Kori Unit 1 is planning a system decontamination project to reduce radiation exposure of decommissioning workers, prevent the spread of contamination and down-grade the level of classification of radioactive waste. The system decontamination range for Kori Unit 1 will be the entire primary system, including RCS, CVCS and RHRS. Some system design modifications are required for the system decontamination operation. In this paper, major system design modifications were evaluated based on the conditions that system restoration is needed after completion of system decontamination. The major system design modifications are CIDF connection location to system, system decontamination operating pressure control, RCP seal water injection and formation of letdown flow. It was evaluated that there was no negative effect on the system due to the system design modifications. However, as the RCP seal water is injected into the system in the oxidation process, the concentration of the oxidizing agent is diluted. Therefore, the oxidizing agent injection and system decontamination operation procedures should be developed to address the dilution effect of the oxidizing agent. The system design modifications dealt in this paper will be finally confirmed through on-site investigation in the future, and if necessary, the system design modifications will be re-evaluated.
This paper presents the development of the remotely operated decontamination systems for use in a highly radioactive zone of the DUPIC Fuel Development facility of the Irradiated Material Examination Facility at the Korea Atomic Energy Research Institute. The remotely operated decontamination systems were designed to completely eliminate human interaction with hazardous radioactive contaminants. These decontamination systems are mainly classified into three systems depending on the task environment - a fabrication equipment decontamination system, a hot-cell floor decontamination system, and an isolation room floor decontamination system. A decontamination system for contaminated fabrication equipment utilizes dry ice pellet blasting method to decontaminate contaminated surface of the equipment. The decontamination systems for the hot-cell floor and isolation room floor employ a vacuum cleaning method to decontaminate the contaminated floor and collect loose dry spent nuclear fuel debris and other radioactive waste placed on the floor. The human operator from the out-of-cell performs a series of decontamination tasks remotely by manipulating decontamination systems located in-cell via a handcontroller with the aid of vision feedback information. The environmental, functional and mechanical design considerations, control system and capabilities of the remotely operated decontamination systems at a high radioactive environment are also described.
Ayantika Banerjee ;Wangkyu Choi ;Byung-Seon Choi ;Sangyoon Park;Seon-Byeong Kim
Nuclear Engineering and Technology
/
제55권5호
/
pp.1892-1900
/
2023
A protective oxide layer forms on the material surfaces of a Nuclear Power Plant during operation due to high temperature. These oxides can host radionuclides, the activated corrosion products of fission products, resulting in decommissioning workers' exposure. These deposited oxides are iron oxides such as Fe3O4, Fe2O3 and mixed ferrites such as nickel ferrites, chromium ferrites, and cobalt ferrites. Developing a new chemical decontamination technology for domestic CANDU-type reactors is challenging due to variations in oxide compositions from different structural materials in a Pressurized Water Reactor (PWR) system. The Korea Atomic Energy Research Institute (KAERI) has already developed a chemical decontamination process for PWRs called 'HyBRID' (Hydrazine-Based Reductive metal Ion Decontamination) that does not use organic acids or organic chelating agents at all. As the first step to developing a new chemical decontamination technology for the Pressurized Heavy Water Reactor (PHWR) system, we investigated magnetite dissolution behaviors in various HyBRID inorganic acidic solutions to assess their applicability to the PHWR reactor system, which forms a thicker oxide film.
Decontamination of systems, structures and components (SSC) during the decommissioning of a Nuclear Power Plant (NPP) can be for a variety of reasons. The main reasons for decontamination are: to reduce the contamination of SSC to a reasonably low level, to reduce the potential for the spread of contaminants into the environment and to reduce the cost of disposal due to the reduced level of contamination in a particular SSC. The decontamination technique can be aggressive or non-aggressive depending on the intent after the decontamination process. Aggressive decontamination technique is used when the intent is not to reuse the SSC while a non-aggressive decontamination technique is used with the intent of SSC reuse. For different SSCs there are different decontamination techniques that can be used, each having its own advantages and drawbacks. Metal components such as pipes in the nuclear power plant account for a large amount of nuclear wastes generated. Some of these wastes can be reused if the contaminant level is reduced to an acceptable level. Laser ablation is a non-aggressive decontamination technique that can be used to reduce the contamination in pipes to an acceptable level with no secondary waste generated during the process. The operation and control of a laser ablation device must be precise to achieve a high decontamination factor. This precision can be achieved by a well-designed motion control system. For this purpose, a motion control system was developed consisting of two parts: the first part being the precise control of the laser ablation device inside the pipe and the second part is the control of the laser ablation device outside the pipe. This paper describes the Systems Engineering approach for the development process of a motion control system for the Laser decontamination system.
A pool scrubber is often used as a wet-type design to mitigate the consequence of a severe nuclear accident. While studies indicated higher decontamination performance of a deeper pool, utilizing a very tall pool can be problematic due to potential structural stability and water backflow issues. This study proposes, as an alternative to a single pool system, a pool scrubber system composed of serially connected multiple pools with lower heights. Since large fraction of aerosol removal takes place in the injection region, serially connected pool scrubber system is expected to enhance the overall decontamination capability of a pool scrubber system. To support the analysis of the proposed system's decontamination capability, a new computer model was developed in the study to describe the bubble size dependent effect on aerosol removal including the effect of pool residence time. The accuracy of the new model was examined against experimental data for its validation. The proposed scrubber system composed of serially connected multiple shorter pools is found to have much improved decontamination performance over the current single pool system design.
In this study, applicable possibility in chemical decontamination for reactor coolant pump(RCP) was investigated for the various stainless steels. The stainless steel(STS) 304 showed the best electrochemical properties for corrosion current density and the lowest weight loss ratio in chemical decontamination process model 3-3 than other materials. The weightloss quantity in chemical decontamination process model 3-3 presents the lowest value compare to the other chemical decontamination process model 1, 2, 3-1 and 3-2. In the case of SEM observation, the pitting corrosion was generated in both STS 415 and STS 431 with the increasing numbers of cycle. The intergranular corrosion in STS 431 was sporadically observed. The sizes of their pitting corrosion were also increased with increasing cycle numbers.
Decontamination is one of the most important technologies for the decommissioning of NPP. The purpose of decontamination is to reduce the Risk of exposure of the decommissioning workers, and to recycle parts of the plant components. Currently, there is a lack of data on the efficiency of the decontamination technologies for decommissioning. In most cases, the local radiation level can be lowered below a regulatory limitation by decontamination. Therefore, more efficient decontamination technology must be continuously developed. This work describes the practical experiences in the United States and the European countries for NPP decommissioning using these decontamination technologies. When the decommissioning of domestic nuclear power plant is planned and implemented, this work will be helpful as a reference of previous cases.
국내 가동원전 중 2-루프 가압경수로인 고리1호기는 약 40년 운전한 후, 2017년 6월 18일 영구정지되었다. 영구정지된 고리 1호기는 주요 해체작업을 수행하기전에 계통내 선량률을 저감시켜 작업자피폭을 최소화하기 위한 계통제염을 수행할 예정이다. 일반적으로, 계통제염 범위는 원자로압력용기, 가압기, 증기발생기, 화학 및 체적제어계통, 잔열제거계통 및 원자로 냉각재계통 주요배관을 포함한다. 이러한 계통 및 기기 등을 효율적으로 제염하기 위해서는 제염과정에서 원자로냉각재계통내 유동특성을 평가할 필요가 있다. 계통제염을 위해 순환유량을 제공하는 방법은 다양하나, 본 논문에서는 잔열제거펌프 운전에 따른 고리1호기 원자로냉각재계통내 유동특성을 평가하였다. 잔열제거펌프를 이용한 계통제염은 원자로냉각재 내 유량의 불균형을 초래하여 계통내 기기 및 배관 등에 불순물을 침적시켜 제염이 효율적이지 않다는 것으로 평가되었다.
Objectives: Effectiveness and conditions of vapor-phase hydrogen peroxide (VPHP) system on decontamination of Geobacillus stearothermophilus(GS) spores, Escherichia coli (E.coli) and Enterobacteria phage felix01 (felix01) were determined. Methods: The VPHP system was designed to vaporize 35% (w/w) solution of hydrogen peroxide, continuously to inject and withdraw VPHP. The system and VHP 1000ED (Steris) were operated such that dehumidification and conditioning were initiated without samples in the chamber. Then the samples were loaded into and removed. Coupons (glass, anodizing, silicon, viton) with GS spores ($1{\times}10^6$ colony forming unit/mL [CFU/mL]), E.coli ($1{\times}10^7$ CFU/mL) and felix01 ($1{\times}10^7$ plaque forming unit/mL[PFU/mL]), and Biological Indicator (BI) with GS spores ($1{\times}10^6$ CFU/mL) on stainless steel coupons were used. The tested samples were sonicated and vortexed, and then were plated for enumeration, followed by incubation at $55^{\circ}C$, 24 hr for GS spores, and at $37^{\circ}C$, 24 hr for E.coli and felix01. BI analysis in broth culture was only qualitative. Results: The efficacy of the VPHP system on decontamination was almost equivalent to that of VHP 1000ED. The conditions for complete decontamination with the VPHP system was as follows: concentration; 700~450 ppm, relative humidity; approximately 55%, and temperature; $34{\sim}32^{\circ}C$. When comparing the decontamination efficiency among different kinds of coupons, glass was the most effective, however, all kinds of coupons were decontaminated completely after 60 min exposure in both systems. Conclusion: The VPHP system can be recommended as an alternative system for traditional system using ethylene oxide, formaldehyde or chlorine dioxide.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.