This paper presents a novel application of LCC resonant converter for 60kW EV fast charger and describes development of the high efficiency 60kW EV fast charger. The proposed converter has the advantage of improving the system efficiency especially at the rated load condition because it can reduce the conduction loss by improving the resonance current shape as well as the switching loss by increasing lossless snubber capacitance. Additionally, the simple gate driver circuit suitable for proposed topology is designed. Distinctive features of the proposed converter were analyzed depending on the operation modes and detail design procedure of the 10kW EV fast charger converter module using proposed converter topology were described. The proposed converter and the gate driver were identified through PSpice simulation. The 60kW EV fast charger which generates output voltage ranges from 50V to 500V and maximum 150A of output currents using six parallel operated 10kW converter modules were designed and implemented. Using 60kW fast charger, the charging experiments for three types of high-capacity batteries were performed which have a different charging voltage and current. From the simulation and experimental results, it is verified that the proposed converter topology can be effectively used as main converter topology for EV fast charger.
High-power electromagnetic transmitter power supplies are an important part of deep geophysical exploration equipment. This is especially true in complex environments, where the ability to produce a highly accurate and stable output and safety through redundancy have become the key issues in the design of high-power electromagnetic transmitter power supplies. To solve these issues, a high-frequency switching power cascade based emission power supply is designed. By combining the circuit averaged model and the equivalent controlled source method, a modular mathematical model is established with the on-state loss and transformer induction loss being taken into account. A triple-loop control including an inner current loop, an outer voltage loop and a load current forward feedback, and a digitalized voltage/current sharing control method are proposed for the realization of the rapid, stable and highly accurate output of the system. By using a new algorithm referred to as GAPSO, which integrates a genetic algorithm and a particle swarm algorithm, the parameters of the controller are tuned. A multi-module cascade helps to achieve system redundancy. A simulation analysis of the open-loop system proves the accuracy of the established system and provides a better reflection of the characteristics of the power supply. A parameter tuning simulation proves the effectiveness of the GAPSO algorithm. A closed-loop simulation of the system and field geological exploration experiments demonstrate the effectiveness of the control method. This ensures both the system's excellent stability and the output's accuracy. It also ensures the accuracy of the established mathematical model as well as its ability to meet the requirements of practical field deep exploration.
Smart phones become popular all over the world recently. At the same time, demand of various additional services, such as SNS by utilizing low-cost reliable Wi-Fi network and position information, is expected to keep growing. In this paper, Implementation of SNS based on an Open Wi-Fi & Position Information was proposed. This service is achieved by constructing an Open Wi-Fi network based on a built AP access information database. And in order to provide durable connection in mobile environment, RSS detect AP switching module and mobile IP are utilized in the proposed service. Furthermore, with the utilization of GPS information of AP, AP providers could delivery various information such as advertisements, promotion events. In addition, it is possible for AP users to communicate with each other, thus a position information based SNS was also proposed in this paper.
Journal of the Institute of Electronics Engineers of Korea TC
/
v.44
no.12
/
pp.63-72
/
2007
This paper addresses the system development that can transfer data and TDM signals simultaneously by adding TDM pseudowires functions to E-PON system. E-PON technology is one of many technologies which can realize FTTH, has raised as next generation access network solution having both low-cost Ethernet technology and optical infrastructure. TDM pseudowires service is the new voice/data conversion technology which can transfer the existing TDM circuit switched voice and data over packet switching network. In this paper, this system can provide both data and TDM service without deteriorating QoS by adding TDM pseudowires service module to E-PON, and then implementing QoS control function. Therefore, the competitive system which can transfer both data and TDM signal, can be installed.
The Journal of Korean Institute of Electromagnetic Engineering and Science
/
v.27
no.10
/
pp.926-934
/
2016
In this paper, we designed a compact frequency synthesizer with multi-function for Ka-band seeker. DDS(Direct Digital Synthesizer) is applied to generate various waveform and to cover high-speed frequency sweep. In order to reduce size, waveform generator and frequency up-converter are integrated in one module. Proposed frequency synthesizer provides precise detection and tracking waveform for low and high speed targets. It is observed that fabricated synthesizer performs $0.45{\mu}sec$ frequency switching time and -93.69 dBc/Hz phase noise at offset 1 kHz. The size of the synthesizer is kept within 120 mm width, 120 mm length and 22 mm height.
The Journal of the Korea institute of electronic communication sciences
/
v.6
no.3
/
pp.397-404
/
2011
In this research, wish to suggest method to embody system that can accommodate defect of PLC and find actual propriety. Defect permission control system minimizes production damage because enables repair and checking without discontinuance and improve believability about whole system. Propose duplexing of system to embody this fault tolerant system. Therefore, composed control system that can permit defect or breakdown duplexings of various module proposing this system, and confirms to simulation and actuality kiln of defect permission control system through an application experiment, and compares for mean time between defect by estimate and defect special quality and system configuration of failure(failure) to improve believability of PLC control system together. In proposed system expression method and system mode and relation with operation mode, error discovery mode and switching tube of duplexing mode, and PLC's central processing unit of node study algorithm about master-standby conversion driving and continuous operation of 2 channels method that have 2 that is not one and deduced continuous operation method and result about defect permission in this algorithm and applies this result to actuality kiln control system and confirms continuous operation about PLC defect permission.
Kim, Doo-Hyun;Kim, Sung-Chul;Eom, Haneol;Kang, Moon-Soo;Jeong, Cheon-Kee
Journal of the Korean Society of Safety
/
v.36
no.4
/
pp.12-19
/
2021
This paper presents a safety assessment method for FTA-based induction heating systems; the failures and causes of electrical fire are first analyzed for each part and module qualitatively, and methods to manage high probabilities of failure and electrical fire are considered, thereby improving the reliability of the induction heating system. The cumulative importance value (ACC) of the minimal cut set is drawn by setting failure as the top event, and STACK and SMPS are observed to account for about 70% of the induction heating system failures. Thus, intensively managing the basic events contained in the minimal cut set of failures for STACK and SMPS is expected to provide effective and stable operation of the induction heating system. When electrical fire is set as the top event, the STACK percentage is 90%. Accordingly, the current IGBT is changed to a FET to increase the applied voltage and prevent induction heating system failure, and a heat sink plane is installed to prevent FET heating caused by switching, thereby preventing an electrical fire. By classifying the parts and modules of the induction heating system in detail and by applying FTA based on actual failure rates and relevant data, more practical and reasonable results may be expected. Hence, continuous research must be conducted to ensure safety when using induction heating systems.
The Journal of The Korea Institute of Intelligent Transport Systems
/
v.21
no.5
/
pp.162-170
/
2022
In this paper, the phased-array transceiver (TRX) channel amplitude and phase calibration method for a radar wind profiler (RWP) based on the 256 active phased array is discussed. Without the additional module, the TX and RX calibration paths were secured using couplers and switches in the TRX front ends and the TRX switching duplexers, and the amplitude and phase of the 256 TRX were calibrated using a gain and phase detector. The beam widths and side lobes of five beams (vertical, east, west, south, and north) of the calibrated 256 active phased array antenna were confirmed by a near-field which agreed well with the simulation results. The proposed calibration method can be easily applied to a system based on an active phased array operated in an outdoor environment.
Smart transformers are effective at reducing the weight and increasing the efficiency of traction systems for railroad applications. A smart transformer generally consists of rectifier modules and the Dual-Active-Bridge (DAB) converter modules. The efficiency of the smart transformer depends on not only the electrical characteristics, but also on the control method of the converter modules. Especially, a DAB converter has a high order degree of freedom of voltage modulation to control the power transferred through the high frequency transformer, and a voltage modulation method, are very critical for the efficiency of the DAB converter. This paper proposes a new voltage modulation method for the DAB converter to increase the efficiency in the low/medium power transfer condition. The proposed modulation method controls the reactive power in the high frequency transformer, making it zero. And, the switching loss is dramatically reduced by using the received converter module as a diode rectifier. The feasibility of the proposed modulation method is verified by computer simulation of the 900Vdc DAB converter power control.
Kim, Byung-Mok;Lee, Hu-Dong;Tae, Dong-Hyun;Rho, Dae-Seok
Journal of the Korea Academia-Industrial cooperation Society
/
v.21
no.8
/
pp.9-17
/
2020
Recently, RES (renewable energy source) projects have been spreading all over the world as an alternative to solve the shortage of energy and environmental problems caused by fossil fuel consumption. The Korean government also supported the policy and demonstration project to increase the proportion of renewable energy to 63.8[GW] until 2030, which is 20[%] of the total power generation. On the other hand, output loss of a PV array can occur when the surrounding high-rise buildings and trees shade a PV array. Therefore, this paper proposes an algorithm to improve the output loss of a PV array, which electrically changes a circuit configuration of PV modules by wiring and switching devices. Furthermore, this study modeled a PV system based on PSIM S/W, which was composed of a PV array, a circuit configuration device, and a grid-connected inverter. From the simulations results with the modeling and test device, the existing method showed no output when 50% of the shade occurs in PV modules. In contrast, the proposed method could produce the output because the voltage in the PV module could be restored to 246[V], and the operation efficiency of the PV system could be improved by the operation algorithm of the circuit configuration device.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.