• Title/Summary/Keyword: System operation line

Search Result 1,503, Processing Time 0.037 seconds

Analysis and lest of On-line and off-line PD Testing for High Voltage Rotating Machines Stator Windings using Ceramic Coupler (세라믹 커플러를 이용한 고전압회전기 고정자권선의 On-line 및 off-line 부분방전 특성 시험 및 분석)

  • Oh, Bong-Keun;Kim, Hyun-Il;Kang, Seong-Hwa;Lim, Kee-Joe
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.20 no.10
    • /
    • pp.895-900
    • /
    • 2007
  • Partial discharge(PD) test can be performed either when the rotating machine is not operating(off-line) or during normal machine operation(on-line). This paper presents an on-line and off-line PD test on a large hydro-generator and induction motor using the same PD acquisition system(PDAS) and ceramic coupler(CC) sensor. PD signal characteristics of CC sensor proved similar with that of epoxy mica coupler(EMC) sensor as a results of PD test for simulated defect winding and frequency response test. A comparison of on-line and off-line PD test for PD characteristic parameters-phase resolved PD(PRPD), maximum PD value(Qmax) and PD occurrence energy(POE)-indicated that on-line PD test could reliably and effectively diagnose insulation conditions which were verified by off-line PD test.

A Study on Effect of Applying Energy Storage System on SeoulMetro Line 2 (에너지저장시스템의 서울메트로 2호선 적용 효과에 관한 연구)

  • An, Cheon-Heon;Lee, Han-Min;Kim, Gil-Dong;Lee, Hi-Sung
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.966-971
    • /
    • 2009
  • The recent environmental protection trend requires more strict energy saving, therefore every transportation system should reduce energy consumption to the minimum value. High-efficiency operation system, energy saving and CO2 emissions shall be addressed as important issue in railway system. These issues are the most essential factors of railway, compared to major public transportation system. Recently, saving energy in the electric railway system has been studied. For such new energy saving, the Energy storage system is considered for saving energy. Energy saving is possible by efficient use of regenerated energy. Regenerated energy is recycled amongst vehicles by mean of charge and discharge corresponding to powering and braking of electric vehicle operations. This energy saving contributes to cut CO2 to reduce greenhouse gas emissions. Recycling regenerated energy demonstrate significant effect on peak cut of consumption energy in railway substation. Absorption of excess energy avoids regeneration failure due to high traction voltage. This paper presents effects by applying the energy storage system to SeoulMetro Line 2.

  • PDF

Development of Gate Operation System Based on Image Processing (영상처리에 기반한 게이트 운영시스템 개발)

  • 강대성;유영달
    • Journal of Korean Port Research
    • /
    • v.13 no.2
    • /
    • pp.303-312
    • /
    • 1999
  • The automated gate operating system is developed in this paper that controls the information of container at gate in the ACT. This system can be divided into three parts and consists of container identifier recognition car plate recognition container deformation perception. We linked each system and organized efficient gate operating system. To recognize container identifier the preprocess using LSPRD(Line Scan Proper Region Detection)is performed and the identifier is recognized by using neural network MBP When car plate is recognized only car image is extracted by using color information of car and hough transform. In the port of container deformation perception firstly background is removed by using moving window. Secondly edge is detected from the image removed characters on the surface of container deformation perception firstly background is removed by using moving window. Secondly edge is detected from the image removed characters on the surface of container. Thirdly edge is fitted into line segment so that container deformation is perceived. As a results of the experiment with this algorithm superior rate of identifier recognition is shown and the car plate recognition system and container deformation perception that are applied in real-time are developed.

  • PDF

The Simulation Implementation on contact loss of high speed electric railway using a Power Line Disturbance simulator (전원외란 시뮬레이터를 이용한 고속전철 이선현상 모의 실험)

  • Kim, Jae-Moon;Kim, Yang-Soo;Chang, Chin-Young;Ahn, Jeong-Jun
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.2152_2153
    • /
    • 2009
  • In this study, the dynamic characteristic of a contact wire and pantograph suppling electrical power to high-speed trains are investigated from an electrical response point of view. To analysis power line disturbance by induced contact loss phenomenon for high speed operation, a hardware Simulator which considered contact loss between contact wire and the pantograph as well as contact wire deviation is developed. It is confirmed that a contact wire and pantograph model are necessary for studying the dynamic behavior of the pantograph system. One of the most important needs accompanied by increasing the speed of high-speed train is reduced that an arc phenomenon by loss of contact brings out EMI. In case of a high-speed train using electrical power, as comparison with diesel rolling stock, PLD(Power Line Disturbance) such as harmonic, transient voltage and current, EMI, dummy signal injection etc usually occurs. Throughout experiment, it is verified that an arc phenomenon is brought out for simulator operation and consequently conducted noise is flowed in electric circuit by power line disturbance.

  • PDF

A study of the train traffic optimal control system in a circular metro line (도시형 순환 열차에서 운전 최적제어 시스템에 관한 연구)

  • Hong, Hyo-Sik;Ryu, Kwang-Gyun;Song, Noon-Suck
    • Proceedings of the KSR Conference
    • /
    • 2003.10c
    • /
    • pp.236-246
    • /
    • 2003
  • This paper is implemented a control algorithm in order to be stable and minimized to entire train traffic system at delayed case. Signal ing system is described wi th algebraic equations given for train headway, Discrete-event simulation principles are reviewed and a demonstration block signaling model using the technique is implemented. Train congestion at station entrance for short headway operation is demonstrated and the propagation of delays along a platform of trains from any imposed delay to the leading train is also shown. A rail way signaling system is by nature a distributed operation with event triggered at discrete intervals. Although the train kinematic variables of position, velocity, and acceleration are continually changing, the changes are triggered when the trains pass over section boundaries and arrive at signals and route switches. This paper deals with linear-mode1ing, stability and optimal control for the traffic on such metro line of the model is reconstructed in order to adapt the circuits. This paper propose optimal control laws wi th state feedback ensuring the stability of the modeled system for circuits. Simulation results show the benefit to be expected from an efficient traffic control. The main results are summarized as follows: 1. In this paper we develop a linear model describing the traffic for both loop lines, two state space equations have been analyzed. The first one is adapted to the situation where a complete nominal time schedule is available while second one is adapted when only the nominal time interval between trains is known, in both cases we show the unstability of the traffic when the proceeding train is delayed following properties, - They are easily implemented at law cost on existing lines. - They ensure the exponetial stability of loop system. 2. These control laws have been tested on a traffic simulation software taking into the non-linearites and the physical constraints on a metro line. By means of simulation, the efficiency of the proposed optimal control laws are shown.

  • PDF

Expert System On Advanced load shedding (개선된 부하차단에 관한 전문가 시스템)

  • Kim, Jae-Chul;Kim, Eung-Sang;You, Mi-Bog
    • Proceedings of the KIEE Conference
    • /
    • 1991.07a
    • /
    • pp.354-357
    • /
    • 1991
  • In the case of system operation, a line overload cause damage to spread an whole range of power system. Of the theorems on load shedding, this study applied power distribution theorem and load reduction theorem which are local load shedding method, which are not affected by the magnitude of the power system and need not a large memory capacity and computation time. In this paper, we treat the problem of overload when power system occurred to fatal fault. Especially, there is the special case that local load shedding theorem is not always solved. Therefore, we introduce a solved device of the problem and construct the expert system of expanded local load shedding. Because proposed method uses the merits of expert system, in the case of system operation, the system operator don't embarrass to fatal fault and promptly deals with.

  • PDF

A Design Methodology on Signal Paths for Enhanced Signal Integrity of High-speed Communication System and a BIST Design for Backplane Boards Testing (고속 통신 시스템의 신호충실성 향상을 위한 선로 설계 방법론 및 Backplane Boards Testing를 위한 BIST 설계)

  • Jang, Jong-Gwon
    • The Transactions of the Korea Information Processing Society
    • /
    • v.7 no.4
    • /
    • pp.1263-1270
    • /
    • 2000
  • The operation frequency of High-speed Communication System becomes very fast with the advanced technology of VLSI chips and system implementation. There may exist various types of noise sources degrading the signal integrity in this system. The present main system is made of backplane, so faults can be brought whenever a board is removed, replaced or added. This backplane boards testing is a very important process to verify the operation of system. firstly, we model the effects of the internal noises in the High-speed Communication System to the signal line and propose a new design method to minimize these effects. For the design methodology, we derive the characterization value for each mode land them construct the optimal simulation model. We compare the result of own proposing method with that fo the existing methods, through simulation and show that the quality of High-speed Communication System is significantly enhanced. Secondary our proposing BIST for the Backplane Boards Testing is designed to guarantee that there is no fault in the high-speed communication system.

  • PDF

Fuzzy Rulebase Application for Estimation of Snow Accretion on Power Lines and Deicing Countermeasure Plan (퍼지 룰베이스에 의한 전선착설 예측 및 대책 지원 기법)

  • 최규형
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.9 no.10
    • /
    • pp.782-788
    • /
    • 2003
  • Making deicing countermeasure plan against snow accretion on power line is a very complicated problem, which should take into account both the possibility of accidents due to snow accretion on power line and the stable operation of power system. As knowledge engineering can be a good solution to this field of problems, a prototype expert system to assist power system operators in forecasting snow accretion on power lines and making a list of all the feasible and effective deicing countermeasures has been developed. The system has been remodelled into a fuzzy expert system by adopting fuzzy rulebase and fuzzy inference method to systematically process the fuzziness included in the heuristic knowledges. Simulation results based on the past snow accretion accident data show that the proposed system is very promising.

Development of On-line Condition Monitoring Program of a Turboprop Engine (터보프롭 엔진의 온라인 상태감시 프로그램 개발에 관한 연구)

  • Kong, Chang-Duk;Kim, Keon-Woo;Lim, Se-Myung;Kim, Ji-Hyun
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2010.05a
    • /
    • pp.295-299
    • /
    • 2010
  • Recently, development and application of the condition monitoring and diagnostic system for improvement of durability and reliability and reduction of operating cost is generalized in the aircraft propulsion system. Especially, for reliable operation of the UAV which is flying in high altitude more than 40,000 ft for a long time an condition monitoring system to identify faults and degradations of its propulsion system should be needed. Therefore, this work proposes an on-line condition monitoring program using MATLAB/SIMULINK. In the development phase of the program, a engine signal generation module is used to simulate real engine measuring parameters instead of the real engine. The proposed on-line condition monitoring program was applied to a real turboprop engine to validate its application capability.

  • PDF

Optimal Machine Operation Planning under Time-based Electricity Rates (시간대별 차등 전기요금을 고려한 최소비용 장비운용계획)

  • Kim, Inho;Ok, Changsoo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.4
    • /
    • pp.63-71
    • /
    • 2014
  • As power consumption increases, more power utilities are required to satisfy the demand and consequently results in tremendous cost to build the utilities. Another issue in construction of power utilities to meet the peak demand is an inefficiency caused by surplus power during non-peak time. Therefore, most power company considers power demand management with time-based electricity rate policy which applies different rate over time. This paper considers an optimal machine operation problem under the time-based electricity rates. In TOC (Theory of Constraints), the production capacities of all machines are limited to one of the bottleneck machine to minimize the WIP (work in process). In the situation, other machines except the bottleneck are able to stop their operations without any throughput loss of the whole manufacturing line for saving power utility cost. To consider this problem three integer programming models are introduced. The three models include (1) line shutdown, (2) block shutdown, and (3) individual machine shutdown. We demonstrate the effectiveness of the proposed IP models through diverse experiments, by comparing with a TOC-based machine operation planning considered as a current model.