• Title/Summary/Keyword: System operation line

Search Result 1,500, Processing Time 0.031 seconds

Implementation Technique of Real-time Monitoring System for High-Speed Rail Contact Wire with High Tension (고속철도 전차선로 고장력 실시간 모니터링 기술 구현)

  • Cho, Yong Hyeon;Park, Young;Jung, Hyun Jin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.8
    • /
    • pp.1256-1261
    • /
    • 2015
  • Along with the increase of railway catenary system operation speed to 400 km/h, there have been growing demands for good quality current collection systems that satisfy quality standards as well as criteria for safe working. Retaining uniform elasticity tension of contact wires is essential in maintaining high quality contact between pantograph and OCL (Overhead Contact Line) of current collection systems in high speed railways. Therefore, the tension of contact wire must be kept within tight tolerance limits in both working conditions and adverse weather conditions of catenary system. In accordance with these conditions, this paper presents a real time monitoring system for the tensioning device of the newly installed catenary system on the special route of Honam high speed line for 400 km/h operation. For the verification of the true value of tension of contact wires, we have developed ring-type tensioning sensors which were installed on supporting points of mast which compose the catenary system. According to the field test performed on the Honam high speed line catenary system, variation of tension was measured accurately in real-time.

Investigation of On-line Monitoring Method on 1500 V Direct Current Cable of Subway

  • Shen, Xiaojun;Jiang, Xiuchen;Yi, Zeng
    • Transactions on Electrical and Electronic Materials
    • /
    • v.7 no.5
    • /
    • pp.247-251
    • /
    • 2006
  • The traction DC feeder cable is one of the key devices for the safety operation of subway system, but for low voltage DC feeder cable (<3000 V) for subway, little attention has been paid by investigators on its online monitoring technology. With an introduction of cable laying and operation environment for the cable, this paper investigated the on-line monitoring technology of 1500 V DC feeder cable of subway. Firstly, in the text, the fault model of 1500 V DC cable was proposed based on the analysis of the fault type of the DC feeder cable, and then put forward synthetically on-line monitoring discharge signal and DC leakage current signal to assess DC feeder cable insulating state. The results of laboratory experiment prove that the proposed methods are feasible and can be implemented on-line monitor on DC feeder cable of subway.

A study of eatablishing ETCS Level 1 to speed up conventional lines (기존선 속도향상을 위한 ETCS Level 1 구축방안 연구)

  • Yoon, Yong-Ki;Jeong, Rag-Gyo;Kim, Chae-Duck
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.666-670
    • /
    • 2011
  • ATS(Automatic Train Stop)s are is effected by track environment, signal distance and train braking distance. So onboard signaling systems such as ATP(Automatic Train Protection) are installed on conventional lines by some train operation companies. With the mixed signalling, the onboard signaling system is overlaid on a conventional line with ATS, it is possible to run the line with conventional trains and ATP trains and to use the advantages of ATP(higher speed or more trains on the line). This paper includes guidelines a mixed signalling(ETCS and ATS) system architecture, operation concepts and infill balise installation.

  • PDF

KTX Impact on Train Operation Pattern ; An Empirical Analysis (KTX 개통후 서울~천안구간의 열차운행패턴 분석)

  • Lee Jin-Sun;Kim Kyoung-Tae
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.6 s.31
    • /
    • pp.507-512
    • /
    • 2005
  • Railroad transportation system has experienced major changes due to KTX introduction. Kyungbu corridor especially Seoul to Cheonan has line capacity problem and its solution has been a primary concern to researchers and policy decision makers. This study explored pattern of train operation between Seoul and Cheonan after the introduction of KTX in 2004. Both the number of trains and available seat capacity per day have increased but maximum number of trains per specific hour has not been changed much. Demand for train shows that if concentrated in a specific time, so number of trains during the peak hour should be increased. But, it is difficult ? 새 line capacity, so increasing seat capacity per train might be an option. An increase in an avaliable sear should be considered the characteristics of each train lines.

Regenerative Inverter System for Railway with DC Line Voltage Simulator (직류가선전압 모의장치를 적용한 지하철용 회생인버터 시스템)

  • Ji, Young-Hyok;Cho, Ki-Hyun;Jang, Su-Jin;Won, Chung-Yuen;Kim, Yong-Ki
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1515-1521
    • /
    • 2007
  • In this paper, a unified regenerative inverter system for railway with DC line voltage simulator is proposed. In order to determine the operation characteristics of the regenerative inverter, the DC line voltage simulator is proposed. The DC line voltage simulator, which is based on the AC-DC PWM converter, varies the DC voltage according to the fluctuating voltage which is measured in the actual DC line. The suitable operating point of the regenerative inverter can be estimated from the simulation result. The regenerative inverter operates two modes. When the DC line voltage exceed the operating point, already set up, it works as regenerative inverter to return the excessive power of DC line to the grid. When the DC line voltage is under the operating point, it works as active power filter to compensate harmonic currents. In this paper, the control algorithm of the DC line voltage simulator and that of the regenerative inverter is proposed.

  • PDF

Security Control of Power Systems (전력계통의 신뢰도제어 -상정사고해석을 중심으로-)

  • 양흥석;박영문
    • 전기의세계
    • /
    • v.26 no.3
    • /
    • pp.84-91
    • /
    • 1977
  • A modified version of algorithm and computer program is proposed to improve the currently available contingency analysis methode for the security control of power system. The underlying principle is based upon the reasonable modification of the current methods suggested by Stagg, Tinny, Alsac, and Stott in consideration of speed, aceuracy, reliability and convergency characteristics. The algorithm and program are desirgned especially for On-Line operation, although Off-Line applications are readily available. Several case studies on the Koren Power Company's 48-bus, 91-line system have shown that the method proposed is efficiently powerful in a sense of practical applicability.

  • PDF

Sharing On-line Storage with Various Flat Forms of Information Devices

  • Song, Seok-Il;Kwak, Yoon-Sik
    • International Journal of Contents
    • /
    • v.3 no.3
    • /
    • pp.38-42
    • /
    • 2007
  • In this paper, we propose a new storage system architecture called as U-Storage (ubiquitous storage system). U-Storage allows a user to access an on-line storage with any type of information devices that are able to connect to internet. The on-line storage is virtualized to the user's information devices as a local hard disk or a memory card by our U-Storage. With devices supporting U-Storage, users can read and write their data anytime and anywhere without downloading and uploading operation.

A Fast Approximation Algorithm for Calculating the Operating Cost Considering the Transmission Line Outage (선로사고를 고려한 간략화 운전비계산에 관한 연구)

  • 박영문;백영식
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.32 no.10
    • /
    • pp.360-366
    • /
    • 1983
  • In this paper, operation cost of the system is calculated by the probabilistic simulation method. And it is proved that only 20 iterative simulations are enough to get the result obtain by the Monte Carlo simulation method which requires more than 1000 iterative simulations. In the probabilistic simulation method we use the ranking of line contingency which is derived from the line countingency selection algorithm proposed in (2). In using this method the nature of the sparsity of the power system is used.

The Development of a Remote Control System Based on Power Line Modem and Telephone for Safe Operation of the Indoor Gas Range (전력선 모뎀 및 전화를 이용한 가정용 가스레인지의 원격 제어 시스템 개발)

  • 최승지;박종연
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.27 no.7C
    • /
    • pp.723-727
    • /
    • 2002
  • In this paper a new remote control system for operating indoor gas(LPG) range safely based on PLM(Power Line Modem) and telephone is developed because it would make disasters of properties and lives by user's carelessness or worker's bad installation, etc. The system includes the following elements: a telephone line interface system for user to call from the outdoors to the indoors, a communication system using the power line as a communication media, a system of cutting off gas and a alarm system.

Feasibility Check of Maintenance Period by The Operating Reliability of EMU-Focusing on the Main Components of Ansan Line EMU- (전기동차의 운행 신뢰성을 통한 유지보수주기의 타당성 검토 -안산선 전기동차의 주요부품을 중심으로-)

  • Park, Su-Myung;Song, Moon-Shuk;Son, Young-Jin;Lee, Hi-Sung
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1412-1417
    • /
    • 2011
  • Safety is soaring up as a core value in accordance with the recent improvement of operating speed & incidents. rolling stock is a kind of system which works together with several components. one component has an effect on the sub-system, which can cause to the train safety operation, therefore reliability management of the major components of rolling stock is a kind of solution to the safety operation of train, but realistically maintenance in korea performed based on period rather than TBO of major components, but Japan does new maintenance system based on the major components, which optimizes maintenance tasks. actually Japan can apply to new maintenance system because they are ready in planning step but in this study, making a reliability data of major components and review the adaptability of new maintenance system to the rolling stock operating in Ansan line.

  • PDF