• Title/Summary/Keyword: Symmetrical structure

Search Result 211, Processing Time 0.024 seconds

Static performance of a new GFRP-metal string truss bridge subjected to unsymmetrical loads

  • Zhang, Dongdong;Yuan, Jiaxin;Zhao, Qilin;Li, Feng;Gao, Yifeng;Zhu, Ruijie;Zhao, Zhiqin
    • Steel and Composite Structures
    • /
    • v.35 no.5
    • /
    • pp.641-657
    • /
    • 2020
  • A unique lightweight string truss deployable bridge assembled by thin-walled fiber reinforced polymer (FRP) and metal profiles was designed for emergency applications. As a new structure, investigations into the static structural performance under the serviceability limit state are desired for examining the structural integrity of the developed bridge when subjected to unsymmetrical loadings characterized by combined torsion and bending. In this study, a full-scale experimental inspection was conducted on a fabricated bridge, and the combined flexural-torsional behavior was examined in terms of displacement and strains. The experimental structure showed favorable strength and rigidity performances to function as deployable bridge under unsymmetrical loading conditions and should be designed in accordance with the stiffness criterion, the same as that under symmetrical loads. In addition, a finite element model (FEM) with a simple modeling process, which considered the multi segments of the FRP members and realistic nodal stiffness of the complex unique hybrid nodal joints, was constructed and compared against experiments, demonstrating good agreement. A FEM-based numerical analysis was thereafter performed to explore the effect of the change in elastic modulus of different FRP elements on the static deformation of the bridge. The results confirmed that the change in elastic modulus of different types of FRP element members caused remarkable differences on the bending and torsional stiffness of the hybrid bridge. The global stiffness of such a unique bridge can be significantly enhanced by redesigning the critical lower string pull bars using designable FRP profiles with high elastic modulus.

Design and Analysis of 3D Isotropic Metamaterial Bulk Structure Using Thin Wire and SRR (Thin Wire와 SRR을 이용한 3D 등방성 Metamaterial Bulk 구조 설계 및 분석)

  • Kim, Chung-Ju;Lee, Bom-Son
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.22 no.9
    • /
    • pp.919-925
    • /
    • 2011
  • In this paper, we designed and analyzed a 3D isotropic bulk structure consisting of thin wires and SRR's(Split Ring Resonator) with which the permittivity and permeability can be controlled at the same time. For the 3D isotropic bulk structure, first of all, the geometry seen by three main axes must look alike. Thus, we adopted the orthogonal thin wires and symmetrical SRR's. As a result, we constructed metamaterial bulk structures of which effective relative permittivity and permiability are about -0.6 and -1.5, respectively. Its refractive index is about -0.95 in each direction(x, y and z direction). The computed Brillouin dispersion diagram also showed that the proposed structure is almost near isotropic.

Aerodynamic flutter analysis of a new suspension bridge with double main spans

  • Zhang, W.M.;Ge, Y.J.;Levitan, M.L.
    • Wind and Structures
    • /
    • v.14 no.3
    • /
    • pp.187-208
    • /
    • 2011
  • Based on the ANSYS, an approach of full-mode aerodynamic flutter analysis for long-span suspension bridges has been presented in this paper, in which the nonlinearities of structure, aerostatic and aerodynamic force due to the deformation under the static wind loading are fully considered. Aerostatic analysis is conducted to predict the equilibrium position of a bridge structure in the beginning, and then flutter analysis of such a deformed bridge structure is performed. A corresponding computer program is developed and used to predict the critical flutter wind velocity and the corresponding flutter frequency of a long-span suspension bridge with double main span. A time-domain analysis of the bridge is also carried out to verify the frequency-domain computational results and the effectiveness of the approach proposed in this paper. Then, the nonlinear effects on aerodynamic behaviors due to aerostatic action are discussed in detail. Finally, the results are compared with those of traditional suspension bridges with single main span. The results show that the aerostatic action has an important influence on the flutter stability of long-span suspension bridges. As for a suspension bridge with double main spans, the flutter mode is the first anti-symmetrical torsional vibration mode, which is also the first torsional vibration mode in natural mode list. Furthermore, a double main-span suspension bridge is better in structural dynamic and aerodynamic performances than a corresponding single main-span structure with the same bridging capacity.

Construction Stage Analysis of Structure Settlement Using Underpinning (언더피닝 공법을 이용한 구조물 침하에 대한 시공 단계 해석)

  • Lee, Jonghyop;Heo, Seungjin;Ok, Suyeol;Lim, Yunmook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.3A
    • /
    • pp.131-138
    • /
    • 2012
  • This paper aims to present accurately analytical modeling method for underpinning using uncertainty reduction, obtained from comparison between numerical analysis and Site measuring data during construction and service stages. Combination of various conditions should be considered for using numerical analysis to predict the behavior of the structure accurately, even though complexly considered the conditions, real construction should be secured the stability by applying the actual instrument measurement data because predicted results are including the considerable uncertainty. In order to secure the stability during construction, the real time instrument measurements together with numerical analysis results performed before construction state are complementary used actively. From the results of this study, the significant settlements are occurred not only in underpass structure of adjacent excavation area but also in the permanent steel pipe structures were analyzed. From the site measurement results of underpass settlement, the settlements are occurred in every stages of excavation, furthermore observed tendency is asymmetrical excavation patterns are settled more than symmetrical excavation patterns. The essential consideration points for numerical analysis are construction sequence, the direction of the existing facilities, the methods of elements modeling, the applied factors for nature of material and different results would be occurred depending upon inputting the above factors.

Realization of High Impedance Surface Characteristics Using a Periodically Transformed Artificial Magnetic Conductor Structure and Reduction Technique of Specific Absorption Rate

  • Lee, Seungwoo;Rhee, Seung-Yeop;Kim, Pan-Yeol;Kim, Nam
    • Journal of electromagnetic engineering and science
    • /
    • v.13 no.2
    • /
    • pp.113-119
    • /
    • 2013
  • We developed a transformed, symmetrical, mushroom-like surface without via holes in cells focused on a 2.4-GHz WLAN band. Each slot in the novel type structure plays a key role in modeling at the desired frequencies. The designed artificial magnetic conductor (AMC) has several advantages, including a small size, a wider bandwidth, a short reflecting distance to the antenna, and easy fabrication because there are no via holes. Overall dimensions of the AMC cell are 21 mm $(Width){\times}21mm$ $(Height){\times}2.6mm$ (Thickness), and the bandwidth is about three times wider (11.7%) compared to that of a conventional AMC (4.0%). For evaluating the performance of the proposed structure, a reflector, which periodically consists of the designed AMC cells, was developed. The antenna with the investigated AMC reflector not only works within a quarter of the wavelength because of the extremely high wave impedance generated by the AMC cells on the surface of the structure but also reduces the specific absorption rate (SAR). Electromagnetic field (EMF) exposure to a human phantom was analyzed by applying the designed reflector to the 2.4-GHz dipole antenna in a tablet PC. The calculated peak SAR averaged over 1 g was 0.125 W/kg when the input power was 1 W and the antenna was located at 20 cm from the human phantom. However, the SAR value was only 0.002 W/kg (i.e., 98.4% blocked) when the designed reflector was inserted in front of the antenna.

Design of Aspheric Imaging Optical System having 24mm Focal Length for MWIR with Facing Symmetric Lenses (마주보는 대칭렌즈를 가지는 MWIR용 초점거리 24mm의 비구면 결상광학계 설계)

  • Lee, Sang-Kil;Kim, Boo-Tae;Lee, Dong-Hee
    • Journal of the Korea Convergence Society
    • /
    • v.9 no.9
    • /
    • pp.183-189
    • /
    • 2018
  • This study deals with the design and development of imaging optics having 24mm focal length for MWIR ($3{\sim}5{\mu}m$) with two symmetrical lenses facing each other. We used CodeV in our optical design, and we performed the optimization process to have the resolution and angle of view satisfying the user's requirements. The materials of lenses were limited to two types, including KCIR035 with a refractive index of 1.7589, developed in Korea. The optical system designed in this way consists of two aspherical lenses made of KCIR035 material having the same shape and one spherical lens made of Si. Here, the arrangement of the two aspherical lenses is characterized by having a symmetrical structure facing each other. And this optical system has a resolution of MTF value of 0.35 or more at a line width of 20 lp / mm. Therefore, it is considered that this optical system has the capability to be applied to a thermal imaging camera using a $206{\times}156$ array MWIR detection device having a pixel size of $25{\mu}m$.

Optimization of the construction scheme of the cable-strut tensile structure based on error sensitivity analysis

  • Chen, Lian-meng;Hu, Dong;Deng, Hua;Cui, Yu-hong;Zhou, Yi-yi
    • Steel and Composite Structures
    • /
    • v.21 no.5
    • /
    • pp.1031-1043
    • /
    • 2016
  • Optimization of the construction scheme of the cable-strut tensile structure based on error sensitivity analysis is studied in this paper. First, the element length was extracted as a fundamental variable, and the relationship between element length change and element internal force was established. By setting all pre-stresses in active cables to zero, the equation between the pre-stress deviation in the passive cables and the element length error was obtained to analyze and evaluate the error effects under different construction schemes. Afterwards, based on the probability statistics theory, the mathematical model of element length error is set up. The statistical features of the pre-stress deviation were achieved. Finally, a cable-strut tensile structure model with a diameter of 5.0 m was fabricated. The element length errors are simulated by adjusting the element length, and each member in one symmetrical unit was elongated by 3 mm to explore the error sensitivity of each type of element. The numerical analysis of error sensitivity was also carried out by the FEA model in ANSYS software, where the element length change was simulated by implementing appropriate temperature changes. The theoretical analysis and experimental results both indicated that different elements had different error sensitivities. Likewise, different construction schemes had different construction precisions, and the optimal construction scheme should be chosen for the real construction projects to achieve lower error effects, lower cost and greater convenience.

The Crystal Structure of Fluoxymesterone, $C_{20}H_{29}FO_3$ (Fluoxymesterone, $C_{20}H_{29}FO_3$의 결정구조)

  • Kim, Ui-Seong;Park, Gwon-Il;Jo, Seong-Il
    • Korean Journal of Crystallography
    • /
    • v.4 no.1
    • /
    • pp.6-10
    • /
    • 1993
  • 11 β ,17 β -dihydroxy-9a-fluoro-l7a-methyl androst-4-en-3-one (Fluoxymesterone), CgoH29 FO,, orthorhombic, P2,2,2,, a=13.468(5) A, b= 19.554 (2)A, c=6.578(9)A, a=b=r=90˚, A (CuKa)=1.5406 A , Dm=1.289cm-3, Dc=1.299cm-3 and Z=4 at T=298k. The structure was solved by direct method using seminvariants of ggg Parity group and refined by the full-matrix least-square method, resulting model with reliability factor R=0.069 for 1098 unique reflection over 3σ . Ring A is an 1β-2a-half chair, 5 ring has a highly symmetrical chair conformation, C ring is in a distorted chair conformation and D ring is a 13aenveLope conformation. In the crystal structure, the molecules are packed with a hydrogen bond of 011-H23‥‥03(0.5+x, 1.5-y, 1.0-z) [1.94(9) A of H‥‥0.2.786(9)A of 0‥‥0 and 165(8) ˚ of

  • PDF

Landscape Design of KangWon Provincial Police Agency (강원도 지방경찰청 조경설계)

  • 이시영;김신원
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.30 no.2
    • /
    • pp.79-87
    • /
    • 2002
  • This landscape design proposal was presented to a design competition for the KangWon Province Police Agency(KPA). The site, about 27,711 $m^2$, is located at 293-4 Udu-dong, Chunchun, KangWon-Do. Design objectives of the KPA were to build a symbolic place which fall community members with pride, to elevate an identity and status of the KPA by creating a landscape correspondent to the concept of the building design, to provide community residents with a space to enjoy cultural and social activities, and to make environment friendly space. The main concept was developed by one of characteristics of the traditional spatial structure of Korea known as an, 'Open and Closed spatial structure.'By re-interpreting the traditional spatial structure and applying it to the site, the design met the various desires of the KPA. The site is primarily segmented into 6 sub spaces; entrance space Podori plaza, symbolic court, police billeting area, sports area, and rear rest area. The entrance space, Podori plaza, and symbolic court on the south-west part of the site represent the publicity of the site as the concept of ″open space.″ On the contrary, considering the specialty of police affairs, the north-east part of the site, which contains the police billeting area and rest area, were designed to maintain security by using the concept of ″closed space.″ To express an identity of the KPA, 'Podori', a police mascot, the plaza was designed and is suppose to function as the hub of the community. In the front section of the plaza, a symmetrical planting pattern, centering the strong axis, was introduced to strengthen its symbolic meaning. Traditional window frames such as the pattern of 'Pisal-jige'and 'Umulsal-jige' were used for the paving system which is applied as the environment friendly design. Site facilities and furnitrue were placed at every important spot in order to connect various spaces organically. As these well-tied spaces properly shared their function, spatial sequence and management would be promoted. The entire space was designed to allow free access of handicapped people. This proposal is meant to create a new image of KangWon province and to enhance the way of inhabitants' think about their community.

Studies on the Analysis of Stand Structure Korean Red Pine (Pinus densiflora) (소나무림(林)의 임분구조(林分構造) 해석(解析)에 관(關)한 연구(硏究))

  • Yun, Jong Wha;Kim, Ju Cheon
    • Journal of Korean Society of Forest Science
    • /
    • v.83 no.2
    • /
    • pp.254-261
    • /
    • 1994
  • This study was conducted to investigate and interpret the stand structure of Korean Red pine (Pinus densiflora) stands in Kangwon province, so as to provide basics information for effective forest management. The results obtained in this study were as follows : 1. Number of trees distribution for each diameter class have left nonsymmetrical in Gosung districts, but symmetrical distribution in Pyungchang districts. 2. Height curve for D.B.H. Distribution becames liner shape in Pyungchang districts that more higher than Gosung districts. 3. Stand volume and number of trees per ha in Pyungchang districts are higher than Gosung districts. 4. D.B.H. growth increments during recent 5 years at large D.B.H. class has much lager than low D.B.H. class. 5. Total growth increments of D.B.H., height and volume in Pyungchang districts are or the higher than Gosung districts overtimes 15 years later.

  • PDF