• 제목/요약/키워드: Super-lift technique

검색결과 3건 처리시간 0.017초

Analysis and Implementation of High Step-Up DC/DC Convertor with Modified Super-Lift Technique

  • Fani, Rezvan;Farshidi, Ebrahim;Adib, Ehsan;Kosarian, Abdolnabi
    • Journal of Power Electronics
    • /
    • 제19권3호
    • /
    • pp.645-654
    • /
    • 2019
  • In this paper, a new high step up DC/DC converter with a modified super-lift technique is presented. The coupled inductor technique is combined with the super-lift technique to provide a tenfold or more voltage gain with a proper duty cycle and a low turn ratio. Due to a high conversion ratio, the voltage stress on the semiconductor devices is reduced. As a result, low voltage ultra-fast recovery diodes and low on resistance MOSFET can be used, which improves the reverse recovery problems and conduction losses. This converter employs a passive clamp circuit to recycle the energy stored in the leakage inductance. The proposed convertor features a high conversion ratio with a low turn ratio, low voltage stress, low reverse recovery losses, omission of the inrush currents of the switch capacitor loops, high efficiency, small volume and reduced cost. This converter is suitable for renewable energy applications. The operational principle and a steady-state analysis of the proposed converter are presented in details. A 200W, 30V input, 380V output laboratory prototype circuit is implemented to confirm the theoretical analysis.

교좌장치 겸용 웨지잭을 이용한 교좌장치 보수공법 (Technique for Bridge Bearing Retrofit Using Wedge-Jack)

  • 백동명;유문식;임진석
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1999년도 학회창립 10주년 기념 1999년도 가을 학술발표회 논문집
    • /
    • pp.837-843
    • /
    • 1999
  • A common hydraulic jack using brdige retrofit has a problem of increasing cost and time of construction to construct additionally temporary bent or concrete bracket, in case of insufficiency work space and release hydraulic pressure. To solve the problem, this technique is developed to alternate the bridge bearing in adequate inspection condition. After control maximum lift-height and minimum lift-force of no damage to super structure, the constructive technique is to alternate and repair the bridge bearing using the wedge jack with bridge bearing ability that is no release hydraulic pressure stopper, and able to reuse separable cylinder.

  • PDF

건설공사 적시생산(Just-ln-Time)을 위한 조달시스템 개발 - 콘크리트 타설 공사를 중심으로 - (Development of the procurement system for Just-in-Time Building Construction)

  • 신봉수;김창덕
    • 한국건설관리학회논문집
    • /
    • 제5권6호
    • /
    • pp.235-244
    • /
    • 2004
  • 도심지의 대형 공사를 그것도 짧은 공기 내에 수행함에 있어 가장 중요한 과제로 부각되는 것은 건설 주요 자원의 효율적인 관리이다. 즉 자재, 인원, 장비 등의 적기적소 조달이 주요 관리 항목이 되고 있다. 또한, 자원의 적기적소 조달을 위한 생산 단계별 생산주체간의 효율적인 정보의 교환은 성공적인 공사 수행에 절대적인 영향을 끼치게 된다. 따라서 이러한 정보를 효율적으로 관리하여 주요 자원을 조달, 운반, 양중, 적치, 설치 각 단계별로 관리할 수 있도록 하는 주요 자원 관리 시스템의 개발이 필수적이다 본 연구에서는 자동차 제조 산업 등 타 산업분야에서 성공적으로 사용된 적시생산의 기본적인 원리와 정보전달기법, 즉 간판시스템의 기본개념을 응용하여 건설프로젝트 자원정보관리시스템을 개발하였다. 또한, 이 시스템을 콘크리트 타설 공사에 적용하였다. 현장의 콘크리트 공사 흐름을 분석한 후, 가치흐름맵핑(VSM)을 통해 정보관리 개선 후 개선모델(FSM)을 제시하고, 이를 실제 초고층주상복합 건물현장의 자원정보관리에 적용하였다. 또한 현장 적용 시 도출된 적용성 등 문제점을 보완하여, 시스템의 추후 사용성을 제고하였다.