Journal of Korean Society of Industrial and Systems Engineering
/
v.46
no.spc
/
pp.79-88
/
2023
This research aims to validate the effectiveness of the "Specialized Entrepreneurship University Program," which was conducted as part of government entrepreneurship support initiatives from 2018 to 2022. Based on previous studies, a research model was derived consisting of three laboratory entrepreneurship support factors that influence program satisfaction and entrepreneurial outcomes (infrastructure support, educational mentoring support, and business linkage support). Surveys were collected and analyzed from 126 laboratory entrepreneurship firms participating in the program, and empirical analysis of the research model was conducted using SPSS 23.0 statistical software. The analysis results indicated that the three variables, namely infrastructure support, educational mentoring support, and business linkage support, were significant factors affecting program satisfaction, and program satisfaction was confirmed to influence entrepreneurial outcomes. Furthermore, it was found that the three business operation factors indirectly influenced entrepreneurial outcomes by partially mediating program satisfaction. This study is considered significant as an empirical study for the initial stage of the second-phase program enhancement, verifying the effectiveness of laboratory entrepreneurship support factors. The findings can be applied to similar government entrepreneurship support initiatives and contribute to the effective strategy and planning of stakeholders involved. The limitations of this study include the need for further research on the perception of the extent to which it contributes to entrepreneurial outcomes, emphasizing caution in interpreting the research model, and the necessity for expanding the survey population and improving survey items in future research.
Purpose: Most of the currently used concepts and measurements of social support have been relevant for general population. The main purpose of this study is to conduct the concept analysis of perceived social support(PSS) of family caregivers for people with dementia. Methods: This study adopted the Walker and Avant concept analysis methodology. Results: Findings from this concept analysis suggested four defining attributes of PSS of family caregivers for people with dementia: 1) PSS is help or assistance that family caregivers perceive as available when needed; 2) PSS is offered through socio-ecological structure; 3) PSS has a specific function to meet the needs of family caregivers; and 4) PSS includes quality aspects where family caregivers choose, use, or evaluate it. Borrowing from the socio-ecological model, this study proposed the structural aspects of PSS. This study also identified functional aspects of PSS, such as emotional support, informational support, appraisal support, and practical support. Finally, this study assessed quality aspects of PSS, such as satisfaction, timeliness, usefulness, accessibility, and coordination. Conclusion: Focusing on family caregivers for people with dementia, we proposed a new model of PSS. The present study helped refine and clarify the concept of PSS of family caregivers for people with dementia. The results of this study may also contribute to promoting the development of more effective instruments for the concept.
Proceedings of the Korean Institute of Building Construction Conference
/
2009.05b
/
pp.131-135
/
2009
Domestic construction industry is facing big difficulties by a worldwide financial crisis. Especially the deterioration of liquidity by the reject of banks for project financing and unsold housing project made a big problem on financing for the ongoing and new projects. To solve this, it is critical for construction companies. banking facilities and public organizations to cooperate and support each other. In this study, the methods which each part can do are investigated. Construction companies can do a price reduction, finance condition improvement for deposit and down payment, asset sale and cost reduction. And Public organizations can buy the assets of construction companies with proper price and ease the regulation to activate transactions of real estate. In the case of Banking facilities, they can support arrangement and liquidation of insolvent projects and so on.
This research began by recognizing the development of telecommunication skill in a short period of time as one achievement of launching the national research and development (R&D) project for the diversification of telephone service and for the solution of telephone holdup rate. Under this concern, this research is focusing on searching the influential elements on successful outcome by analyzing the case of Time Division Exchange R&D Project carried out by Korea. Those variables for analyzing the case is limited to 7 definite variables, which are "willingness of policy making organization", "participation of manufacturers and buyers", "support from research and development group", "economy of operating methods and selection of machinery", "rate of technology transfer", "support from Fixer", and "quality management". Summarizing the result of analysis, in order to bring about technological innovation, knowledge creation activity leading to upward efficiency through competition and cooperation making a harmony should be done in one mechanism. I.e., launching an innovative policy should be done in an arena of competition and cooperation, where stability of implementing system is achieved, the entity of "Fixer" is an adequate operator, and competition and cooperation is efficiently managed, among where agreement on purpose and professional opinions are reflected.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.25-28
/
2006
Muan Enterprise City is a mega-project that has an investment worth up to $3 billion only in the construction of infrastructure. The project's success will largely depend on the success of its construction management. This study sets out to establish a construction management plan for Muan Enterprise City by defining the core objectives and organizational structure and its supporting system. Project outline and core objectives were analyzed, and necessity of construction management and processes evaluated. Based on this analysis, implementation strategy for the achievement of project goals was defined and developed, and organizational structure and its support system to execute established. This study strives to support the project's construction management being carried out under proper planning and possibly set an example for construct ion management of mega-structures in the future. Muan Enterprise City Project.
Since the advent of Six Sigma in 1980's, Six Sigma is widely used in various industry areas, such as manufacturing, financial, government, and service, and proves its innovation ability and value by providing lots of success stories. Several researches have been conducted to adopt Six Sigma for Software Development and Software Quality Assurance-Software Six Sigma. Although the wide use of Six Sigma, there is no software tool to support the execution of Six Sigma Project. For this reason, the Quantitative Six Sigma Project Management is required to support for measuring and analyzing Six Sigma Projects, storing and reporting the results from Six Sigma Projects, and managing Six Sigma Projects through the whole process of, DMAIC or DMADV. In this paper, we introduce the design and implementation of a Quantitative Six Sigma Project Management Framework and Tool. The execution of Six Sigma Project based on Six Sigma Project Management Tool benefits the quantification, the systematization, and the integration.
Journal of The Korean Society of Agricultural Engineers
/
v.61
no.5
/
pp.49-55
/
2019
This study attempted to investigate the changes in the perception of local government officials about agricultural infrastructure improvement projects due to the financial policy changes. A total of 141 local government officials were surveyed on the priority, the current status of the agricultural infrastructure improvement projects. Irrigation facilities renovation project and Small drainage improvement project had generally high priority, while Support project of cultivation basis for upland crops in paddy, Large scale land readjustment project, and Upland infrastructure improvement project had low priorities. After the introduction of the block grant system, agricultural infrastructure improvement projects had often been conducted by collecting opinions from local residents. The officials in charge of local governments recognized that the agricultural infrastructure improvement projects were reduced due to lack of financial resources and project potential sites. In response to the changes in the agricultural infrastructure improvement projects, most of the surveys showed that the influence of cities and provinces was strengthened. In addition, respondents most needed to improve the subsidy rate and there were a large number of cases requiring differential support to meet the characteristics of the local government. Therefore, it will be necessary to present a new perspective on the agricultural infrastructure improvement projects and to suggest differentiated projects for each regions.
Journal of Construction Engineering and Project Management
/
v.7
no.3
/
pp.1-14
/
2017
Delay claim should actually be supported by a set of proper information so that the contractors could prove their validity. The so-called information should be able to clarify the relationship between delay events and how they impact on the whole project. Therefore, exploiting an integrated system by people who are involved in construction business would certainly prove helpful. In the present study, delay analysis methods have been investigated along with selecting a relatively comprehensive method which has been modified, and eventually, a novel model and its required modules have been proposed for evaluating delay claims. The suggested integrated model is formed to identify delayed events, to classify delays, to measure the impacts of delays on the project scheduling, and finally to estimate the damages which were caused by those so-called delays. A decision support system (DSS) model which is related to the integrated system is actually extracted from Iran's general contract conditions, that is, 4311 magazine (equivalent to red FIDIC book). It is then programmed and coded by C# program. This DSS model can be used as an input of Easy Plan program. In addition, at the end of this research, the coded DSS has been used along with the so-called program so that a modified and developed model could be generated.
Nowadays, because IT market expansion and complexity has been progressing and competition has intensified, there is a growth of information system building industries having difficulty through traditional business management methods. A survey was conducted among site personnel (Project Manager PM and Project Participants) to generate an institutional framework to efficiently manage this and project management process support. Through this, the importance of element technology and fragility of software development project management must be understood and an improvement of the element technology must be generated. By using this, a very relevant result that presented a logical basis was obtained in the decision making of the importance of project management and the role of overall project manager and core project management fields.
This study aims to review the differences in urban regeneration independently implemented by the government (Ministry of Land, Infrastructure, and Transport, MOLIT) and Seoul based on related laws and ordinances, and to draw out the implications of Korean urban regeneration's directions. The results are as follows. First, Seoul has constantly responded to the revision of the Urban Regeneration Act by adjusting and specifying the contents of ordinances, and especially, there have been efforts to enhance regional characteristics suitably for the circumstances of Seoul. Second, in the urban regeneration of Seoul, the budgets including the matching ratio of national and local subsidies shall be changed according to the standards of the MOLIT in changing designating places after the selection of the urban regeneration by the ministry, and this procedure and these implementation methods cause confusion to Seoul and local governments. Third, there were differences in the results of comparing the budgets and support methods of the "Gaggum Housing Project" of Seoul and "New Deal Housing Repair Project" of the MOLIT, which caused conflicts due to the differences in the project implementation and support standards, and the arbitrary interpretation of the guidelines. Although the urban regeneration greatly contributed to the revelation and conservation of regional characteristics, it might be necessary to establish systems that can enhance citizens' awareness and compensate the efficient contents needed for each region in the future.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.