• Title/Summary/Keyword: System operation line

검색결과 1,499건 처리시간 0.023초

복선구간의 단선운행 방안 시뮬레이션 (Single line Operation in a double line)

  • 정의진;김종기;이재호;조봉관;김양모
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 A
    • /
    • pp.384-386
    • /
    • 1998
  • In the emergency case such as a single line operation in a double line section because of a line broken or train's mal-operation, single line equipments that can operate without a line indication are needed. The main purpose of this study is to verify and analyze the availability of the single line operation that is able to operate without the indication of up or down line, and to offer a realizably alternative method to improve this situation. In order to carry out this study, we concentrated on getting related information. And to adopt the single line operation to existing line, the technology survey of other countries signalling system and the technical analysis of the interior signalling equipment were performed. As a result of this study, the required system and effect of the single line operation system were represented.

  • PDF

한국형경량전철 시험선의 관리 및 운영 (Management and operation of K-AGT test line)

  • 한석윤;전봉룡;이호용;이안호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.964-967
    • /
    • 2006
  • Korea Railroad Research Institute (the following 'KRRI') built AGT test line in Gyeong San-city, Kyongsang-bukdo province, Korea on August, 2004. This test line is exclusively used for the test of the driverless rubber-tired AGT system, and applied with research result of AGT System Development Project like vehicles, power supply, control and signaling, track and infrastructure system. The test line is available for the test of rubber tired AGT system's performance, function, safety. In this paper, we described the operation system of test line for the test of performance, safety, reliability, and also system operation in emergency. Finally we present the operation result of test line.

  • PDF

열처리공정의 지능형 웹 모니터링 산업용 공정제어 시스템 개발 (The Development of Industry Operation Control System using Intelligent Web Monitoring for the Heat Treatment Process)

  • 오재호;배효정;최기수;안두성
    • 동력기계공학회지
    • /
    • 제9권4호
    • /
    • pp.181-186
    • /
    • 2005
  • Because of advanced control technology, Shop floor control system of various kinds of equipment and machinery need a web based remote monitoring to control process efficiently. This paper presents the development of Operation Control System. Operation Control System(OCS) is based on intelligent web monitoring, so that OCS is improved the working condition for the line of heat treatment process and the product's quality. The developed OCS is consisted of Atmega128(MCU) based on embedded system, running the data logging of the line of heat treatment process. Web monitoring system is based on CS8900 ethernet controller and TCP/IP for remote monitoring responsibility between a server and clients and controlling the progress of entire system. The developed OCS is implemented on the line of heat treatment process and shows the improvement of environment condition, product's quality and efficiency of process line.

  • PDF

차세대 전동차 대불선 시운전 시 유지보수방안 연구 (A study on advanced EMU's maintenance program on test operation in Dabul line)

  • 김영규;박세영;송정훈;안천헌;이한민
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.2215-2222
    • /
    • 2010
  • Advanced EMU have been enhanced in terms of safe transport and maintainability. It is a new urban railway technology that enables an operation institution to cut repair and maintenance costs and customers to use convenient service at lower costs based on IT technology. If a development vehicle of Advanced EMU is completed, it will be used to test the entire advanced EMU system through sufficient performance check and reliability check prior to operation in commercial line. It will also verify efficiency, safety, punctuality and energy efficiency of transport. Accordingly, it is necessary to figure how to repair and maintain vehicles to enhance safety of Advanced EMU system in cooperation with operation during the period of comprehensive evaluation on the operation of a development vehicle in a test line. In this paper, we investigated the maintenance program of Advanced EMU on test operation in Dabul line. The test condition and operation environment of Advanced EMU in Daebul line was analyzed.

  • PDF

2회선 송전선로에서 상호임피던스와 고장저항을 고려한 거리계전기의 동작 특성 연구 (A Study on Adaptive Distance Protection of Double-circuit Line with Mutual Impedance and Fault Resistance)

  • 이원석;정창호;김진오
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권4호
    • /
    • pp.221-226
    • /
    • 2004
  • Power system has recently used Double-circuit Line and Multi-circuit Line in the industrial development. This has an advantage of system stability and reliability, but the complexity of the system has a disadvantage that makes it difficult to protect the power line. Double-circuit Line has two operation conditions in the Single-circuit operation and Double-circuit operation, so it has mutual impedance. To make it possible for the remaining single-line to operate independently while there is a fault with first line or when maintenance is needed, a trip region for the single-circuit operation should be set in order to set the relay trip region. An optimal trip region for each operation, a different operational conditions for the relay setting should be calculated. In this paper, trip regions of each operation condition have been compared by considering mutual impedance and fault resistance that led to the calculation of fault impedance. Also, as we know that one of the advantages in the distance relay is the back-up protection, we calculated the trip region(Zone-2) in consideration of the mutual impedance.

2회선 송전선로에서 상호임피던스와 고장저항을 고려한 거리계전기의 동작 특성 연구 (A Study on Adaptive Distance Protection of Double-circuit Line with Mutual Impedance and Fault Resistance)

  • 이원석;정창호;김진오
    • 대한전기학회논문지:전기기기및에너지변환시스템부문B
    • /
    • 제53권4호
    • /
    • pp.221-221
    • /
    • 2004
  • Power system has recently used Double-circuit Line and Multi-circuit Line in the industrial development. This has an advantage of system stability and reliability, but the complexity of the system has a disadvantage that makes it difficult to protect the power line. Double-circuit Line has two operation conditions in the Single-circuit operation and Double-circuit operation, so it has mutual impedance. To make it possible for the remaining single-line to operate independently while there is a fault with first line or when maintenance is needed, a trip region for the single-circuit operation should be set in order to set the relay trip region. An optimal trip region for each operation, a different operational conditions for the relay setting should be calculated. In this paper, trip regions of each operation condition have been compared by considering mutual impedance and fault resistance that led to the calculation of fault impedance. Also, as we know that one of the advantages in the distance relay is the back-up protection, we calculated the trip region(Zone-2) in consideration of the mutual impedance.

표준전동차 자동/무인운전장치 개발 및 주행시험 (Development and Test of Automatic/Driverless Operation System for Standardized EMU)

  • 안태기;이수길;한성호;이관섭
    • 한국철도학회논문집
    • /
    • 제3권3호
    • /
    • pp.154-160
    • /
    • 2000
  • The automatic/driverless operation which are great important techniques in metro railway are required to increase higher safety, greater reliability, and transport capacity. To satisfy such demands, we must have the system design and testing technique for the railway system operation. These techniques are related to the onboard train control and communication systems which include TCMS(Train Control and Monitoring System), ATO(Automatic Train Operation), ATC(Automatic Train Control), and TWC(Train to Wayside Communication). These sub-systems must be interfacing with not only each others but also the signal system on the ground. We tested the train control system on Test line that has been developed on the basis of the standardized type EMU for korea railway systems. This test line which is located in Sangju, have been constructed for testing 7 & 8 line of Seoul Metro railway.

  • PDF

표준전동차 자동/무인운전기술 개발 및 시운전에 관한 연구 (Test operation and development of Automatic/Driverless operation system for the standardized type EMU)

  • 한성호;안태기;이수길;이관섭;김원경;최규형
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2000년도 춘계학술대회 논문집
    • /
    • pp.172-179
    • /
    • 2000
  • The automatic/driverless operation which are great important techniques in metro railway are required to increase higher safety, greater reliability, and transport capacity. To satisfy such demands, we must have the system design iかd testing technique for the railway system operation. These techniques are related to the onboard train control and communication systems which include TCMS(Train Control md Monitoring System), ATO(Automatic train Operation), ATC(Automatic train Control), and TWC(Train to wayside communication). These sub-systems must be interfacing with not only each others but also the signal system on the ground. We tested the train control system on Test line that has been developed on the basis of the standardized type EMU for korea railway systems. This test line which is located in Sangju, have been constructed for testing 7 & 8 line of Seoul Metro railway.

  • PDF

기존선 틸팅차량 시스템 설계에 관한 연구 (The Study for System Design of Tilting Car for Conventional Railroad)

  • 유원희;한성호;김남포;김길동;박광복
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 춘계학술대회 논문집
    • /
    • pp.317-329
    • /
    • 2002
  • This report was studied about system design of tilting car for speed up for conventional railroad of KNR. The maximum operating speed of Kyun-Pu line was recorded a 140km/h by saemaul train at 1985 and the average speed its is 107km/h now. The chungang line, janghang line and honam line of KNR had rebuilt to the electrified line for operation of tilting train. This report was described about the operation status of advanced countries, the operation situation of trains of KNR, system design for operation and speed up by EMU tilting train on the conventional railroad in the future.

  • PDF

수도권 순동 무효전력 확보를 위한 FACTS 협조제어 시스템 온라인 설치 (Installation of MFC(Multiple FACTS Coordinated control) On-line System for the Spinning Reserve of a Reactive Power in Metropolitan Area)

  • 장병훈;문승필;하용구;전웅재
    • 전기학회논문지
    • /
    • 제59권12호
    • /
    • pp.2131-2134
    • /
    • 2010
  • In this paper, the on-line system schemes for coordinated control system of multiple FACTS were presented to enhance the voltage stability around the metropolitan areas. In order to coordinated control system of FACTS devices, MFC on-line system calculates the optimal set point(Vref, Qrev) of FACTS devices using the coordinated control algorithm with real time network data which is transferred from SCADA/EMS system. If the system is unstable after contingencies, the new operation set-point of FACTS would be determined using bus sensitivity from tangent vector at voltage instability point. Otherwise, we would determine the new operation set-point of FACTS for considering economical operation, like as active power loss minimization using Optimal Power Flow algorithm. As the test, MFC(Multiple FACTS Coordinated control) on-line system will be installed in Korea power system.