Mansour, Henda Ben;Chaarabi, Lotfi;Jelassi, Khaled;Guerrero, Josep M.
International Journal of Computer Science & Network Security
/
v.22
no.3
/
pp.355-363
/
2022
This paper presents the modeling for islanded hybrid AC/DC microgrid and the verification of the proposed supervisory controller for energy management for this microgrid. The supervisory controller allows the microgrid system to operate in different power flows through the proposed control algorithm, it has several roles in the management of the energy flow between the different components of the microgrid for reliable operation. The proposed microgrid has both essential objectives such as the maximum use of renewable energies resources and the reduction of multiple conversion processes in an individual AC or DC microgrids. The microgrid system considered for this study has a solar photovoltaic (PV), a wind turbine (WT), a battery (BT), and a AC/DC loads. A small islanded hybrid AC/DC microgrid has been modeled and simulated using the MATLAB-Simulink. The simulation results show that the system can maintain stable operation under the proposed supervisory controller when the microgrid is switched from one operating mode of energy flow to another.
The paper studies design of a decentralized supervisory controller with 2-level hierarchical structure for complex discrete event systems. Hierarchical structure with strict output-control-consistency(SOCC) gives a more abstract model for high-level control. The decentralized controller for a simple and abstract high-level system is designed more easily if the decentralized supervisory control problem in 2-level hierarchical structure systems(DSCP2) is solvable.
Journal of the Korean Professional Engineers Association
/
v.26
no.3
/
pp.69-79
/
1993
This paper explains about general considerations and project management for a State of the Art utility supervisory systems. [1] The implementation and management of a supervisory system design project requires both a dedication of resources and application of good communications in order to be suc-cessful. [2] Success is on time delivery of a system to a satisfied customer at the proposal cost, [3] The recent experience of a company plus the collected comments from a number of ex-perienced control center project management provide a guideline for the company who is considering such a project. The Comments reflect typical situations or decision points faced by the project Manage.[2] This paper also attempts to help engineers in the task of specifying buying, and instal-ling a supervisory system[1]
Lee Jeong Wan;Yoo Neung Soo;Nam Yoon Su;Cho Byung Ha
한국신재생에너지학회:학술대회논문집
/
2005.06a
/
pp.9-12
/
2005
In this paper. we offer a new monitoring system that controls all of the windfar. it can also apply use general wind turbine systems and real meteorological tower. We propose a hierarchical releiable monitoring system connected by wireless communication channels between monitoring host computer and modular slave measuring subsystems. Our system has two hierarchical subsystems: slave measuring systems, and supervisory host computer. We design and implement that the slave measuring subsystems is placed in meteorological tower and wind turbines, and the supervisory host computer in safety zone, The micro-controller in slave measuring system is duplicated using cold-standby method for reliability. The host computer and slave system constructs a feedback system, with wireless communication channel between them. For monitoring and command function, the supervisory computer is implemented with a Personal Computer using graphic user interface. Consequently. we can get a reliable but economic system.
Journal of the Korean Society of Manufacturing Technology Engineers
/
v.23
no.1
/
pp.15-20
/
2014
The manufacturing equipment on most shop floors consists of numerical control machines, and the condition of each piece of equipment is monitored and controlled by an internal sensor or programmable logic controller (PLC). To control and monitor production lines that consist of an equipment or production module, a separate control and monitoring system such as a manufacturing execution system should be introduced. However, there is no standardized system, and it is costly and difficult to build a system for small or medium-sized plants. In this paper, a PLC-based supervisory system for operation control of a group of production machines is proposed, and the developed PLC-based system is evaluated by applying it to a computer numerical control machine.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.48
no.9
/
pp.1112-1118
/
1999
A major objective of the study is to propose a supervisory control algorithm based on the discrete event dynamic system (DEDS) model and apply it to the automation of nuclear operations. The study is motivated by the suitability of the DEDS model for simulation of man-made control action and the potential of the DEDS based supervisory control algorithm for enhanced licensibility, when implemented in nuclear plants, through design transparency due to strong analytic backgrounds. The DEDS model can analytically show the robust stability of the proposed supervisory controller providing design transpareney for enhanced licensibility when implemented in nuclear operations.
Journal of the Korean Institute of Telematics and Electronics
/
v.24
no.4
/
pp.568-576
/
1987
This paper describes the functional enhancement of the supervisory control system for a remote manipulator. For working in delicate assembly jobs as well as in hazardous environments, appropriate control modes such as computer mode, manual mode including commercially available modes are selected.
Journal of Institute of Control, Robotics and Systems
/
v.7
no.1
/
pp.1218-1225
/
2001
This paper presents a design procedure for the supervisory controller(SC) of the high-speed train car. The proposed SC manages control logic and scenario of the overall train system, and monitors input/output signals among the sub-controllers in the system, The roles and functions of each sub-control system are defined, and the interfaces among the control systems are developed. Train control system is modeled with automata, and the model is implemented into a program using a computer-aided software engineering(CASE) tool, Object GEODE, The designed SC is verified and evaluated by using simulation. The SC is shown to successfully perform the designed functions without any errors.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.28
no.2
/
pp.84-91
/
2014
This paper introduces the application of supervisory monitoring system for substation automation based on IEC 61850. The objective of proposed system is detection of such a malfunction or degradation of devices. The supervisory monitoring procedure consists of a two step - topology processor and state estimation. The topology processor using artificial intelligence is a preprocessing step of state estimation. Topology processor identifies the topology structure of switches in substation and detects an error of ON/OFF state data. The state estimation is an algorithm that minimizes an error between optimal estimation values and real values. The proposed system is applied to standard digital substation based on IEC 61850 for performance verification.
We proposed in this paper a systematic way for analyzing discrete event dynamic systems to classify faults and failures quantitatively and to find tolerable fault event sequences embedded in the system. An automated failure diagnosis scheme with respect to the nominal normal operating event sequences and the supervisory control problem for tolerable fault event sequences is presented. Moreover the supervisor failure diagnosis problem with respect to the tolerable fault event sequences is considered. Finally, a plasma etching system example is presented.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.