A Study on Operation Method of Power Distribution System Integrated with Dispersed Generation System (분산형전원이 도입된 복합배전계통의 운용방안에 대한 고찰)

  • Kim, Jae-Eon;Jo, Seong-Hyeon
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.6
    • /
    • pp.692-698
    • /
    • 1999
  • This paper analyzes the effect of DGS(Dispersed Generation System) on the voltage regulation of the traditional distribution system of which the voltage is controlled by the bank LDC(Line Drop Compensator). Through the simulation results for 22.9kV class distribution system with DGSs, some general relationships among the operating power factor and introduction limit of DGS, and the sending-end reference voltage determined by internal setting coefficients of the LDC are derived. Those relationships are that the introduction limit of DGS increases as the power factor of DGS goes from lagging to leading and also as the allowance of the sending-end reference voltage increases. From the relationships, a operation method of the power distribution system integrated with DGSs is proposed from the view point of the operating power factor of DGS and new voltage regulation method.

  • PDF

A Study on Robustness Analysis Model for Calculating Line Capacity in Railroad System (철도선로용량 계산을 위한 강인성 분석모형에 관한 연구)

  • Lee, Chang-Ho;Kim, Bong-Sun;Kim, Hak-Sik;Lee, Byung-Kwon;Kim, Dong-Hee;Hong, Sun-Hm
    • IE interfaces
    • /
    • v.16 no.spc
    • /
    • pp.111-115
    • /
    • 2003
  • Railroad system is consisted of resources of rail track, signal system, and vehicles. Railway operation must use these limited resources and maximize resource utilization. Line capacity(number of trains throughput/day) is determined by such as parameters, line utilization rate($\alpha$), dummy rate for the break-through hour($\beta$), and dummy rate for the number of rail track intervals($\delta$). Line capacity simulation(LCS) determined the line capacity through simulation given $\alpha$, $\beta$, and $\delta$. This paper deals with the development of parameter evaluation simulation(PES). PES presents the decision maker with the relationship of line capacity and measurement of robustness for various scenarios in different parameters and then the decision maker can determine the appropriate parameters.

Development of On-Line Partial Discharge Measuring System for Insulation Diagnosis of High-Voltage Motor Stator Windings (고압 전동기 고정자 권선의 절연진단을 위한 운전중 부분방전 측정 시스템 개발)

  • Hwang, Don-Ha;Kang, Dong-Sik;Shin, Byoung-Chol;Lee, Young-Jin;Lee, Kwang-Sik
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2006.05a
    • /
    • pp.481-486
    • /
    • 2006
  • In this paper, a new on-line high-voltage motor monitoring system is proposed. This system monitors the insulation condition of the stator winding by on-line measurements of partial discharge (PD). And this system displays magnitude and phase angle distribution of PD. Sensor, CC (Ceramic Coupler) is used for PD measurement. PD signals are continuously measured and digitized with a A/D converter to build the database of the high-voltage motor's insulation condition. Also, this system can communicate with the central monitoring system via RS-232, 422, and TCP/IP. This helps more efficient operation and maintenance of the high-voltage motor.

  • PDF

Headway Analysis in Daejeon Nord section(Daejeon shunting yard-Daejeon station) which high speed train and conventional trains will be run (대전북(대전 조차장-대전역) 고속전철 연계 운행 구간의 운전시격 분석)

  • Kim, Yong-Gyu;Kim, Jong-Gi;Yu, Chang-Geun
    • Proceedings of the KIEE Conference
    • /
    • 2003.11c
    • /
    • pp.810-813
    • /
    • 2003
  • The present headway on KNR(Korea National Railway) lines varies from 6 to 10 minutes depending on the each line and by the operation of High Speed line in 2004, the bottleneck would be expected within a few sections such as Daejeon-Daejeon shunting yard which will be the common mute between KTX(Korea Train Express) and conventional trains. Therefore, KNR would like to reduce the headway of the all lines by 4 minutes with the implementation of ERTMS/ETCS on-board system. Where ETCS(European Train Control system), the subsystem of ERTMS, is Automatic Train Protection system for safety train running. This study will be analyze expected braking distance and running time depending on characteristics of conventional passenger and freight trains and high speed train will be operated within electrified conventional line for comparing the headways of ATS(Automatic Train Stop) system and ETRMS/ETCS system within the Daejeon-Daejeon shunting yard section.

  • PDF

Development of On-line Displacement Monitoring System for High Temperature Steam Pipe of Fossil Power Plant (화력발전소 고온 증기배관 실시간 변위감시 시스템 개발)

  • Lee Young Shin;Hyun Jung Seob
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.22 no.6 s.171
    • /
    • pp.83-89
    • /
    • 2005
  • Most domestic fossil power plants have exceeded 100,000 hours of operation with the severe operating condition. Among the critical components of fossil power plant, high temperature steam pipe systems have had a many problems and damage from unstable displacement behavior because of frequent start up and shut down. In order to prevent the serious damage and failure of the critical pipe system in fossil power plants, 3-dimensional displacement measurement system was developed for the on-line monitoring. Displacement measurement system was developed with a use of a LVDT type sensor and two rotary encoder type sensors. This system was installed and operated on the real power plant successfully.

Development and Application of Pre/Post-processor to EMTP for Sequence Impedance Analysis of Underground Transmission Cables (지중 송전선로 대칭분 임피던스 해석을 위한 EMTP 전후처리기 개발과 활용)

  • Choi, Jong-Kee;Jang, Byung-Tae;An, Yong-Ho;Choi, Sang-Kyu;Lee, Myoung-Hee
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.10
    • /
    • pp.1364-1370
    • /
    • 2014
  • Power system fault analysis has been based on symmetrical component method, which describes power system elements by positive, negative and zero sequence impedance. Obtaining accurate line impedances as possible are very important for estimating fault current magnitude and setting distance relay accurately. Especially, accurate calculation of zero sequence impedance is important because most of transmission line faults are line-to-ground faults, not balanced three-phase fault. Since KEPCO has started measuring of transmission line impedance at 2005, it has been revealed that the measured and calculated line impedances are well agreed within reasonable accuracy. In case of underground transmission lines, however, large discrepancies in zero sequence impedance were observed occasionally. Since zero sequence impedance is an important input data for distance relay to locate faulted point correctly, it is urgently required to analyze, detect and consider countermeasures to the source of these discrepancies. In this paper, development of pre/post processor to ATP (Alternative Transient Program) version of EMTP (Electro-Magnetic Transient Program) for sequence impedance calculation was described. With the developed processor ATP-cable, effects of ground resistance and ECC (Earth Continuity Conductor) on sequence impedance were analyzed.

Exchanging of old electrical equipment and discussion of SCADA system's operation related with exchanging of old electrical equipment (노후전력설비 교체에 따른 SCADA시스템의 운용 고찰)

  • Kim, Youn-Sik;Park, Rai-Hyug;Lee, Gi-Seung
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.417-422
    • /
    • 2008
  • The DC high speed circuit breaker used in Seoul Metro for line no.1.2 is Japan HITACHI and FUJI breaker, and for line no.3.4 is Whipp & Bourne MM74 breaker from UK. The years that each breakers made are 1973(line no.1), 1984(line no.3.4), So that equipments are superannuated. Nowday the for equipment exchanging is executing, equipment for exchanging were used the Secheron breaker from Swiss. but now the Intec breaker made in Korea is used. The RTU of supervisory control and data acquisition system have the capabilities that can observe, control and work the installation efficiently. In this paper, as summarizing the solving process of problem that happened the SCADA system when old-equipment exchange and concerned point for logical supervision and control of reservation factors and equipment, I'll provide the direction that can do receiving-process of control-equipment, progressed with the exchange of old-electronic equipment.

  • PDF

Development of a Live-line Insulator Inspection Tool System for 154 kV Power Transmission Lines

  • Lee, Jae-Kyung;Park, Joon-Young;Cho, Byung-Hak;Oh, Ki-Yong
    • Journal of Electrical Engineering and Technology
    • /
    • v.7 no.1
    • /
    • pp.23-33
    • /
    • 2012
  • The current paper deals with a new live-line insulator inspection tool system that will be used by the Korea Electric Power Corporation for its 154 kV power transmission lines in 2011. Unlike the existing contact type tools, the developed inspection tool automates parts of the insulator inspection process using a sensor and an actuator. The tool sustains its weight independently, not by a lineman. In addition, the inspection tool measures the insulation resistance of an insulator together with its distribution voltage, thus providing more information for analysis and diagnosis. Such characteristics improve the system's operation efficiency, measurement reliability, and usability. We confirmed its effectiveness through live-line field tests with actual power transmission lines.

Systemic Development of Tele-Robotic Interface for the Hot-Line Maintenance (활선 작업을 위한 원격 조종 인터페이스 개발)

  • Kim Min-Soeng;Lee Ju-Jang;Kim Chang-Hyun
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.10 no.12
    • /
    • pp.1217-1222
    • /
    • 2004
  • This paper describes the development of tele-robotic interface for the hot-line maintenance robot system. One of main issues in designing human-robot interface for the hot-line maintenance robot system is to plan the control procedure for each part of the robotic system. Another issue is that the actual degree of freedom (DOF) in the hot-line maintenance robot system is much greater than that of available control devices such as joysticks and gloves in the remote-cabin. For this purpose, a virtual simulator, which includes the virtual hot-line maintenance robot system and the environment, is developed in the 3D environment using CAD data. It is assumed that the control operation is done in the remote cabin and the overall work process is observed using the main-camera with 2 DOFs. For the input device, two joysticks, one pedal, two data gloves, and a Head Mounted Display (HMD) with tracker sensor were used. The interface is developed for each control mode. Designed human-interface system is operated using high-level control commands which are intuitive and easy to understand without any special training.

A Study on the TRV(SLF) of Circuit Breakers According to Install Current Limit Reactors (345kV 고장전류 저감을 위한 한류리액터 설치시 차단기 TRV(근거리 고장시) 검토)

  • Park, H.S.;Kwak, J.S.;Ju, H.J.;Ryu, H.Y.;Han, S.O.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.371-373
    • /
    • 2005
  • An enhancement for a transmission and substation equipment in power system make the system impedance to be lower. In principle, if the system impedance become low, system stability will be better, but the fault current become very higher. It is a very big problem for CB operating. As a fact of CB operating performance, high amplitude of the fault current may cause CB operation failure because of exceeding standard value in TRV. So we simulated TRV by using the EMTP. Generally there are two types of TRV in actual power system. One is short line fault, the other is bus terminal fault. In this paper, we simulated the TRv at short line fault as installed current limit reactors to reduce fault current in 345kV ultra-high voltage system. Short line fault is caused from single line fault in transmission line.