• Title/Summary/Keyword: Supply condition

Search Result 1,496, Processing Time 0.038 seconds

Analysis of Oil Supply Characteristics for Reciprocating Compressor (왕복동 압축기 오일 급유 특성 분석)

  • Lee, Byeong-Yeong;Ko, Han-Seo;Ryu, Ki-O;Youn, Young;Park, Seong-Woo
    • 유체기계공업학회:학술대회논문집
    • /
    • 2006.08a
    • /
    • pp.545-546
    • /
    • 2006
  • A problem of oil supply for a reciprocating compressor is very significant for an evaluation of reliability. Since a rotational motion of a crank shaft for the reciprocating compressor with small capacity is used for a power source of oil supply, a centrifugal force of the rotational shaft provides a stroke of oil inside the shaft like a centrifugal pump. The pumped oil rises following an inner wall and provided to a bearing passed through an oil supply hole at the side of the shaft for lubrication of the bearing. In this study, the amount of oil supply has been investigated by a numerical analysis for various conditions such as a shape of a groove, rpm of the compressor, and a shape of a flow channel. Also, a method of increasing oil supply for a low rpm has been studied so that the function can be improved for a variable condition.

  • PDF

A Study on the Optimal System Sizing of the Standalone Photovoltaic Power Generation System for Uninterruptible Power Supply (독립형 태양광 발전 시스템의 무정전 전력공급을 위한 시스템 용량 최적 선정에 관한 연구)

  • Kim, Ki-Young;Choi, Woojin
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.23 no.2
    • /
    • pp.77-85
    • /
    • 2018
  • Renewable energy has been increasingly used and widely acclaimed as one of the solutions to rampant environmental problems. Among numerous kinds of renewable sources, the penetration rate of the PV system is relatively higher than that of others due to ease of installation. However, one disadvantage of the PV system is its dependence on weather condition. The PV system is especially critical when it is used for standalone systems because it cannot operate when the power generated from a PV module is not enough. Therefore, PV systems are often used with an energy storage system, such as batteries, to store backup energy when the weather condition is insufficient to supply power to the system. Blackout time can be reduced by increasing the size of the energy storage system, but it is a trade-off with system cost. In this work, optimal sizing of a standalone PV system is proposed to supply power to the system without blackout. The sizing of PV modules and batteries is performed by a simulation based on actual irradiation data collected during the past five years. The Life cycle costing of each system is evaluated to determine an optimal set of PV modules and batteries among several different combinations. The standalone PV system designed by the proposed method can supply power to the system with no interruption as long as the weather condition is similar to those of the past five years.

Investigation of present hygienic condition of rural area drinking water in Kunming 2004

  • Zhang, Liang;Wang, Xin;Liu, Xinhai
    • Proceedings of the Korean Environmental Health Society Conference
    • /
    • 2004.12a
    • /
    • pp.8-11
    • /
    • 2004
  • Objective To know about hygienic condition of drinking water in rural area of Kunming. Methods Selected 4 counties with different economy to investigate. In every county, according to the proportion, 10 drinking water spots were selected by randomization of lift drinking water'. Results In 4 areas, surface water for drinking is 82.41%, under water is 17.59%. And concentrated supply is 83.02% by populated proportion, others are 16.98%. 40 specimens qualification rate is 47.50%, and in it concentrated supply is 87.50%, others are 19.05%. Conclusion Unhealthy drinking water exist in most testing counties. Mainly microorganism isn't qualified. Concentrated management in drinking water is batter than other ways.

  • PDF

Extraction of Optimal Operation Condition of QAM Envelope Tracking System using Combined Cost Function of Bandwidth and Efficiency

  • Kim, Changwook;Park, Youngcheol
    • Journal of IKEEE
    • /
    • v.22 no.4
    • /
    • pp.1019-1024
    • /
    • 2018
  • In this paper, we suggest a combined cost function to find out the optimal operation of an envelope tracking system, and evaluated its performance with Quadrature Amplitude Modulation (QAM) waveform, with which envelope tracking coefficients for the peak drain efficiency and the bandwidth of power amplifiers are determined. Based on the classical envelope tracking theory, the operation of the supply modulator, which is a key part of the envelope tracking process, is modeled and analyzed mathematically. Then characteristics of the modulator by setting envelope shaping function as a cubic polynomial and sweeping the coefficients of this function was analyzed. By sweeping the coefficients, efficiency and bandwidth at each condition with 64-QAM signal was used to obtain optimal point of the supply modulator. Compared to the conventional shaping functions, the optimized function showed the bandwidth reduction by 12.7 percent point while the efficiency was maintained.

THE ANALYTIC ANALYSIS OF THE CORE INJECTION COOLING FLOW RATE FOR EMERGENCY WATER SUPPLY SYSTEM IN HANARO (하나로 비상 보충수 공급계통의 노심 주입 냉각유량 해석)

  • Park Yong-Chul;Kim Bong-Soo;Kim Kyung-Ryun;Wu Jong-Sub
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2005.10a
    • /
    • pp.39-44
    • /
    • 2005
  • In HANARO, a multi-purpose research reactor of 30 MWth, the emergency water supply system consists essentially of an emergency water storage tank located in the level of about thirteen meter (13 m) above the reactor core, a three inch ('3\%') diameter water injection pipe line including injection valves from the tank to the reactor cooling inlet pipe and a test loop to do periodic system performance test. When the water level of the reactor pool comes down to the extremely low due to a loss of reactor pool water accident the emergency water stored in the tank should be fed to the core by the gravity force and at that time the design flow rate is eleven point four kilogram per second (11.4 kg/s). But it is impossible periodically to measure the injection flow rate under the emergency condition because the normal water level should be maintained during the reactor operation. This paper describes a flow network analysis to simulate the flow rate under the emergency condition. As results, it was confirmed through the analysis results that the calculated flow rate agrees with the design requirement under the emergency condition.

  • PDF

A Study on the Reaching Time of Setting Temperature with Ventilation Air (급기환기량에 따른 공조기의 설정온도 도달특성 분석 연구)

  • Kang Tae-Wook
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.30 no.1
    • /
    • pp.50-57
    • /
    • 2006
  • This study describes to analyze the cooling load characteristics for a room air conditioner as a function of supply ventilation air when an air conditioner is running An experimental apparatus consists of a test room, a room air conditioner, a humidifier, an electrical heater a supply fan and a controller The reaching time to the inside setting temperature of the room air conditioner with is evaluated theoretically and experimentally in a conditioned space cooling loads such as supply ventilation air, lighting, occupancy and infiltration. In the conditions of cooling loads for the supply ventilation air of 9.5 L/s(0.98 ACH). lights. one Person, and infiltration, the reaching time to the inside setting temperature ($27\;^{\circ}C$ dry-bulb) increases up to $35\%$ more than for no supply ventilation air condition. Theoretical modelling of the reaching time shows good agreement with experimental results.

Look-ahead Based Distribution Planning for Capacitated Multi-stage Supply Chains (생산 능력 제한이 존재하는 다단계 공급망을 위한 Look-ahead 기반의 분배계획)

  • Roh, Joo-Suk;Kwon, Ick-Hyun;Kim, Sung-Shick
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.5
    • /
    • pp.139-150
    • /
    • 2006
  • The aim of this study is to establish an efficient distribution planning for a capacitated multi-stage supply chain. We assume that the demand information during planning horizon is given a deterministic form using a certain forecasting method. Under such a condition, we present a cost effective heuristic method for minimizing chain-wide supply chain inventory cost that is the sum of holding and backorder costs by using look-ahead technique. We cope with the capacity restriction constraints through look-ahead technique that considers not only the current demand information but also future demand information. To evaluate performance of the proposed heuristic method, we compared it with the extant research that utilizes echelon stock concept, under various supply chain settings.

A Study on the Ventilation Effect by Establishment Location of Supply Opening and Exhaust Fan of Bathroom in Apartment House (공동주택 화장실의 급기구 및 배기팬 설치 위치에 따른 환기효과에 관한 연구)

  • 함진식
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2002.11a
    • /
    • pp.321-326
    • /
    • 2002
  • To design mechanical ventilation for bathroom of apartment houses where air supply and exhaust are taken Into consideration, mock-ups of ventilation systems, widely used in bathroom of apartment houses with an area of 100$m^2$, were made and installed in a laboratory, These ventilation mock-ups were available for control of air supply and exhaust, and the size of supply openings were 40cm$\times$1cm, 40cm$\times$3cm, 40cm$\times$5cm. They were installed at five positions, spaced 40cm at a height of 25cm from the floor. and the position of exhaust fans were four corners and center Exhaust fan established each one on corner of the ceiling and one in center. As result that measure ventilation effect by each condition, size of hole that supply air is big, and ventilation effect took effect to be good establishment location is low, Also, distance of exhaust fan is far with hole that supply air, ventilation effect took effect by superior thing.

  • PDF

A Review of Power Supply Technology of Electrodeless lamps (무전극 램프의 전원장치에 대한 기술 동향)

  • 한수빈;박석인;정봉만;장우진;함중걸
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2002.11a
    • /
    • pp.197-200
    • /
    • 2002
  • This paper reviews electrodeless lamp technology. The lamp has very long life time but very high cost compared to conventional lamps such as fluorescent lamp. For optimizing the overall system in performance and cost power supply as well as lamp is very important. First, the paper describes various electrodeless lamps and its market condition. Then, a lot of circuit technology for constructing the power supply is reviewed and circuit characteristics are discussed

  • PDF

A Study on the design and evaluation of connection pipes for stable water supply (용수공급 안정화를 위한 연계관로 설계 및 평가)

  • Chang, Yong-Hoon;Kim, Ju-Hwan;Jung, Kwan-Soo
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.26 no.2
    • /
    • pp.249-256
    • /
    • 2012
  • The paper describes a design methodology that can select a proper reliability factor and apply the selected reliability factor into the real water distribution system. Reliability factors which are used for the assesment of water supply networks, can be categorized by a connectivity, a reachability, an expected shortage and an availability. Among these factors, an expected shortage is the most proper reliability factor in the aspect of economic evaluation. Therefore, the expected shortage is applied to draw a water supply reliability into Changwon water supply systems. And the economic pipe diameter can be determined as 600mm for a connection pipe in the pipe network from the estimation of the expected shortage. Also, a quantitative effect of the connection pipe can be expressed in terms of the reduction, which is estimated by the expected shortage of 30,269$m^{3}$ from 68,705$m^{3}$ at initial condition to 38,436$m^{3}$ under the connected condition with the diameter 600mm pipe.