• Title/Summary/Keyword: System Risk Analysis

Search Result 2,524, Processing Time 0.031 seconds

Risk Analysis of Ammonia Leak in the Refrigeration Manufacturing Facilities (냉동제조 시설의 암모니아 누출사고 위험 분석)

  • Kang, Su-Jin;Lee, Ik-Mo;Moon, Jin-Young;Chon, Young-Woo
    • Journal of the Korean Institute of Gas
    • /
    • v.21 no.1
    • /
    • pp.43-51
    • /
    • 2017
  • Recently, ammonia leak occurred frequently in the domestic refrigeration manufacturing facilities. Ammonia caused great damage to the environment and human health in the event of an accident as combustible gases and toxic gases. After considering the types of ammonia accidents of domestic refrigeration manufacturing facilities and selected accident scenarios and to analyze the risk analysis through Impact range estimates and frequency analysis and there was a need to establish measures to minimize accident damage. In this study, depending on the method of analysis quantitative risk assessment we analyzed the risk of the receiver tank of ammonia system. Scenario analysis conditions were set according to the 'Technical guidelines for the selection of accident scenario' under the chemicals control act and 'Guidelines for chemical process quantitative risk analysis' of center for chemical process safety. The risk estimates were utilized for consequence analysis and frequency analysis by SAFETI program of DNV, event tree analysis methodology and part count methodology. The individual risk of ammonia system was derived as 7.71E-04 / yr, social risk were derived as 1.17E-03 / yr. The derived risk was confirmed to apply as low as reasonably practicable of the national fire protection association and through risk calculation, it can be used as a way to minimize accidents ammonia leakage accident damage.

A Risk Analysis Model Using VERT for R & D Project Management (R & D 프로젝트의 위험분석모형의 연구)

  • 황홍석
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.20 no.1
    • /
    • pp.85-99
    • /
    • 1995
  • Increasingly, risk analysis is becoming important ingredients in achieving the successful implementation and application in the area of the project management. The project management system is designed to manage or control the project resources on a given activity within time, cost and performance so called TPPM (Total Productive Project Management). In this research, a risk analysis model misproposed to identify potential problem areas, quantify the risks, and generated the chice of the action that can be taken to reduce the risk. In addition two analysis models are proposed : 1) risk factor model and 2) network simulation model using VERT (Venture Evaluation and Review Technique ). The objective of the remodels is to estimate the schedule, cost performance risks. These proposed quantitative models for project risk analysis are proving its value for the project managers who need to assess the risk of changes in cost, schedule, or performance. The proposed models will be used in the area of project selection, evaluation and the allocation of project resources.

  • PDF

Performance Analysis of Smart Automatic Jack-Up System Using the Pairwise Comparison Matrix Analysis Method (쌍대비교행렬 분석 기법을 적용한 스마트 자동 인상 시스템의 성능 분석)

  • Kim, Sung-Jo;Ji, Yongsoo;Kim, Bongsik;Han, Tong-Seok
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.35 no.1
    • /
    • pp.9-14
    • /
    • 2022
  • In this study, a smart jack-up system was developed to prevent safety accidents by performing risk analysis when a structure is lifted for maintenance. A quantitative risk analysis program that can analyze the risk using the pairwise comparison matrix analysis method was developed. The risk was analyzed in real-time for the lifting structure by connecting the program with an automatic jack-up system. Displacements were measured by the IR sensor among the components of the automatic jack-up system, and the displacements were provided to the quantitative risk analysis program. To confirm the performance of the smart automatic jack-up system, experiments were conducted on bridge and risk analysis was performed when a superstructure was lifted. A linear variable differential transformer (LVDT) was also installed on the bridge to verify the performance of the smart automatic jack-up system. The maximum displacements were measured using the devices, and the declinations were compared. The performance of the simultaneous operation of the jack-up device was verified by the analysis of variance (ANOVA).

Analysis of Risk Factors for Patient Safety Management (환자안전 관리를 위한 위험요인 분석)

  • Ahn, Sung-Hee
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.12 no.3
    • /
    • pp.373-384
    • /
    • 2006
  • Purpose: This is a pilot study to identify patient safety risk factors and strategies for patient safety management perceived by nurses. Methods: Data were collected and analyzed with an open questionnaire from April to May 2005, targeted on 100 nurses working in two hospitals. The issues were 'what are risk factors for patients, nurses, and other medical practitioners? How do they prevent with the aftermath of risk factors, causes of incidents?' For data analysis, types and frequency of risk factors were worked out, using the Australian Incident Monitoring System Taxonomy. Results: The types of patient safety risk factor perceived by nurses were as follows ; therapeutic devices or equipment, infrastructure and services (29.5%), nosocomial infections (16.3%), clinical processes or procedures (15.4%), behavior, human performance, violence, aggression, security and safety (12.2%), therapeutic agents (9.7%), injuries and pressure ulcers (8.7%), logistics, organization, documentation, and infrastructure technology (5.6%). Strategies for patient safety included training of prevention of infection, education about safety management for patients and medical professionals, establishment of reporting system, culture of care, pre-elimination of risk factors, cooperative system among employees, and sharing information. Conclusion: These results will be used to provide evidences for patient safety management and educational program.

  • PDF

The Application Method of System Safety Analysis Technique (시스템 안전 분석기법 활용방안에 대한 연구)

  • 김병석
    • Proceedings of the Safety Management and Science Conference
    • /
    • 1999.11a
    • /
    • pp.355-363
    • /
    • 1999
  • Free from the industrial accident is the goal from top manager to foreman. Therefore all the company try to prevent occupational accident using system safety program in order to increase productivity Korean industries have been tend to depending upon historical information to control risk. The other hand, foreign industries have been Identify risk factors using system safety techniques to predict future risk. Therefore, this study is presented to applying the foreign industries's risk control technique to korean industries.

  • PDF

Risk Assessment of Compressor Room for Next Generation LNG Carriers (차세대 LNG선 컴프레서룸의 위험성 해석)

  • Moon, Ki-Ho;Song, Seok-Lyong;Jeong, Sam-Heon;Ha, Jong-Phil
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2008.09a
    • /
    • pp.76-83
    • /
    • 2008
  • New and more efficient propulsion systems are required for LNG carriers. One of the proposed systems is a combination of a gas turbine with a heat recovery steam generator. This system constitutes a novel approach, which needs to be analyzed by system analysis and risk assessment to compensate for the lack of field experience. Of specific concern is the high pressure fuel supply system. This paper describes the dispersion and fire analysis performed to identify for safety and design improvement of proposed system.

  • PDF

Application of risk evaluation and safety management system in urban deep tunnelling (도심지 대심도 터널에서의 리스크 평가 및 안전관리시스템 적용)

  • Moon, Joon-Shik;Jeon, Kichan;Kim, Younggeun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.725-744
    • /
    • 2022
  • As the construction of infrastructure using the underground tunnel in urban area have been rapidly increased, various accidents and collapses of tunnel including structure have been occurred in deep urban tunnelling. The concern and worry relating to the risk and safety of the tunnel during excavation is becoming the key issues in deep urban tunnelling. In this study, it was conducted for deep urban tunnel at GTX (Great Train Express) line which was located in Seoul metropolitan area to determine the risk characteristics for tunnel according to urban tunnelling. Also, it was reviewed the risk analysis and evaluation of the tunnel, shaft and station. And after a review of risk analysis and evaluation for risk register and hazard identification by using a risk matrix method, safety management of the tunnel according to excavation was evaluated to be secured. This study is expected to be applied as useful approach in deep urban tunnelling if you need to review the risk and safety management system of tunnel according to mitigation measures in complex urban tunnelling.

Analysis of Installation Status and Application of GIS for Preliminary Risk Assessment of Underground Storage Tanks in Chuncheon City (춘천시의 지하 저장 탱크의 예비적 위해성 평가를 위한 설치 현황 분석 및 지리정보시스템의 적용)

  • Kim, Joon-Hyun;Han, Young-Han;Lee, Jong-Chun;Kwon, Young-Sung;Lee, Kwang-Yeon
    • Journal of Industrial Technology
    • /
    • v.22 no.A
    • /
    • pp.127-135
    • /
    • 2002
  • In this study, the preliminary risk assessment for the underground storage tanks(UST) in Chunchon city was implemented using the geographical information system(GIS). The estimation variables, such as the installation year, storage capacity, the distances from streams, and from groundwater pumping wells, were selected to estimate the relative risk levels. The weighting factors were given to all the estimation variables. Cumulative scores were induced by the combination of all the scores of the corresponding variables using the buffering technique and the overlay analysis in ArcView. Using the these process, the relative risk level of each UST was estimated. Some sites in this study are simplified and reduced because the number of useable data are limited or too enormous. Thus the selection of the comprehensive estimation variables and the proper weighting values are required for the future study. The methodology in this study could be served not only for the preliminary risk assessment of UST but also for the selection of the proper location of new and old UST. And, it can be used for the effective management system of UST.

  • PDF

Risk Analysis Based on Accident-Category for Railway Work Zones (철도건설현장의 사고유형기반 위험도 분석)

  • Park, Mi-Yun;Choi, Eun-Soo;Park, Joo-Nam;Choi, Seung-Sun
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.2
    • /
    • pp.260-266
    • /
    • 2009
  • The theory of risk is applied frequently in analysis of railway accidents. The aim of risk analysis is to search potential causes and contribution factors of accidents by checking the total system of construction field. This paper analyze a pattern and a cause of accident occupied in construction field, calculate risk index considering accident frequency and severity, and then provide the relative risk assessment. Based on this, this paper will provide the methodology of qualitative risk assessment guiding to reach a consistency of risk index with risk assessment.

The Study of Risk Matrix Development for Urban Metro EMU (도시철도차량 적용을 위한 위험도 매트릭스 개발에 관한 연구)

  • Kim, Young-Sang
    • Journal of the Korean Society of Safety
    • /
    • v.26 no.6
    • /
    • pp.111-117
    • /
    • 2011
  • Risk-based railway safety management has been mandatory in Korea as by relevant laws and regulations enacted since the Railway Safety Act 2004. In particular, the Railway Vehicle Safety Guidance came into effect on Jan 1, 2008 specifies the details of methodology for hazard analysis, risk assessment and safety verification and validation. Fundamentals for success of the risk-based safety management are systematic hazard identification and risk assessment by use of reasonable risk assessment criteria, but the principle of risk-based safety management has not been applied in an effective way to introduction and maintenance of railway vehicle systems because definite risk assessment criteria have not been set down for each railway system or railway network. The purpose of this study is to suggest a risk matrix development principle for risk assessment of domestic urban metro vehicles by analyses of relevant rules and railway operating environment of Korea.