• Title/Summary/Keyword: T-N Removal

Search Result 608, Processing Time 0.024 seconds

A Study on the Treatment of Nutrients and Organic Carbon in Wastewater through Spatial Separation and Internal Recycling in a Modified Oxidation Ditch (격벽에 의한 조분리와 내부반송을 이용한 산화구 시설의 고도처리개선에 관한 연구)

  • Lee, Young-Shin;Oh, Dae-Min
    • Journal of Environmental Health Sciences
    • /
    • v.37 no.1
    • /
    • pp.64-72
    • /
    • 2011
  • This study was performed to assess the removal efficiency on nitrogen, phosphorus and organic carbon in wastewater by spatial separation and internal recycling in a modified oxidation ditch process (modified OD). The performances of the modified OD were evaluated via laboratory-scale experiments. The process was operated at hydraulic retention times of 6-48 hours and solid retention times of 17-38 days. We found that organic carbon removal efficiency increased after the modified OD operation period. T-N removal efficiency remained stable; average T-N concentration of effluent was 8.02 mg/l after modified OD operation. In contrast, T-P concentration of effluent was over 1 mg/l. Nitrogen and phosphorus removal efficiency of modified OD at HRT 12 hr were 83.1% and 74.1%, respectively. Also, maximum efficiency was found at SRTs from 20 to 30 days. T-N removal efficiency was 83.1% at a C/N ratio from 3.0 to 3.5. However, T-N removal efficiency decreased at C/N ratios over 3.5. Also, T-P removal efficiency increased with HRT at C/P ratios in the same condition. Maximum efficiency was 74.1% at a C/P ratio from 25 to 28. T-N removal efficiency was 79.2% and T-P removal efficiency was 65.3% after M4 mode operation (added to the internal recycle line connected to the anoxic reactor). The modified OD with spatial separation and internal recycling developed in this study is, therefore, believed to be an improvement for solving problems in the nutrient removal technologies.

Nutrient Removal Characteristics on Organic Material Loadings in Submerged Flat Sheet Type Sequencing Batch Membrane Reactor (침지식 평판형 연속회분식 박반응기에서 유입 유기물 부하의 변화에 따른 영양염류의 제거 특성)

  • Kim, Seung-Geon;Lee, Ho-Won;Kang, Yeung-Joo
    • Membrane Journal
    • /
    • v.20 no.3
    • /
    • pp.241-248
    • /
    • 2010
  • The effect of organic material loadings on nutrient removal characteristics were investigated in sequencing batch reactor, in which a flat sheet type microfiltration membrane with a pore size of $0.4\;{\mu}m$ was submerged. Three organic concentrations of 200 mg/L (Run-1), 400 mg/L (Run-2) and 800 mg/L (Run-3) were carried out continuously to identify their effect on the filtration performance and nutrient removal. The removal efficiencies of T-N and T-P were increased with the increase of COD/N and COD/P. The T-N removal efficiencies of Run-1, Run-2 and Run-3 were 28.1, 32.6 and 90.4%, the average concentrations of T-N in permeate were 32.0, 30.0, and 4.3 mg/L, respectively. The T-P removal efficiencies of Run-1, Run-2 and Run-3 were 13.6, 35.3 and 93.1%, the average concentrations of T-P in permeate were 3.11, 2.33, and 0.25 mg/L, respectively.

The Effects of Changing of Hydraulic Retention Time and Charging Media on the Removal of Nitrogen and Phosphorus in the Up-flow Anaerobic/Anoxic Reactor and Water-mill for Sewage Treatment (상향류식 혐기성조, 무산소조 및 수차호기조를 이용한 하수처리시 수리학적 체류시간의 변화와 메디아 충진이 질소 및 인 제거에 미치는 영향)

  • Shin, Myoung-Chul;Lee, Young-Shin
    • Journal of Environmental Health Sciences
    • /
    • v.35 no.1
    • /
    • pp.64-70
    • /
    • 2009
  • The aims of this study is to examine the effects of the changes in HRT(Hydraulic Retention Time) and media charge in a water-mill, among other operation factors, on the nitrogen and phosphorus removal in order to use up-flow anaerobic reactors, anoxic reactors and water-mill aerobic reactors for sewage treatment. The extension of HRT improved the nitrogen removal efficiency, however the removal pattern was constant regardless of HRT. The removal of phosphorus was constant (80%-90%) regardless of the change in HRT. The removal rate with change in influx load varied such that at the OLR (Organic Load Rate) of 1-3 kg/d, the T-N removal efficiency was 80.7%-88.9% and the T-P removal efficiency was 82.9%-89.3% while at the NLR (Nitrogen Loading Rate) of 0.108-0.156 kg/d the removal efficiencies were 80.7-88.9% (T-N) and 82.9-89.3% (T-P). The analyses of the nitrogen and phosphorous removal characteristics with the C/N and C/P ratio showed that the mean T-N removal rate was 88% at the C/N ratio of 1.2-2.6, and that the mean T-P removal rate was 86% at the C/P ratio of 7.2-14.1. Also, the analysis of nitrogen and phosphorous removal characteristics were analyzed in relation to media charge. The comparison between with and without media charge in the water-mill showed that while the nitrogen removal efficiencies were 86-94% and 85-89% respectively, the difference of phosphorous removal efficiencies were between the two conditions was not significant, thus it suggested that the media charge has less effect on the removal efficiency of phosphorous compared to that of nitrogen.

Advanced Wastewater Treatment Using Biofilter System with Floating Media under Alternative Flow (유로변경식 부상여재 생물여과시스템을 이용한 하수고도처리)

  • Ryu, Hong-Duck;Lee, Jeong-Hun;Lee, Sang-Ill
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.2
    • /
    • pp.250-257
    • /
    • 2006
  • The objective of this study is to propose an alternative process for the small sewage treatment plants in rural communities. A biofilter has been used for biological wastewater treatment, which is becoming the alternative to the conventional activated sludge system. The proposed process used in this study, which is packed with floating media (i.e. expanded polystylene), has advantages of biofilter system and alternative flow system and they are incorporated into one process. Pilot and bench scale studies were performed using domestic wastewater. In the results of pilot plant study, it was observed that the stable effluent water quality was achieved and it met the present effluent criteria of suspended solid (SS), organic matters, T-N and T-P. In the study for determination of the cycle of backwashing, it was observed that the cycle of backwashing depended on BOD loading rates of influents. In the BOD loading rates of $0.5kg\;BOD/m^3{\cdot}day$ and $1.0kg\;BOD/m^3{\cdot}day$, the backwashing cycle of 28 hour and 16 hour were needed, respectively. The optimum backwashing time was 120~80 seconds at the media expansion rate of 50%. In the removal of SS, organic matters, T-N and T-P, SS removal was rather achieved by physical filtration than biological mechanism and the removal of organic matters except for SS, T-N and T-P were mainly rather achieved by biological mechanism than physical filtration. In bench-scale study, the effects of recirculation rate was investigated on removal of SS, TCOD, T-N and T-P. It was observed that the recirculation made removal efficiencies of SS, TCOD, T-N and T-P increased. Especially, in T-N removal, the increase of T-N removal efficiency of 40% was observed in the reicirculation rate of 1Q compared with 0Q.

Removal Efficiency of Pollutants in Agricultural Wastewater by Constructed Wetlands on Reclaimed Land in the Goheung Bay (고흥만 간척지 내 인공습지에 의한 농경배수 정화효율에 관한 연구)

  • Yu, Hun-Sun;Kang, Dong-Hwan;Kwon, Byung-Hyuk
    • Journal of Wetlands Research
    • /
    • v.11 no.3
    • /
    • pp.37-47
    • /
    • 2009
  • This research was conducted at the constructed wetland in Goheung reclaimed land, and water quality components were measured at the 12 points in 15 March 2008 and 10 January 2009, respectively. Temperature, pH, DO, EC and salinity components were measured at the field, and TOC, Cl-, COD, TSS, T-P and TN components were analyzed laboratory. Concentrations of field measured components at inflow points were higher than in constructed wetland. TOC concentration ratio of inflow water to constructed wetland water was higher in January, and Cl concentration ratio of it was higher in March. And, COD concentration ratio of it were 1.37 for March and 1.49 for January, respectively. T-P and T-N concentration ratios of it at inflow points were higher 3 times than in constructed wetland. Constructed wetland attenuated concentration of contaminated components inflow to it. Removal efficiencies of Cl-, T-P and T-N components in inflow water were high at the constructed wetland. removal efficiencies of Cl component were 83% for 1st monitoring and 76% for 2nd monitoring, this removal efficiency be caused by dilution effect of constructed wetland. removal efficiencies of T-P component were 67% for 1st monitoring and 69% for 2nd monitoring, and they of T-N component were 100% for 1st monitoring and 95% for 2nd monitoring. Abnormal removal efficiency of T-N component is caused that nitrogen in inflow water was a little. Removal efficiency of T-P component was higher in January, and T-N component was higher in March. This is caused by environmental difference between growing season and winter.

  • PDF

Nitrogen and Phosphorus Removal in Domestic Wastewater using SBR Process with Flow Changing Continuous Feed and Cyclic Draw (교대연속유입식 SBR 공정을 이용한 하수중의 질소 및 인 제거)

  • Seo, In-seok;Kim, Hong-suck;Kim, Youn-kwon;Kim, Ji-yeon
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.2
    • /
    • pp.203-208
    • /
    • 2006
  • A continuous feed and cyclic draw SBR process was developed to overcome flow rate fluctuation and to maximize organic matters utilization efficiency for nitrogen and phosphorus removal. The developed SBR process was operated with two parallel reactors. Influent was supplied to one reactor which was not obligately aerated. At the same time, the other reactor was just aerated without supplying influent. In addition this mode was changed periodically. Cycle time was 6hr and aeration time ratio($t_{aer}/t_{total}$) was 0.33, respectively. $COD_{cr}$ and SS removal efficiencies of 95% or higher were achieved. Nitrogen removal was so greatly influenced by influent $COD_{cr}/T-N$ ratio. At influent $COD_{cr}/T-N$ ratio of 5.7, removal efficiencies of ammonia-N, T-N and T-P were 96%, 78% and 55%, respectively. Influent $COD_{cr}/T-N$ of 4 or higher ratio was necessary to achieve 60% or higher nitrogen removal. Organic matters of influent was efficiently utilized in denitrification reaction and consumed COD has a good correlation with removed T-N(about 6.5 mgCOD/mgTN). Continuous feed and cyclic draw SBR process could be one of alternative processes for the removal of nutrients in rural area where $COD_{cr}/T-N$ ratio was low and fluctuation of flow rate was severe.

A Study on the filtering bed of porous sintering-product and hydrophytes for sewage treatment (오·폐수처리를 위한 수생식물 다공성 소결체여상의 기초연구)

  • Kim, Ju-Hyung;Yun, Chan;Oh, Joon-Seong
    • Clean Technology
    • /
    • v.7 no.2
    • /
    • pp.89-97
    • /
    • 2001
  • The purpose of this study was to find the optimum condition of the high removal efficiency of water pollutant as sewage treatment technology using a filtering bed charged with porous sintering-pellet which was planted with hydrophytes. Experiment was carried out by changing concentration of water pollutants(COD, T-N, T-P), kind of hydrophyte, kinds of filtering material and size, and HRT. The result of removal efficiency was obtained as following: COD removal 73.8~87.1% for input concentration range of 50~450mg/L, T-N removal 61.3~77.3% for input concentration range of 7~124mg/L, T-P removal 89.5~99.1% for input concentration ranger of 3~27mg/L. In a comparative experiment of three kinds of hydrophyte(Iris pseudoacorus, Phragmites communis $T_{RIN}$., Oenanthe javanica Dc.), the best removal efficiency of COD and T-N was gained with Iris pse-udoacorus, and Phragmites communis $T_{RIN}$ showed better result than two hydrophytes for the removal efficiency of T-P. In a comparative experiment of four kinds of filtering-materials, the removal efficiencies were in the order of porous sintering-pellet, gravel, nonused-tire and nonused-concrete. It was found that for the porous sintering-pellet, the smaller its diameter, the better its result. In the filtering bed in which was charged with porous sintering-pellets of 5mm diameter and planted with Iris pseudoacorus, the removal efficiency of COD, T-N and T-P were over 80%, 70% and 90% under the concentration of COD 250mg/L, T-N 70mg/L and T-P 15mg/L for 24hrs treatment. Thus, we concluded that a filtering bed charged with porous sintering-pellet and planted with hydrophytes will be suitable for treatment of sewage water as a pro-natural treatment technology.

  • PDF

Determination of operation parameter on intermittently aerated activated sludge system by computer simulation model (컴퓨터 예측모델을 활용한 간헐폭기 활성슬러지 시스템의 운영인자 결정)

  • 이상일;서인석;이원호;손종렬
    • Journal of environmental and Sanitary engineering
    • /
    • v.10 no.2
    • /
    • pp.23-29
    • /
    • 1995
  • In this research effect of SRT, feeding pattern and reactor configuration on intermittently aerated activated sludge system was evaluated by using computer simulation model. T- N removal was affected to the SRT. SRT for the effective T- N removal was 156ay or longer. Feeding pattern in intermittently aerated activated sludge system was affect to the T- N removal. Feeding pattern which 100% loading to the first reactor was most effective for T- N removal. When multi- stage of 2- stage or more was operated, COD and T- N in effluent removal was nearly the same.

  • PDF

A study on the desulfurization wastewater treatment using Ferrate(VI) (Ferrate(VI)를 이용한 발전소 탈황폐수 처리에 관한 연구)

  • Jo, Eun-young;Park, Chan-gyu
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.31 no.4
    • /
    • pp.297-301
    • /
    • 2017
  • Wastewater treatment using ferrate (VI) solution is becoming a promising technology for several years, because it is high efficient and harmless technology. In this study, the ferrate (VI) solution was tested to treatment of desulfurization wastewater. The effluent from desulfurization wastewater treatment process of power plant was used as raw water, and the COD and T-N removal efficiency of ferrate(VI) solution were investigated. In the test, as the injection rate increased from 0.1 to 1.0%, the removal efficiency of COD also slightly increased, about 80% of COD were removed in 1.0% of injection rate. In the case of T-N, about 50% of T-N was removed in the condition of 1.0% of injection rate. The removal efficiency of COD and T-N also affected by reaction time, maximum removal efficiency was shown in 30 min of treatment. From these results, the wastewater treatment with ferrate(VI) solution can be great solutions for treatment of non-biodegradable pollutants in wastewater, especially for the 3rd treatment of wastewater.

Review of 5-year Experimental Data from Treatment Wetland (인공습지 실험시설의 5년간 결과 및 고찰(지역환경 \circled3))

  • 김민희;윤춘경
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2000.10a
    • /
    • pp.649-654
    • /
    • 2000
  • Field experiment was performed from August 1996 to June 2000. The pilot plant was installed in Konkuk University and the effluent from septic tank of school building was used as an influent to the treatment basin. The treatment basin was composed of sand and reed. Average removal rate of BOD, SS was about 75.9%, 73.4%, respectively. T-P removal rate was about 47.3%, and T-N removal rate was 19.6%. The reason for poor T-N removal might be due to high influent concentration and short retention times. As operation period increased, BOD removal rates were increased, and SS and T-P removal rates did not change significantly, but T-N removal rates were decreased.

  • PDF