• Title/Summary/Keyword: System etc

Search Result 9,126, Processing Time 0.043 seconds

An Implementation of UWB IR System for Long Distance and High-precision Localization (장거리 고정밀 측위를 위한 UWB IR 시스템 구현)

  • Kim, Ki-Yun;Kim, Gil-Gyeom;Kim, Tae-Kwon
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.30 no.1
    • /
    • pp.87-95
    • /
    • 2016
  • Recently, the interests of the precise localization are rapidly increasing, which are linked to IoT(Internet of Things) sensors. The precise localization in indoor environment can be utilized in navigation, security, anti-collision, and various location based services etc. However, conventional positioning sensors, such as PIR, ultrasonic, microwave etc. are vulnerable to weather or insensitive to direction of subject movement or low precision performance. In this paper we implement a UWB-IR localization system for long distance and high-precision localization, which is not affected by temperature, light and weather. The proposed system was divided and designed by H/W, Antenna, S/W parts, each of which was designed based on an accurate analysis and simulation. As a result, we can implemented and verified UWB IR system with precise localization performance.

A GIS Based Decision Support System for Prospects Screening and Evaluation

  • Yanqing, Yu;Xincai, Wu;Ge, Zhang;Xiaoming, Luo;Feng, Li
    • Proceedings of the KSRS Conference
    • /
    • 2003.11a
    • /
    • pp.310-312
    • /
    • 2003
  • This paper discusses a GIS based decision support system that provides functions of prospect screening and evaluation in both technical aspects (Volume, structure, trap, reservoir and charge, etc.) and economic aspects (Net present value, Profit / investment Ratio, etc.). The decision support system has been tested in a virtual offshore exploration prospect to facilitate and improve the decision making process. The study represents a test bed for decision makers at all levels to establish prospect screening and evaluation guidelines that may be applicable to other related prospect investment issues.

  • PDF

A method against interface disharmony before opening of a new subway line (신설 지하철 노선의 설비별 인터페이스 부조화 방지를 위한 방안 연구)

  • Min, Young-Ki;Lee, Jong-Seong;Kim, Kyoung-Shik;Kang, Deok-Won
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1333-1343
    • /
    • 2008
  • Normally, the government or a local autonomous entity selects urban railway(subway, light rail transits etc.) system after investigating logicality about a route and announcing officially for people's convenience if the system is decided, suppliers of equipment(train, transformer, trolly wire, signal, communication, PSD, AFC etc.) are selected and ordering go forward. Stabilization of a total system is need for smooth train operation before opening to traffic by design, installation, total trial operation So, a measure against interface disharmony between each equipment is need. This treatise deals with the systematic method of management and items for interface plan from system design to opening on the evidence of experience of Gwangju subway total interface.

  • PDF

A Study on the Optimal Allocation of Maintenance Personnel in the Military Emergency Maintenance System Considering the Property of Impatience (Impatience 특성을 고려한 군 긴급정비시스템 정비인력 최적할당 연구)

  • Kim, Sungwoo
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.24 no.4
    • /
    • pp.449-456
    • /
    • 2021
  • Impatience characteristics are an important factor to be considered in the defense field, which is sensitive to time, but there are not many cases applied. In addition, due to the difficulty of analysis that must consider various probabilistic factors (breakdown/maintenance distribution, impatience characteristics, etc.), military decision makers consider only simple data (number of occurrences per year, maintenance time, etc.) Therefore, in this study, a model capable of analyzing the performance of the emergency maintenance system for determining the appropriate size and organization of military and civilian maintenance personnel was presented in consideration of impatience characteristics and probabilistic factors. And through numerical analysis, the appropriate size of the military and civilian emergency maintenance teams was analyzed. This study is significant in that it can improve readiness of operational power and prevent waste of defense budget through efficient operation of the military's emergency maintenance system.

Optimization of Earthwork Operation for Energy-saving using Discrete Event Simulation

  • Yi, Chang-Yong;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.537-539
    • /
    • 2015
  • considerate operation is a major issue in the equipment-intensive operation. Identifying an optimal equipment combination is important to achieve low-energy operations. An Earthwork operation planning system, which measures the energy consumption of construction operations by taking into account construction equipments' engineering attributes (e.g., weight, capacity, energy consumption rate, etc.) and operation conditions (e.g., road condition, attributes of materials to be moved, geometric information, etc.), is essential to achieve the low-energy consumption. This study develops an automated computerized system which identifies an optimal earthmoving equipment fleet minimizing the energy consumption. The system imports a standard template of earthmoving operation model and compares numerous scenarios using alternative equipment allocation plans. It finds the fleet that minimizes the energy consumption by enumerating all cases using sensitivity analysis. A case study is presented to verify the validity of the system.

  • PDF

A Study on the Construction of Test circuit and Unification of Experiment Method for High Voltage Gas-insulated Load Switch using High Power Testing System (특고압 가스 절연 부하 개폐기의 통합형 대전력 시험 방법 및 회로 구성에 관한 연구)

  • Jung, Heung-Soo;Kim, Min-Young;Kim, Juen-Suk
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.12
    • /
    • pp.36-46
    • /
    • 2008
  • This paper is to study on the Construction of Test circuit and Unification of Experiment Method for high voltage gas-insulated load switch using high power testing system The high power testing system is a equipment to verify electrical and mechanical performance on electrical product. The system consist of short-circuit generator, back-up breaker, making switch, impedance, high voltage transformer, low voltage transformer, measuring and protection system, etc. Using this system, we can test related to high power, for example, short-time current test, active load Current test, magnetizing Current test, capacitive current test, closed loop current test, etc. Standards of high voltage gas-insulated load switch that is in use domestic distribution line are ES 5925-0002, IEC 60265-1, IEC 62271-1 and IEEE C 37.74, etc. In this paper, we standardized on the test procedure, organization of test circuit and analysis of measured data prescribed many difference standards, and applied this test method to 600[MVA] high power testing system. So that we can test the load switch satisfied standards.

A Study on the Regulations of National R&D Performance Management System (국가연구개발 성과관리 법제 운영에 관한 소고)

  • Yoon, Chong-Min
    • Journal of Korea Technology Innovation Society
    • /
    • v.17 no.3
    • /
    • pp.519-539
    • /
    • 2014
  • In order to accomplish the successful performance management of the national research and development programs, it is necessary to establish the legal system that provide a institutional foundation and to set up and practice the relative substantial operating system. This paper aims to study the problems and improvement measures of the Performance Management System in National R&D Programs. For this purpose, the development of legal system on the performance management in national R&D programs was surveyed, the problems in existing laws and ordinances on the performance management were analyzed, and lastly the improvement measures on the legal system of the performance management were suggested. The legal system of performance management is being composed of and managed with The Framework Act On Science And Technology that prescribed the national science and technology policy direction, and Act On The Performance Evaluation And Management Of National Research And Development Projects, Etc. that prescribed the basic policies of performance management process and methods, and Regulations On The Management, Etc. Of The National Research And Development Projects that prescribed the concrete methodologies on performance management. Results of the study, it is necessary that the performance management laws and ordinances need improvement of Compatibility, the object and range of performance management system extend more widely to the whole field of national R&D programs in principle, and the performance management process and methods improve reasonably considering the goal and direction of national R&D policy.

The system integration of sounding rocket (고공탐사 로케트 개발에 관한 시스템 Integration)

  • 김두환;류장수;승성표
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1988.10a
    • /
    • pp.627-632
    • /
    • 1988
  • Through the introduction and understanding of the total system design and the system integration for sounding rocket with the purpose of the pure scientific research, that is, atmospheric research, resources observation, space observation and etc, the system will be operated easily, readily and effectively in the development and manufacturing of launching vehicles for the scientific satellite and communication satellite in the future.

  • PDF

Real-time system control for the 6-DOF simulation (6-DOF 시뮬레이터의 real-time 시스템 제어에 관한 연구)

  • 김영대;김충영;백인철;민성기
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1989.10a
    • /
    • pp.17-21
    • /
    • 1989
  • 6-DOE simulator system is designed to real-time processing for motion control, data acquisition, image generation and image processing etc.. In this paper, we introduce hardware and software design technologies for distributed processing, event-trapping, system monitoring and time scheduling procedure in 6-DOF simulator system design.

  • PDF

A Successful Strategy of Certification for Integrated Management System (통합경영시스템 인증의 성공적인 전략방안)

  • 최성운;김복만
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.24 no.65
    • /
    • pp.75-80
    • /
    • 2001
  • This paper is to propose the successful strategy of certification for Integrated Management System(IMS) to achieve integration of quality, environmental, and occupational and safety management system, etc. This paper is also to present compatibility, integration and alignment IMS models.

  • PDF