An Auto-drawing Algorithm for the Single Line Diagram of Distribution Systems (배전선로 회선별단선도 자동생성 알고리즘)

  • Son, Ju-Hwan;Lim, Seong-Il
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.5
    • /
    • pp.854-859
    • /
    • 2010
  • Distribution Automation System(DAS) is designed to improve operational efficiency by acquisition and control of remote data using its components such as central computation units, communication network and feeder remote terminal units. A conventional human machine interface of the DAS adopts a schematic diagram which is made by drawing power equipments on the geographic information system map. The single line diagram is more useful than the schematic diagram for the main tasks of distribution system operation such as protective relay coordination, service restoration and loss minimization. Since the configuration of the distribution line is changed according to the relocation of the open tie switches, the auto-drawing algorithm based on the connection between the sections and the switches is an essential technique. This paper proposes a new auto-drawing algorithm for a single line diagram of distribution systems based on tertiary tree and collision avoidance method. The feasibility of the proposed algorithm has been testified for various cases using practical distribution system with 12 feeders.

A Study on an Improving Contingency Constrained Pre-Dispatch Algorithm in a Competitive Electricity Market (경쟁적 전력시장에서 송전선로 상정사고를 고려한 선행급전 알고리즘 개선에 관한 연구)

  • Kim, Kwang-Mo;Shin, Hye-Kyeong;Kang, Dong-Ju;Han, Seok-Man;Chung, Koo-Hyung;H.Kim, Bal-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.806-807
    • /
    • 2007
  • Systematic studies on the dispatch scheduling algorithm and related constraints can enhance the effectiveness of electricity market operation. When System Operator (SO) establishes a dispatch schedule, the bid information should be preserved in the schedule as much as possible. In this paper, we introduce a new type of sensitivity factor called Line Outage Impact Factor (LOIF) to screen a transmission line causing the most severe outage when scheduling the dispatch. This screening can assure the stable system operation and make an efficient feedback between the SO and market participants. We propose a transmission line contingency constrained Pre-dispatch algorithm using sensitivity indices in a suitable Pre-dispatch scheduling. The proposed algorithm has been tested on sample system and the results show more secure operation against critical contingencies.

  • PDF

The test bed for teleoperated space robot (우주로봇 원격제어 테스트 베드)

  • 김동구;박종오
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1997.10a
    • /
    • pp.760-763
    • /
    • 1997
  • Using telesensor programming method, we control the space robot which has two 2-DOF manipulators. To make this control system, we devide total works by elemental operation. And we make a simulation system that can simulate sensors and robot. In the simulation system, we make a sensor data and robot paths by "Teaching by showing" method. And using these data, we control the real space robot. This off-line method can solve long time delay problem in teleoperation.operation.

  • PDF

Analysis of the Recovery Behavior of SFCL According to Reclosing Operation (재폐로 동작에 따른 초전도 한류기의 회복성능 분석)

  • Ha, Kyoung-Hun;Cho, Yong-Sun;Kim, Deog-Goo;Choi, Hyo-Sang
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.5
    • /
    • pp.1073-1077
    • /
    • 2011
  • The breaking capacity of circuit breakers could be no more increased in the electric power system. This is because the fault current increases due to continuous increases in electric power demand and facilities. To solve the problem, it is necessary to come up with an alternative. The superconducting fault current limiter (SFCL) has received an attention among various alternatives. The SFCL effectively reduce a fault current in cooperation with a power circuit breaker. A various types of the SFCL are suggested and a study on them have been progressed. As a result of it, the SFCL can be applyed to the electric power system in the near future. But, a study on recovery behaviors of the SFCL is not enough for applying to the electric power system. If the superconducting elements do not completely recover to the superconducting state after fault operation, it might be a breakdown of the superconducting elements due to heavy power burden and it gives an bad influence on the working of other electric devices. Additionally, the distribution power system has reclosing operation such as open-0.3sec-closed/open-3min-closed/open procedure. So we need to study more about improvement of the recovery behaviors of the SFCL. In this paper, we analyzed the recovery behaviors of a flux-coupling type SFCL according to reclosing operation when a single line-to-ground fault occurred and we compared recovery behaviors of the SFCL with and without a neutral line between secondary reactors and superconducting elements. Also, the flux-coupling type SFCL has advantageous for increases of capacity by controlling the variation in turn ratios between two reactors. Consequently, when the number of turns of the secondary reactors increased, the power burden of the superconducting elements was bigger due to the increase of impedances of the secondary reactors. To distribute the power burden, two superconducting elements connected in series and the balanced quenching of the superconducting elements was induced by connecting a neutral line.

A Study on the Development and Effect of Smart Manufacturing System in PCB Line

  • Sim, Hyun Sik
    • Journal of Information Processing Systems
    • /
    • v.15 no.1
    • /
    • pp.181-188
    • /
    • 2019
  • A production system is a management system that supports all activities to perform production operations at the manufacturing site. From the point-of-view of a smart factory, smart manufacturing systems redesigned the concept of onsite production systems to fit the entire system and its necessary functional composition. In this study, we select the key functions needed to build a smart factory for a PCB line and propose a new six-step model for the deployment of a smart manufacturing system by integrating essential functions. The smart manufacturing system newly classified the production and operation tasks of PCB manufacturing and selected necessary functions through requirement analysis and benchmarking of advanced companies. The selected production operation tasks are mapped to the functions of the system and configured into seven modules, and the optimal deployment model is presented to allow flexible responses to the characteristics of the tasks. These methodologies are first presented in this study, and the proposed model was applied to the PCB line to confirm that they had significant changes in the work method, qualitative effects, and quantitative effects. Typically, lead time and WIP have reduced by about 50%.

Study on the Calculation of the Optimal Power System Operation Considering Line Contingencies and Line Capacities (선로사고 및 선로용량을 고려한 전력계통 최적운영에 관한 연구)

  • 박영문;백영식;서보혁;신중린
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.36 no.9
    • /
    • pp.609-615
    • /
    • 1987
  • The optimal operation of power system is developed by alternately using real power dispatch and reactive power dispatch problem. The real power system scheduling process is formulated as an optimization problem with linear inequality constraints. A.C. loadflow method is used for the problem solution and line losses are considered. The constraints under consideration are generator power limits, load scehdling limits and line capacity limits. In solving the objective function the Dual Relaxation method is adopted. Tests indicate that the method is practical for real time application. The reactive power control problem uses the Dual Simplex Relaxation method as in the real scheduling case. Insted of minimizing the cost of power system, the objective is selected as to determine the highest possible voltage schedule. The constraints under consideration are the voltage limits at each node and the possibilities of supply or absobtion of reactive energy by generator units and the compensation facilities. Tests indicate that the method is practical for real time applications. The overall optimization methods developed in this paper proved to obtained fine results in minimizing object function compared with the method without using voltage control. And the overall voltage profiles were also improved.

  • PDF

Coordinated Wide-Area Regulation of Transmission System for Voltage Profile Improvement and Power Loss Reduction

  • Asadzadeh, Babak;Golshannavaz, Sajjad
    • Transactions on Electrical and Electronic Materials
    • /
    • v.18 no.5
    • /
    • pp.279-286
    • /
    • 2017
  • In this paper, an optimal approach for the wide-area regulation of control devices in a transmission network is proposed. In order to realize an improved voltage profile and reduced power loss, existing devices such as tap-changing transformers, synchronous machines, and capacitor banks should be controlled in a coordinated and on-line manner. It is well-understood that phasor measurement units in transmission substations allow the system operators to access the on-line loading and operation status of the network. Accordingly, this study proposes efficient software applications that can be employed in area operation centers. Thus, the implanted control devices can be regulated in an on-line and wide-area coordinated approach. In this process, efficient objective functions are devised for both voltage profile improvement and power loss reduction. Subsequently, sensitivity analysis is carried out to determine the best weighting factors for these objectives. Extensive numerical studies are conducted on an IEEE 14-bus test system and a real-world system named the Azarbayjan Regional Transmission Network. The obtained results are discussed in detail to highlight the promising improvements.

A Security-oriented Operation Scheme of FACTS Devices to Cope with A Single Line-faulted Contingency (단일 선로고장시 정적 안전도 향상을 위한 유연송전기기 운전 방안)

  • Lim, Jung-Uk
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.18 no.3
    • /
    • pp.149-155
    • /
    • 2004
  • This paper presents how to find proper operating points of FACTS devices to enhance the steady-state security level considering line contigency analysis. Three generic types of FACTS devices such as series controllers, shunt controllers, and series-shunt controllers are introduced and applied to moximize a security margin and to minimize security indices. Security indices related to line flows and bus voltages are utilized and minimized iteratively in this paper. Contingency analysis is performed to detect the most severe single line fault. In various load conditions, FACTS devices are tested to establish appropriate preventive or corrective action without generation re-dispatching or load shedding. The FACTS operation scheme is verified on the IEEE 57-bus system in a line-faulted contingency.

A Study on Fault of Multifunctional Battery Storage System interconnected with Distribution System (배전시스템에 연계된 다기능 전지전력저장시스템의 사고에 관한 연구)

  • Kim, Jae-Chul;Moon, Sun-Ho;Kim, In-Taek;Kim, Eung-Sang;Chu, Dong-Wook
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.1244-1246
    • /
    • 1998
  • This paper present a variety fault problem brought out with the multifunctional Battery Energy Storage System [MBESS] expected to be practical in the short future interconnected to power distribution system. Multifunctional BESS model and interconnection model to power system is simply configured, the problems of protection coordination and operation is studied. A line fault in the power distribution system are discussed such as line to ground and three phase fault in order to show the impact on power utilities, demand-side and BESS-side. In order to simulate a variable transient phenomenon due to 2 the BESS interconnection operation to power distribution system, in this paper, PSCAD/EMTDC simulation tools is used.

  • PDF

A study on the application of TALK-BACK system in a radio communication environment (토크백 시스템 무선통신 적용방안 연구)

  • Yeo, Yong-Joo;Yoon, In-Young;Nam, Joung-In;Choi, Yoon-Seog
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1294-1302
    • /
    • 2008
  • Talk-Back systems comprised of master-equipment at the control room and slave-equipment at turnouts refer to the intercommunication facilities that optimize mutual communication between maintenance staff on trackside and the control room to facilitate quickness and accuracy of train operation control and its maintenance within depot and on mainlines with turnouts for direction switching of the trains in operation. The weakness lies in additional maintenance costs of cables since the Talk-Back system installed on line 1 along with line 2-4 has a profound effect on the voice quality leading to the attenuation and crosstalk of the system due to the deterioration of cables and environmental factors. This paper discusses the Talk-Back system in a radio communication environment with the application of RF(Radio Frequency) communication system from the wire communication system by cables to ameliorate these problems, and deals with the energy saving environmentally friendly facilities in consideration of replacing power section at salve-equipment with solar batteries benefitting the system in light of energy consumption.

  • PDF