• 제목/요약/키워드: System operation line

Search Result 1,499, Processing Time 0.027 seconds

On-Line Load Flow Program Development For Power System Diagnosis (계통진단용 ON-LINE 전력조류프로그램 개발)

  • Kwak, Jun-Hyuck;Baek, Young-Sik;Lee, Hee-Choon
    • Proceedings of the KIEE Conference
    • /
    • 2000.07a
    • /
    • pp.276-278
    • /
    • 2000
  • In KwangYang steel works power system operation, the ON-LINE application of power system diagnosis technology is indispensable to not only power quality, but also stable operation and economical generation. In cases of stability constraint violation. stable power system operation is obstructed. Steel works power system is consist of 154kV transmission lines, and 345, 154, 22, and 6.6[KV] distributed lines, 5 numbers of substation, 17 units of generators. For this power system operation. loadflow program is developed. Database is tied with Windows GUI application, is designed, and is interfaced with this program. This program put up with loadflow solution of assembled MMI power system, and planed to diagnose of overloads or to imitate entrance, and isolation of equipment.

  • PDF

Expert System for Line State Recognition of Distribution System (배전계통 선로상태 파악을 위한 전문가 시스템)

  • Kim, Yoon-Dong;Choi, Byoung-Youn;Mun, Young-Hyun;Song, Kyung-Bin
    • Proceedings of the KIEE Conference
    • /
    • 1988.11a
    • /
    • pp.111-114
    • /
    • 1988
  • With the increase of size and complicacy of power systems, distribution system need to operate effectively for high reliability. In order to achieve this purpose, the study which apply expert system to operating plan, restoration on fault and distribution system operating, has developing actively. The essential element of the study is system line state which make a system observe. The development of expert system on power system operation make a system be able to judge state of loading and looping system line, related current direction, substation, and distribution line, atomatically by breaker operation. Finally, this paper developed expert system which decides itself atomatically by rules for deciding system line state.

  • PDF

A Study on the Headway for PRT System (소형궤도차량 운전시격에 관한 고찰(1))

  • Kim Jong-Ki;Kim Baek-Hyun;Lee Jun-Ho;Lee Duck-Ho;Shin Key-Soe
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.831-835
    • /
    • 2005
  • In a signal control of the railway system, the first objective is to guarantee a safety of the train operation, and the second is to increase a frequency(a capability of the transportation) of the train operation. In order to express the capability of the transportation a terminology what is called a railroad line capacity is employed. The railroad line capacity means a maximum frequency of the train operation in a possible schedule of the one way operation for one day. During the last several years an improvement in the facilities of the train operation (railroad line extension, improvement in the stations, improvement in the signal facilities) has been achieved to increase the railroad line capacity. In this paper the authors deal with the case analysis which try to shorten headway and which has an impartible relation with increasing of the railroad capacity

  • PDF

A Simulation Evaluation of Aisle Design and Operation Policies for an Automated Storage and Retrieval System with Narrow-/Wide-Width Racks (다품종 조립라인 자동화 물류창고의 이형 랙 배치 및 운영정책 시뮬레이션 평가)

  • Bosung Kim;Jeongtae Park;Soondo Hong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.1
    • /
    • pp.68-75
    • /
    • 2023
  • In an automotive plant, an automated storage and retrieval system (ASRS) synchronizes material handling flows from a part production line to an auto-assembly line. The part production line transfers parts on small-/large-sized pallets. The products on pallets are temporarily stored on the ASRS, and the ASRS retrieves the products upon request from the auto-assembly line. Each ASRS aisle is equipped with narrow-/wide-width racks for two pallet sizes. An ASRS aisle with narrow-/wide-width racks improves both storage space utilization and crane utilization while requiring delicate ASRS aisle design, i.e., the locations of the narrow-/wide-width racks in an ASRS aisle, and proper operation policies affect the ASRS performance over demand fluctuations. We focus on operation policies involving a common storage zone using wide-width racks for two pallet sizes and a storage-retrieval job-change for a crane based on assembly-line batch size. We model a discrete-event simulation model and conduct extensive experiments to evaluate operation policies. The simulation results address the best ASRS aisle design and suggest the most effective operation policies for the aisle design.

A Study on the Improvement for the Substitute Block System of the Conventional Line (기존선 대용폐색방식 개선에 관한 연구)

  • Song, Nak-Kyoon;Kim, Hae-Gon;Kim, Ho-Soon;Kim, Dae-Sik;Joo, Chang-Hun
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.545-555
    • /
    • 2011
  • Presently, The Regular Block System(Automatic, Interlocking block system) is usually used during the operation of block section. However, In case that the regular block system fails because of the failure of the fixed signals and block equipment or in case of the unexpected emergency which should drive on the single line due to the accidents in the double line section or the repair work of the single line, the Substitute Block System to use the driving permission license(mapping ticket and paper) is used. In case of the operation of the opposite line and the temporary one line, the safety gets worse and the SBS may cause the fatal accidents such as a head-on & a rear-end collision. Also, the unmanned railroad stations has recently increased owing to the effective operation of the stations, for it is difficult to execute the SBS in their absence. As a result, the increase of the operation time made the train delayed. Being on the rise of these problems, in this study, we analyzed the problems and difficulties of the SBS on one line which is lacking stability and safety and on the sections combined between maned and unmaned railroad stations. And we proposed the suitable method in KORAIL referring to the examples of European & Japan railways lately. According to the passing of the high tech time, If the new SBS equipped with stability and safety is executed, it will contribute to the effective operation of trains and the satisfaction of KORAIL customers in the future.

  • PDF

A Study on the Data Visualization for Real Time Power System Operation (실시간 전력계통 운영을 위한 데이터 시각화에 관한 연구)

  • Chog, Yoon-Sung;Joung, Jinyoung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.10
    • /
    • pp.1361-1367
    • /
    • 2013
  • This paper describes and suggests the data visualization for real time power system operation based on energy management system. Because real time power system operation performs analysis of the vast amount of on-line data, the operators need intuitive data visualization to find out useful information in the big data. Especially, in emergency situation, the data visualization is able to assist the operators in handling the crisis quickly and efficiently. Therefore, this paper aims to improve displays of output of real time power system operation by visualizing on-line big data. Through this study, we can develop improved visualization technique for real time power system operation, which has highly readable displays of output and intuitive information.

A Study on ATS Control Procedure to adopt Low Density Line (저밀도 노선 적용을 위한 ATS 제어절차에 관한 연구)

  • Cho, Bong-Kwan;Park, Kee-Joon;Park, Pyoung-Sik;Lee, Young-Soo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.5
    • /
    • pp.830-837
    • /
    • 2015
  • A study which is to develop the low-cost urban railway system for low-density line such as Gwang-ju subway Line 2 is in progress, and its TCS(Train Control System) is required as an economic system which is able to train operation suitable in low-density line. We have developed the signaling equipment which is configured with automatic block system between stations, and the control center's equipment in order to meet the requirements of TCS mentioned above. In this paper, we propose the control procedure of ATS to be required for train operation management in the low-density line such as Gwang-ju subway Line 2. The control procedure of ATS considered all features such as the requirements analysis for train operation management, the functions of train control system to be applied and the block type. Also, it considered the station(interlocking, passenger, turn-back) type, station control(stop, route, departure, turn-back departure, turn-back) type, and train operation management for exiting and entering depot. The ATS control procedure proposed in this paper has an advantage in the cost and efficiency through unification and optimization of its function. And in cost of operating and maintenance, the ATS system has a feature that can be significantly reduced.

Characteristics Operation of a Flux-offset Type Fault Current Limiter in a Double line-to-line Fault (2선 단락 사고 시 자속상쇄형 한류기의 동작 특성)

  • Choi, Hye-Won;Choi, Hyo-Sang
    • Journal of Advanced Engineering and Technology
    • /
    • v.7 no.3
    • /
    • pp.131-135
    • /
    • 2014
  • In this paper was proposed a flux offset-type fault current limiter as means of reducing fault currents. To secure the operation reliability of a flux offset-type fault current limiter, constructed a simulation system to analyze its operation characteristics by generating a double line-to-line fault. According to the test results, the system performed stably without any impedance. However, when an accident occurred, the flux-offset of magnetic was not occurred. Because of this, any impedance occurred at circuit. It was confirmed that the impedance was low and fast to limit the fault current. At this time, the fault current limited rate was about 95%.

The Analysis of a Fishing System that Employs a Red Seabream Feeding Behavior in the Long Line Fishery (연승어업에서 참돔의 섭식행동을 응용한 어획시스템의 성능 분석)

  • KANG, Kyoung Bum;KOO, Myung-Sung;KIM, Jong Beom;AHN, Jang-Young;CHOI, Chan Moon;LEE, Chang Heon;KIM, Byoung Youb;KIM, Suk Jong
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.29 no.2
    • /
    • pp.570-580
    • /
    • 2017
  • In this study, we designed a fishing system to reproduce the underwater movement of the living Sword tip squid (Loligo edulis) used as bait in the red seabream long line fishery, and conducted the experiment of the fishing operation in 2 ways, i.e., a pole and line fishing method (fishermen) and a bait control fishing system used at fishing sites. Based on the catches in fishing operation, the experiment was conducted over a six times (2014 & 2015), and then 107 fishes were caught by the line fishing method while 57 fishes were caught by the bait control fishing system. The fishermen method actively controlled the speed of gear movement upward and downward while checking the reaction of red seabreams to the bite in the process which a jerk was transmitted to single line hook fishing gear manually. The bait control fishing system is a passive method which fishermen visually check only the movements at the end of fishing pole, enabled differentiation of bite reactions of red seabream during fishing operation. Thus, the difference between fishermen method and the bait control fishing system was found to about 53.3% in the catches. We confirmed the possibility of a site fishing operation based on the bait control fishing system designed newly as a result of this study. Improvement is in several areas for commercialization at the site. This fishing system is expected to be able to find wide-ranging applications as a new labor-saving method for the fishing red seabreams if it is applied to the fishing sites after aforesaid process.

A Study on Improvement Method of the Subway Signalling System Using Automatic Train Operation Device (자동열차운전장치를 이용한 도시철도 신호설비의 개량방안에 관한 연구)

  • Kang Sung-Gu;Choi Seung-Ho;Cho Bong-Kwan
    • Proceedings of the KSR Conference
    • /
    • 2003.10c
    • /
    • pp.145-150
    • /
    • 2003
  • The national subway went under construction in 1971, and after three years of endeavor, Seoul subway line number one opened for traffic in 1974. Line number two went under construction in 1978 and it opened for traffic in 1984. With the use of safety operation for more than 20 years, the life cycle nearly came to an end. Therefore the improvements for the safety operation are unavoidable. The total system should not be affected when the new and conventional systems are overlapped, the system operation is in the initial stage, and it confronts the situation of abnormal operation. However, there is a total lack of experience in construction and improvement for the trains that are in the use of large transport and density headway. In this paper, we propose an improvement method of the subway signalling system using ATO (Automatic Train Operation control scheme) to which the latest Digital ATC is applied, and examine the first application model of ATO system.

  • PDF